-
Start Preamble
Docket Nos. Anemoi Energy Storage, LLC EG23–142–000 Ebony Energy Storage, LLC EG23–143–000 Clearwater Wind II, LLC EG23–144–000 Johnson County Power, LLC EG23–145–000 RW Miller Power, LLC EG23–146–000 Jack County Power, LLC EG23–147–000 Boomtown Solar Energy LLC EG23–148–000 Delta's Edge Lessee, LLC EG23–149–000 Solar Partners XI, LLC EG23–150–000 Horizon Solar, LLC EG23–151–000 Sun Pond, LLC EG23–152–000 Oak Lessee, LLC EG23–153–000 Fox Squirrel Solar LLC EG23–154–000 Huck Finn Solar, LLC EG23–155–000 Harvest Gold Solar Power, LLC EG23–156–000 SMT Alamo LLC EG23–157–000 SMT Santa Rosa LLC EG23–158–000 SMT Bay City LLC EG23–159–000 SMT Elsa LLC EG23–160–000 SMT Mercedes LLC EG23–161–000 SMT Mission LLC EG23–162–000 SMT Los Fresnos LLC EG23–163–000 SMT Rio Grande LLC EG23–164–000 SMT Rio Grande II LLC EG23–165–000 SMT Harlingen II LLC EG23–166–000 Appaloosa Solar I, LLC EG23–167–000 Pome BESS LLC EG23–168–000 Three Corners Solar, LLC EG23–169–000 Three Corners Prime Tenant, LLC EG23–170–000 BE-Pine 1 LLC EG23–171–000 Horus West Virginia I, LLC EG23–172–000 Horus Louisiana I, LLC EG23–173–000 Take notice that during the month of July 2023, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a) (2022).
Start SignatureDated: August 1, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–16786 Filed 8–4–23; 8:45 am]
BILLING CODE 6717–01–P
Document Information
- Published:
- 08/07/2023
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2023-16786
- Pages:
- 52148-52148 (1 pages)
- PDF File:
- 2023-16786.pdf