Reporting Burden
CFR part 230 section/FRA form name and number Respondent universe Annual responses Average time per response (hours) Total annual burden hours Wage rate Total cost equivalent U.S.D. (A) (B) (A * B = C) (D) 6 (E = C * D) FRA F 1: 31 and 92 Service Day Inspection Report 82 steam owners operators 480 0.33 160.00 89.13 $14,260.80 FRA F 2: Daily Locomotive Inspection Report 82 steam owners operators 3,650 0.17 608.33 89.13 54,220.45 FRA F 3: Annual Inspection Report 82 steam owners operators 115 0.5 57.50 89.13 5,124.98 FRA F 4: Boiler Specification Card 82 steam owners operators 12 0.5 6.00 89.13 534.78 FRA F 5: Locomotive Service Day Report 82 steam owners operators 150 0.25 37.50 89.13 3,342.38 FRA F 19: Report of Alteration or Welded or Riveted Repair 82 steam owners/operators 10 1 10.00 89.13 891.30 Forms Subtotal 4,417 879.33 78,374.68 230.6—Waivers: (a)—Waivers 1 1.00 1.00 89.13 89.13 230.12—Movement of non-complying steam locomotives: (b)—Conditions for movement (tagging) 82 steam owners/ operators 10 0.10 1.00 69.60 69.60 230.14—Thirty-one (31) service day inspection: (b)—FRA notification of 31 service day inspection 82 steam owners/operators 360 0.08 30.00 89.13 2,673.90 230.16—Annual inspection: (b)—FRA notification of annual inspection 82 steam owners/operators 120 0.08 10.00 89.13 891.30 230.19—Posting of FRA Form No. 1 and FRA Form No. 3: (a) and (b)—Posting of forms 82 steam owners/operators 662 0.08 52.96 89.13 4,720.32 230.21—Steam locomotive number change: —Number change 82 steam owners/operators 1 0.03 0.03 89.13 2.67 230.22—Accident reports: The burden hours associated with this requirement are included OMB Control No. 2130-0500. Consequently, there is no additional burden associated with this requirement. 230.33—Welded repairs and alterations: (a)—Written requests to FRA 82 steam owners/operators 8 2.00 16.00 89.13 1,426.08 230.34—Riveted repairs and alterations: (a)—Written requests 82 steam owners/operators 2 2.00 4.00 89.13 356.52 230.46—Badge plates: —Attaching of metal badge plate 82 steam owners/operators 3 2.00 6.00 69.60 417.60 230.47—Boiler number: (a)—Stamped boiler number 82 steam owners/operators 1 1.00 1.00 69.60 69.60 230.49—Setting of safety relief valves: (d)—Labeling of lowest set pressure 5 1.00 5.00 69.60 348.00 230.60—Time of washing: The burden for this requirement is included above in the burden listed under §§ 230.15 and 230.16. Consequently, there is no additional burden associated with this requirement. 230.75—Stenciling dates of tests and cleaning: —Stenciling 82 steam owners/operators 50 0.50 25.00 69.60 1,740.00 230.96—Main, side, and valve motion rods: (b)—Written request for repairs 82 steam owners/operators 1 2.00 2.00 89.13 178.26 230.98 Driving, trailing, and engine truck axles: (b)—Journal diameter stamped 82 steam owners/operators 1 0.25 0.25 69.60 17.40 230.116—Oil tanks: —Marking of hand operated locations 82 steam owners/operators 30 0.50 15.00 69.60 1,044.00 Subtotal 1,255 169.24 14,044.39 Total7 82 steam owners/operators 5,672 N/A 1,049 N/A 92,419
Document Information
- Published:
- 08/05/2024
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Action:
- Notice of information collection; request for comment.
- Document Number:
- 2024-17186
- Dates:
- Interested persons are invited to submit comments on or before October 4, 2024.
- Pages:
- 63469-63471 (3 pages)
- Docket Numbers:
- Docket No. FRA-2024-0014
- PDF File:
- 2024-17186.pdf