97-20809. Viking Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 152 (Thursday, August 7, 1997)]
[Notices]
[Pages 42540-42541]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-20809]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-676-000]
Viking Gas Transmission Company; Notice of Request Under Blanket
Authorization
August 1, 1997.
Take notice that on July 30, 1997, Viking Gas Transmission Company
(Viking), 825 Rice Street, St. Paul, Minnesota 55117, filed a request
with the Commission in Docket No. CP97-676-000, pursuant to Sections
157.205 and 157.212 of the Commission's Regulations under the Natural
Gas Act (NGA) for authorization to add a new delivery point for
transportation services that Viking currently provides for Northern
States Power Company
[[Page 42541]]
(NSPM) authorized in blanket certificate issued in Docket No. CP82-414-
000, all as more fully set forth in the request on file with the
Commission and open to public inspection.
Viking proposes to establish an additional delivery point at
Viking's existing M.P. 2219 + 10.58 in Chisago County, Minnesota. The
facilities Viking proposes to install and own at the proposed delivery
point include a 12'' hot tap, a 2'' side valve, meter station piping,
measurement, valving, data acquisition and control equipment, an
appurtenant facilities including a small metering building. The
estimated cost of these facilities would be $207,900. NSPM has agreed
to reimburse Viking for the actual cost of these facilities.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) a motion
to intervene or notice of intervention and pursuant to Section 157.205
of the Regulations under the NGA (18 CFR 157.205) a protest to the
request. If no protest is filed within the allowed time, the proposed
activity shall be deemed to be authorized effective the day after the
time allowed for filing a protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-20809 Filed 8-6-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 08/07/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-20809
- Pages:
- 42540-42541 (2 pages)
- Docket Numbers:
- Docket No. CP97-676-000
- PDF File:
-
97-20809.pdf