98-20971. Notice of Availability of the Final Environmental Impact Statement for Pilot Testing of Neutralization/Biotreatment of Mustard Agent at Aberdeen Proving Ground, Maryland  

  • [Federal Register Volume 63, Number 151 (Thursday, August 6, 1998)]
    [Notices]
    [Pages 42011-42012]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-20971]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army
    
    
    Notice of Availability of the Final Environmental Impact 
    Statement for Pilot Testing of Neutralization/Biotreatment of Mustard 
    Agent at Aberdeen Proving Ground, Maryland
    
    AGENCY: Department of the Army, DoD.
    
    ACTION: Notice of Availability.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This announces the availability of the Final Environmental 
    Impact Statement (FEIS) which assesses the potential environmental 
    impacts of the design, construction, systemization and operation of a 
    facility to pilot test the neutralization/biotreatment process of 
    mustard agent using water at Aberdeen Proving Ground (APG), Maryland. 
    The proposed facility will be used to demonstrate, as part of a 
    research and development program, the feasibility of adopting the 
    neutralization process using water, followed by biotreatment, to 
    destroy mustard agent currently stored in ton containers at APG.
    
    DATES: Written comments received within 30 days of the publication of 
    the Environmental Protection Agency's Notice of Availability for this 
    action will be considered by the Army during final decision making.
    
    ADDRESSES: To obtain a copy of the FEIS, write to Ms. Nancy Hoffman, 
    Edgewood Community Outreach Office, Woodbridge Station, 1011 Woodbridge 
    Center Way, Edgewood, Maryland 21040.
    
    FOR FURTHER INFORMATION CONTACT: Ms. Catherine Herlinger, Office of the 
    Program Manager for Chemical Demilitarization, ATTN: SFAE-CD-P Building 
    E4585, Aberdeen Proving Ground, Maryland, 21010-5401;
    
    [[Page 42012]]
    
    telephone: (800) 488-0648 or (410) 463-2583; e-mail: 
    cherling@cdra.apgea.army.mil.
    
    SUPPLEMENTARY INFORMATION: The alternatives considered in this DEIS are 
    no action (i.e., continued storage of mustard agent at APG) and 
    locating the pilot facility at one of two potential sites within APG. 
    Although the no action alternative is not viable under Pub. L. 99-145, 
    the Department of Defense Authorization Act of 1986, it was analyzed to 
    provide a comparison with the proposed action. In addition, the no 
    action alternative is considered to be deferral of research and 
    development of the neutralization process as an alternative technology.
        The FEIS concludes that mustard agent stored in bulk containers can 
    be pilot tested at APG in a safe and environmental acceptable manner 
    using the water neutralization (hydrolis) process, followed by 
    biotreatment. At one time, the option of sending the hydrolysate to an 
    off-site biotreatment facility was considered by the Army. However, the 
    Army has been unable to identify a suitable off-site biotreatment 
    facility that would accept the neutralization hydrolysate and also 
    conform to the safety and environmental protection requirements of the 
    proposed action. Accordingly, off-site biotreatment is not addressed 
    further in this EIS.
        The Department of the Army prepared a Draft EIS (DEIS) which 
    assessed the potential site-specific health and environmental impacts 
    of the construction, systemization and operation of an on-site facility 
    to pilot test the neutralization/biotreatment process of mustard agent 
    using water at APG, Maryland. A Notice of Availability was published on 
    March 27, 1998 (63 FR 14922), which provided notice that the Draft EIS 
    was available for comment. Comments from the DEIS have been considered 
    and responses are included in this Final EIS. After a 30-day waiting 
    period the Army will publish a Record of Decision.
    
        Dated: July 29, 1998.
    Raymond J. Fatz,
    Deputy Assistant Secretary of the Army, (Environment, Safety and 
    Occupational Health) OASA (I,L&E).
    [FR Doc. 98-20971 Filed 8-5-98; 8:45 am]
    BILLING CODE 3710-08-M
    
    
    

Document Information

Published:
08/06/1998
Department:
Army Department
Entry Type:
Notice
Action:
Notice of Availability.
Document Number:
98-20971
Dates:
Written comments received within 30 days of the publication of the Environmental Protection Agency's Notice of Availability for this action will be considered by the Army during final decision making.
Pages:
42011-42012 (2 pages)
PDF File:
98-20971.pdf