2014-18390. Drawbridge Operation Regulation; Willamette River, Portland, OR  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that govern four Multnomah County bridges: The Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Start Printed Page 45345Portland, OR. This deviation is necessary to accommodate the annual Portland Providence Bridge Pedal event. This deviation allows the bridges to remain in the closed position to allow safe roadway movement of event participants.

    DATES:

    This deviation is effective from 6 a.m. on August 10, 2014, to 12:30 p.m. on August 10, 2014.

    ADDRESSES:

    The docket for this deviation, [USCG-2014-0609] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email Steven.M.Fischer3@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Multnomah County has requested a temporary deviation from the operating schedule for the Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Portland, OR. The requested deviation is to accommodate the annual Providence Bridge Pedal event. To facilitate this event, the draws of the bridges will be maintained in the closed-to-navigation positions as follows: The Broadway Bridge, mile 11.7; the Burnside Bridge, mile 12.4; Morrison Bridge, mile 12.8; and the Hawthorne Bridge, mile 13.1, need not open for vessel traffic from 6 a.m. on August 10, 2014, to 12:30 p.m. on August 10, 2014. Vessels which do not require bridge openings may continue to transit beneath these bridges during this closure period. The Broadway Bridge, mile 11.7, provides a vertical clearance of 90 feet in the closed position, the Burnside Bridge, mile 12.4, provides a vertical clearance of 64 feet in the closed position, the Morrison Bridge, mile 12.8, provides a vertical clearance of 69 feet in the closed position, and the Hawthorne Bridge, mile 13.1, provides a vertical clearance of 49 feet in the closed position; all clearances are referenced to the vertical clearance above Columbia River Datum 0.0. The current operating schedule for all four bridges is set out in 33 CFR 117.897. The normal operating schedule for all four bridges state that they need not open from 7 a.m. to 9 a.m., and from 4 p.m. to 6 p.m. Monday through Friday. This deviation period is from 6 a.m. on August 10, 2014, to 12:30 p.m. August 10, 2014. The deviation allows the Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, across the Willamette River, to remain in the closed position and need not open for maritime traffic from 6 a.m. to 12:30 p.m. on August 10, 2014. The four bridges shall operate in accordance to 33 CFR § 117.897 at all other times. Waterway usage on this stretch of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft. Vessels able to pass through the bridge in the closed positions may do so at any time. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridges so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedules immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: July 18,2014.

    Steven M. Fischer,

    Bridge Administrator, Thirteenth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2014-18390 Filed 8-4-14; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
8/10/2014
Published:
08/05/2014
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2014-18390
Dates:
This deviation is effective from 6 a.m. on August 10, 2014, to 12:30 p.m. on August 10, 2014.
Pages:
45344-45345 (2 pages)
Docket Numbers:
Docket No. USCG-2014-0609
PDF File:
2014-18390.pdf
CFR: (1)
33 CFR 117