2015-19207. Crown Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Proceeding: Amendment of License.

    b. Project No.: 11175-025.

    c. Date Filed: April 30, 2015.

    d. Licensee: Crown Hydro, LLC.

    e. Name of Project: Crown Mill Hydroelectric Project.

    f. Location: The 3.4-Megawatt (MW) Crown Mill Hydroelectric Project would be located on U.S. Army Corps of Engineers (“Corps”) lands within the campus of the Upper St. Anthony Falls Lock and Dam on the Mississippi River, in the City of Minneapolis, Hennepin County, Minnesota.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Licensee Contact: Donald H. Clarke and Joshua E. Adrian, Duncan, Weinberg, Genzer & Pembroke, P.C., 1615 M Street NW., Washington, DC 20036, Telephone: (202) 467-6370, Email: dhc@dwgp.com, jea@dwgp.com.

    i. FERC Contact: Mr. M Joseph Fayyad, (202) 502-8759, mo.fayyad@ferc.gov.

    j. Deadline for filing comments, interventions and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-11175-025.

    k. Description of Request: The licensee proposes to move the project site about 250 feet north to a property owned by the U.S. Army Corps of Engineers (“Corps”) within the campus of the Upper St. Anthony Falls Lock and Dam that is adjacent to the as-licensed site. The most significant difference will be that the Crown Project will move the location of the powerhouse and will be using a new tunnel tailrace as opposed to connecting to an old existing tunnel.

    l. This filing may be viewed on the Commission's Web site at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction in the Commission's Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: July 30, 2015.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2015-19207 Filed 8-4-15; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
08/05/2015
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2015-19207
Pages:
46573-46573 (1 pages)
Docket Numbers:
Project No. 11175-025
PDF File:
2015-19207.pdf