[Federal Register Volume 63, Number 151 (Thursday, August 6, 1998)]
[Notices]
[Pages 42011-42012]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-20971]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Notice of Availability of the Final Environmental Impact
Statement for Pilot Testing of Neutralization/Biotreatment of Mustard
Agent at Aberdeen Proving Ground, Maryland
AGENCY: Department of the Army, DoD.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: This announces the availability of the Final Environmental
Impact Statement (FEIS) which assesses the potential environmental
impacts of the design, construction, systemization and operation of a
facility to pilot test the neutralization/biotreatment process of
mustard agent using water at Aberdeen Proving Ground (APG), Maryland.
The proposed facility will be used to demonstrate, as part of a
research and development program, the feasibility of adopting the
neutralization process using water, followed by biotreatment, to
destroy mustard agent currently stored in ton containers at APG.
DATES: Written comments received within 30 days of the publication of
the Environmental Protection Agency's Notice of Availability for this
action will be considered by the Army during final decision making.
ADDRESSES: To obtain a copy of the FEIS, write to Ms. Nancy Hoffman,
Edgewood Community Outreach Office, Woodbridge Station, 1011 Woodbridge
Center Way, Edgewood, Maryland 21040.
FOR FURTHER INFORMATION CONTACT: Ms. Catherine Herlinger, Office of the
Program Manager for Chemical Demilitarization, ATTN: SFAE-CD-P Building
E4585, Aberdeen Proving Ground, Maryland, 21010-5401;
[[Page 42012]]
telephone: (800) 488-0648 or (410) 463-2583; e-mail:
cherling@cdra.apgea.army.mil.
SUPPLEMENTARY INFORMATION: The alternatives considered in this DEIS are
no action (i.e., continued storage of mustard agent at APG) and
locating the pilot facility at one of two potential sites within APG.
Although the no action alternative is not viable under Pub. L. 99-145,
the Department of Defense Authorization Act of 1986, it was analyzed to
provide a comparison with the proposed action. In addition, the no
action alternative is considered to be deferral of research and
development of the neutralization process as an alternative technology.
The FEIS concludes that mustard agent stored in bulk containers can
be pilot tested at APG in a safe and environmental acceptable manner
using the water neutralization (hydrolis) process, followed by
biotreatment. At one time, the option of sending the hydrolysate to an
off-site biotreatment facility was considered by the Army. However, the
Army has been unable to identify a suitable off-site biotreatment
facility that would accept the neutralization hydrolysate and also
conform to the safety and environmental protection requirements of the
proposed action. Accordingly, off-site biotreatment is not addressed
further in this EIS.
The Department of the Army prepared a Draft EIS (DEIS) which
assessed the potential site-specific health and environmental impacts
of the construction, systemization and operation of an on-site facility
to pilot test the neutralization/biotreatment process of mustard agent
using water at APG, Maryland. A Notice of Availability was published on
March 27, 1998 (63 FR 14922), which provided notice that the Draft EIS
was available for comment. Comments from the DEIS have been considered
and responses are included in this Final EIS. After a 30-day waiting
period the Army will publish a Record of Decision.
Dated: July 29, 1998.
Raymond J. Fatz,
Deputy Assistant Secretary of the Army, (Environment, Safety and
Occupational Health) OASA (I,L&E).
[FR Doc. 98-20971 Filed 8-5-98; 8:45 am]
BILLING CODE 3710-08-M