96-19933. Federal Register Notice of Amendment To Change Reclamation Milestone Date in source material license SUA-551 Held by Petrotomics Company for its Shirley Basin, Wyoming Uranium Mill  

  • [Federal Register Volume 61, Number 152 (Tuesday, August 6, 1996)]
    [Notices]
    [Page 40864]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-19933]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Number 40-6659]
    
    
    Federal Register Notice of Amendment To Change Reclamation 
    Milestone Date in source material license SUA-551 Held by Petrotomics 
    Company for its Shirley Basin, Wyoming Uranium Mill
    
    AGENCY: U.S. Nuclear Regulatory Commission.
    
    ACTION: Amendment of Source Material License SUA-551 to change a 
    reclamation milestone date.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
    Commission has amended Petrotomics Company's (Petrotomics') Source 
    Material License SUA-551 for Shirley Basin Wyoming to change a 
    reclamation milestone date. This amendment was requested by Petrotomics 
    by letter dated May 22, 1996, and its receipt by NRC was noticed in the 
    Federal Register on June 28, l996.
        The license amendment modifies License Condition 50 to change the 
    completion date for a site-reclamation milestone. The new date approved 
    by the NRC extends completion of placement of final radon barrier on a 
    9-acre portion of the tailings pile by four years, and two months. 
    Petrotomics justifies the delays for (1) maintaining, throughout the 
    course of reclamation of the site, an area that can be utilized to 
    place contaminated material that may be encountered in accomplishing 
    this work; (2) disposal of the evaporation pond dike material; and (3) 
    allowing continued pumping and maintenance of well 12-DC, located in 
    the southern part of the area, if necessary. Based on the review of 
    Petrotomics' submittal, which indicates the proposed work is scheduled 
    to be completed as expeditiously as practicable, and the fact that the 
    added risk to the public health and safety is not significant, the NRC 
    staff considers Petrotomics' request acceptable.
        An environmental assessment is not required since this action is 
    categorically excluded under 10 CFR 51.22(c)(11), and an environmental 
    report from the licensee is not required by 10 CFR 51.60(b)(2).
    
    SUPPLEMENTARY INFORMATION: Petrotomics' license, including an amended 
    License Condition 50, and the NRC staff's technical evaluation of the 
    amendment request are being made available for public inspection at the 
    NRC's Public Document Room at 2120 L Street, NW (Lower Level), 
    Washington, DC 20555.
    
    FOR FURTHER INFORMATION CONTACT: Mohammad W. Haque, Uranium Recovery 
    Branch, Division of Waste Management, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555. Telephone (301) 415-6640.
    
        Dated at Rockville, Maryland, this 31st day of July 1996.
    Joseph J. Holonich,
    Chief, Uranium Recovery Branch, Division of Waste Management, Office of 
    Nuclear Material Safety and Safeguards.
    [FR Doc. 96-19933 Filed 8-5-96; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
08/06/1996
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Amendment of Source Material License SUA-551 to change a reclamation milestone date.
Document Number:
96-19933
Pages:
40864-40864 (1 pages)
Docket Numbers:
Docket Number 40-6659
PDF File:
96-19933.pdf