97-20713. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 151 (Wednesday, August 6, 1997)]
    [Notices]
    [Page 42243]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-20713]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-661-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    July 31, 1997.
        Take notice that on July 24, 1997, Northwest Pipeline Corporation 
    (Northwest), P.O. Box 58900, Salt Lake City, Utah 84158-0900, filed in 
    Docket No. CP97-661-000 a request pursuant to Sections 157.205, 
    157.211, and 157.216 of the Commission's Regulations under the Natural 
    Gas Act (18 CFR 157.205, 157.211 and 157.216) for authorization to 
    construct and operate modified replacement facilities and abandon 
    certain obsolete facilities located in Yakima County, Washington, under 
    Northwest's certificate issued in Docket No. CP82-433-000, pursuant to 
    Section 7(c) of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        Northwest proposes to modify the Yakima Firing Center Meter 
    Station, located in Yakima County, Washington, by replacing the two 
    existing 1-inch regulators with two new 1-inch regulators, the existing 
    4-inch positive displacement meter with a new 3-inch turbine meter, the 
    existing 30,000 Btu per hour heater with a new 100,000 Dth per hour 
    heater, and the existing 2 x 3 relief valve with a new 2 x 3 full bore 
    relief valve and appurtenances. Northwest declares as a result of the 
    described modifications, the maximum design capacity of the meter 
    station will increase from approximately 483 Dth per day to 
    approximately 1,222 Dth per day at 150 psig, as limited by the 
    regulators. Northwest asserts the modifications will more efficiently 
    accommodate existing firm maximum daily delivery obligations at this 
    delivery point to Cascade Natural Gas Corporation.
        Northwest states that the total cost of the proposed facility 
    replacements at the Yakima Firing Center Meter Station is estimated to 
    be $101,375, comprised of $98,375 for installation of new facilities 
    and $3,000 for removal of old facilities.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-20713 Filed 8-5-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/06/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-20713
Pages:
42243-42243 (1 pages)
Docket Numbers:
Docket No. CP97-661-000
PDF File:
97-20713.pdf