    Consolidated Edison Company of New York, Inc., et al. Electric 
    Rate and Corporate Regulation Filings
    
    July 29, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER97-3643-000]
    
        Take notice that on July 8, 1997, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a Supplement to Con 
    Edison Rate Schedule FERC No. 112 for transmission service for New York 
    State Electric & Gas Corporation (NYSEG). Con Edison has requested a 
    waiver so that the supplement can be effective as of April 1, 1997, 
    consistent with the terms of Rate Schedule 112.
        Con Edison states that a copy of this filing has been served by 
    mail upon NYSEG.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER97-3644-000]
    
        Take notice that on July 8, 1997, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a service agreement to 
    provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to Virginia Power--The Wholesale Power Group 
    (Virginia).
        Con Edison states that a copy of this filing has been served by 
    mail upon Virginia.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER97-3645-000]
    
        Take notice that on July 8, 1997, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a service agreement to 
    provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to PanEnergy Trading & Market Services, L.L.C. 
    (PanEnergy).
        Con Edison states that a copy of this filing has been served by 
    mail upon PanEnergy.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER97-3646-000]
    
        Take notice that on July 8, 1997, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a service agreement to 
    provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to Engage Energy US, L.P. (Engage).
    
    [[Page 42247]]
    
        Con Edison states that a copy of this filing has been served by 
    mail upon Engage.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Wisconsin Public Service Corporation
    
    [Docket No. ER97-3648-000]
    
        Take notice that on July 8, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and NP Energy Inc., provides for 
    transmission service under the Open Access Transmission Service Tariff, 
    FERC Original Volume No. 11.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Wisconsin Public Service Corporation
    
    [Docket No. ER97-3649-000]
    
        Take notice that on July 8, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and itself. The Agreement provides for 
    transmission service under the Open Access Transmission Service Tariff, 
    FERC Original Volume No. 11.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Sierra Pacific Power Company
    
    [Docket No. ER97-3650-000]
    
        Take notice that on July 8, 1997, Sierra Pacific Power Company 
    (Sierra), tendered for filing pursuant to Section 205 of the Federal 
    Power Act and 18 CFR Part 35, an energy rate adjustment (including 
    displacement credit) pursuant to an Electric Service Agreement between 
    Sierra and Truckee Donner Public Utility District. (District).
        Sierra asserts that the filing has been served on the District and 
    on the regulatory commissions of Nevada and California.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Sierra Pacific Power Company
    
    [Docket No. ER97-3651-000]
    
        Take notice that on July 8, 1997, Sierra Pacific Power Company 
    (Sierra), tendered for filing pursuant to Section 205 of the Federal 
    Power Act and 18 CFR Part 35, an energy rate adjustment pursuant to an 
    Electric Service Agreement between Sierra and City of Fallon (Fallon).
        Sierra asserts that the filing has been served on Fallon and on the 
    regulatory commissions of Nevada and California.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Virginia Electric and Power Company
    
    [Docket No. ER97-3652-000]
    
        Take notice that on July 8, 1997, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing Service Agreements for 
    Non-Firm Point-to-Point Transmission Service with Public Service 
    Electric and Gas Company and GPU Energy under the Open Access 
    Transmission Tariff to Eligible Purchasers dated July 9, 1996. Under 
    the tendered Service Agreement Virginia Power will provide firm point-
    to-point service to the Transmission Customers as agreed to by the 
    parties under the rates, terms and conditions of the Open Access 
    Transmission Tariff.
        Copies of the filing were served upon the Virginia State 
    Corporation Commission, and the North Carolina Utilities Commission.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10-11. Indianapolis Power & Light Company
    
    [Docket No. ER97-3653-000]
    
        Take notice that on July 8, 1997, Indianapolis Power & Light 
    Company (IPL), tendered for filing a letter agreement extending by one 
    year to August 31, 1998, the service IPL currently provides to PSI 
    Energy, a public utility subsidiary of Cinergy, under an existing 
    interconnection agreement.
        Copies of this filing were sent to the Indiana Utility Regulatory 
    Commission and Cinergy.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Indianapolis Power & Light Company
    
    [Docket No. ER97-3654-000]
    
        Take notice that on July 8, 1997, Indianapolis Power & Light 
    Company (IPL), tendered for filing an amendment to an existing 
    agreement between IPL and Wabash Valley Power Association, Inc. (Wabash 
    Valley).
        Copies of this filing were sent to the Indiana Utility Regulatory 
    Commission and Wabash Valley.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Wisconsin Public Service Corporation
    
    [Docket No. ER97-3655-000]
    
        Take notice that on July 8, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and itself. The Agreement provides for 
    transmission service under the Open Access Transmission Service Tariff, 
    FERC Original Volume No. 11.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Wisconsin Public Service Corporation
    
    [Docket No. ER97-3656-000]
    
        Take notice that on July 8, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and Upper Peninsula Power Co. The 
    Agreement provides for transmission service under the Open Access 
    Transmission Service Tariff, FERC Original Volume No. 11.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Wisconsin Public Service Corporation
    
    [Docket No. ER97-3657-000]
    
        Take notice that on July 8, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and Wisconsin Power & Light Company. The 
    Agreement provides for transmission service under the Open Access 
    Transmission Service Tariff, FERC Original Volume No. 11.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Northeast Utilities Service Company
    
    [Docket No. ER97-3658-000]
    
        Take notice that on July 8, 1997, Northeast Utilities Service 
    Company (NUSCO), tendered for filing, a Service Agreement with Green 
    Mountain Power Corp. (GMP) under the NU System Companies' System Power 
    Sales/Exchange Tariff No. 6. NUSCO requested deferral of Commission 
    action on the filing until NUSCO made its filing for functional 
    unbundling of services under the Tariff pursuant to the Commission's 
    Order No. 888.
        NUSCO states that a copy of this filing has been mailed to GMP.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 42248]]
    
    17. Virginia Electric and Power Company
    
    [Docket No. ER97-3659-000]
    
        Take notice that on July 8, 1997, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing Service Agreements for 
    Firm Point-to-Point Transmission Service with PECO Energy--Power Team 
    and The Wholesale Power Group under the Open Access Transmission Tariff 
    to Eligible Purchasers dated July 9, 1996. Under the tendered Service 
    Agreement Virginia Power will provide firm point-to-point service to 
    the Transmission Customers as agreed to by the parties under the rates, 
    terms and conditions of the Open Access Transmission Tariff.
        Copies of the filing were served upon the Virginia State 
    Corporation Commission, and the North Carolina Utilities Commission.
        NUSCO requests that the Service Agreement become effective July 1, 
    1997.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Virginia Electric and Power Company
    
    [Docket No. ER97-3660-000]
    
        Take notice that on July 8, 1997, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing executed Service 
    Agreements between Virginia Electric and Power Company and 
    Constellation Power Source, Inc., and NP Energy, Inc., under the Power 
    Sales Tariff to Eligible Purchasers dated May 27, 1994, as revised on 
    December 31, 1996. Under the tendered Service Agreements Virginia Power 
    agrees to provide services to Constellation Power Source, Inc., and NP 
    Energy, Inc., under the rates, terms and conditions of the Power Sales 
    Tariff as agreed by the parties pursuant to the terms of the applicable 
    Service Schedules included in the Power Sales Tariff.
        Copies of the filing were served upon the Virginia State 
    Corporation Commission, and the North Carolina Utilities Commission.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Central Power and Light Company; Public Service Company of 
    Oklahoma; Southwestern Electric Power Company; West Texas Utilities 
    Company
    
    [Docket No. ER97-3661-000]
    
        Take notice that on July 8, 1997, Central Power and Light Company 
    (CPL), Public Service Company of Oklahoma (PSO), Southwestern Electric 
    Power Company (SWEPCO) and West Texas Utilities Company (WTU) 
    (collectively, the Companies) each tendered for filing Service 
    Agreements establishing NP Energy Inc., and PacifiCorp Power Marketing, 
    Inc., as customers under the terms of each Company's CSRT-1 Tariff.
        The Companies request an effective date of June 8, 1997 for each of 
    the service agreements and, accordingly, seek waiver of the 
    Commission's notice requirements. Copies of this filing were served on 
    the two customers, the Arkansas Public Service Commission, the 
    Louisiana Public Service Commission, the Oklahoma Corporation 
    Commission and the Public Utility Commission of Texas.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. San Diego Gas & Electric Company
    
    [Docket No. ER97-3662-000]
    
        Take notice that on July 8, 1997, San Diego Gas & Electric Company 
    (SDG&E), tendered for filing and acceptance, pursuant to 18 CFR 35.13, 
    a Service Agreement (Service Agreement) with San Diego Gas & Electric 
    Co. (Energy Trading) for Point-To-Point Transmission Service under 
    SDG&E's Open Access Transmission Tariff (Tariff) filed in compliance 
    with FERC Order No. 888.
        SDG&E filed the executed Service Agreement with the Commission in 
    compliance with applicable Commission regulations. SDG&E also provided 
    Sheet No. 114 (Attachment E) to the Tariff, which is a list of current 
    subscribers. SDG&E requests waiver of the Commission's notice 
    requirement to permit an effective date of July 1, 1997 for the Service 
    Agreement.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Tucson Electric Power Company
    
    [Docket No. ER97-3665-000]
    
        Take notice that on July 9, 1997, Tucson Electric Power Company 
    (TEP), tendered for filing two (2) service agreements for firm point-
    to-point transmission service and three (3) service agreements for non-
    firm point-to-point transmission service under Part II of its Open 
    Access Transmission Tariff filed in Docket No. OA96-140-000. TEP 
    requests waiver of notice to permit the service agreements to become 
    effective as of June 15, 1997. The service agreements are as follows:
        (1) Service Agreement for Non-Firm Point-to-Point Transmission 
    Service with e prime, Inc., dated May 27, 1997.
        (2) Service Agreement for Firm Point-to-Point Transmission Service 
    with Enron Power Marketing, Inc., dated June 23, 1997.
        (3) Service Agreement for Firm Point-to-Point Transmission Service 
    with Enron Power Marketing, Inc., dated June 27, 1997.
        (4) Service Agreement for Non-Firm Point-to-Point Transmission 
    Service with El Paso Electric Co., Inc., dated July 3, 1997.
        (5) Service Agreement for Non-Firm Point-to-Point Transmission 
    Service with WESCO (Williams Energy Services Company) dated July 7, 
    1997.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Columbia Power Marketing Corporation
    
    [Docket No. ER97-3667-000]
    
        Take notice that on July 9, 1997, Columbia Power Marketing 
    Corporation (CPM), tendered for filing with the Federal Energy 
    Regulatory Commission, CPM's Rate Schedule No. 1, which permits CPM to 
    make wholesale power sales at market-based rates.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Atlantic City Electric Company
    
    [Docket No. ER97-3668-000]
    
        Take notice that on July 9, 1997, Atlantic City Electric Company 
    (Atlantic Electric), tendered for a filing service agreement under 
    which Atlantic Electric will sell capacity and energy to EnerZ 
    Corporation under Atlantic Electric's market-based rate sales tariff. 
    Atlantic Electric requests the agreement be accepted to become 
    effective on July 1, 1997.
        Atlantic Electric states that a copy of the filing has been served 
    on EnerZ Corporation.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Northeast Utilities Service Company
    
    [Docket No. ER97-3669-000]
    
        Take notice that on July 9, 1997, Northeast Utilities Service 
    Company (NUSCO), on behalf of The Connecticut Light & Power Company 
    (CL&P), tendered for filing pursuant to Section 205 of the Federal 
    Power Act and Section 35.13 of the Commission's Regulations, a rate 
    schedule change for sales of electric energy to the Wallingford 
    Electric Division (CL&P No. 514).
    
    [[Page 42249]]
    
        NUSCO states that a copy of this filing has been mailed to 
    Wallingford.
        NUSCO requests that the rate schedule become effective on August 1, 
    1997.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. Ohio Edison Company Pennsylvania Power Company
    
    [Docket No. ER97-3670-000]
    
        Take notice that on July 9, 1997, Ohio Edison Company, tendered for 
    filing on behalf of itself and Pennsylvania Power Company, a Service 
    Agreement with GPU Energy under Ohio Edison's Power Sales Tariff. This 
    filing is made pursuant to Section 205 of the Federal Power Act.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Ohio Edison Company; Pennsylvania Power Company
    
    [Docket No. ER97-3671-000]
    
        Take notice that on July 9, 1997, Ohio Edison Company tendered for 
    filing on behalf of itself and Pennsylvania Power Company, a Service 
    Agreement for Non-Firm Point-to-Point Transmission Service with Rainbow 
    Energy Marketing Corporation Inc., and Ohio Edison Company pursuant to 
    Ohio Edison's Open Access Tariff. This Service Agreement will enable 
    the parties to obtain Non-Firm Point-to-Point Transmission Service in 
    accordance with the terms of the Tariff.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Company, The Potomac Edison Company, and West Penn Power 
    Company (Allegheny Power)
    
    [Docket No. ER97-3672-000]
    
        Take notice that on July 9, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), filed Supplement 
    No. 21 to add NP Energy Inc., and Northeast Utilities Service Company 
    to Allegheny Power Open Access Transmission Service Tariff which has 
    been submitted for filing by the Federal Energy Regulatory Commission 
    in Docket No. OA96-18-000. The proposed effective date under the 
    Service Agreements is July 8, 1997.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. New York State Electric & Gas Corporation
    
    [Docket No. ER97-3674-000]
    
        Take notice that on July 9, 1997, New York State Electric & Gas 
    Corporation (NYSEG) tendered for filing a Notice of Cancellation of 
    NYSEG's Rate Schedule FERC No. 165 between NYSEG and Virginia Electric 
    and Power Company (VEPCO).
        NYSEG requests that this cancellation become effective on July 7, 
    1997.
        Notice of the proposed cancellation has been served upon the New 
    York State Public Service Commission and on the Customer.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Union Electric Company
    
    [Docket No. ER97-3675-000]
    
        Take notice that on July 9, 1997, Union Electric Company tendered 
    for filing Sixth Amendment dated as of June 24, 1997, modifying the 
    September 18, 1979, Interconnection Contract between City of Columbia, 
    Missouri, and Union Electric Company.
        Said Amendment primarily provides for an increased rate cap to the 
    reservation charge for Short-Term Non-Firm Power.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Southwestern Public Service Company
    
    [Docket No. ER97-3676-000]
    
        Take notice that on July 10, 1997, Southwestern Public Service 
    Company (Southwestern) submitted an executed service agreement under 
    its open access transmission tariff with Tenaska Power Services 
    Company. The service agreement is for umbrella non-firm point-to-point 
    transmission service.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Company, The Potomac Edison Company and West Penn Power 
    Company (Allegheny Power)
    
    [Docket No. ER97-3673-000]
    
        Take notice that on July 9, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Supplement 
    No. 27 to add two (2) new Customers to the Standard Generation Service 
    Rate Schedule under which Allegheny Power offers standard generation 
    and emergency service on an hourly, daily, weekly, monthly or yearly 
    basis. Allegheny Power requests a waiver of notice requirements to make 
    service available as of July 8, 1997, to NP Energy Inc., and Northeast 
    Utilities Company.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: August 12, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-20663 Filed 8-5-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/06/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-20663
Dates:
August 12, 1997, in accordance with Standard Paragraph E at the end of this notice.
Pages:
42246-42249 (4 pages)
Docket Numbers:
Docket No. ER97-3643-000, et al.
PDF File:
97-20663.pdf