94-19325. Florida Gas Transmission Co.; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 59, Number 152 (Tuesday, August 9, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-19325]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 9, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP94-332-000]
    
     
    
    Florida Gas Transmission Co.; Notice of Proposed Changes in FERC 
    Gas Tariff
    
    August 3, 1994.
        Take notice that on July 29, 1994, Florida Gas Transmission Company 
    (FGT) tendered for filing to become part of its FERC Gas Tariff, Third 
    Revised Volume No. 1, the following tariff sheets, with an effective 
    date of September 1, 1994:
    
    First Revised Sheet No. 18
    Original Sheet No. 18A
    Second Revised Sheet No. 46A
    First Revised Sheet No. 47
    Original Sheet No. 47A
    Fourth Revised Sheet No. 207
    
        FGT states that it is filing the above referenced tariff sheets in 
    order to: (1) Clarify that the Fuel Reimbursement Charge retained by 
    FGT does not apply to volumes transported through non-contiguous 
    laterals without compression nor through laterals without compression 
    behind processing plants where volumes transported are consumed within 
    the plant; and (2) modify the Fuel Reimbursement Charge Adjustment 
    mechanism to permit FGT to discount the fuel charge for certain Western 
    Division transportation services.
        FGT states that it does not incur compressor fuel usage in certain 
    instances described in its filing. FGT states that it is filing to 
    clarify that the Fuel Reimbursement Charge is not applicable to the 
    these situations.
        FGT also states that it is proposing to change the Fuel 
    Reimbursement Charge mechanism to permit FGT to discount the Fuel 
    Reimbursement Charge for Western Division transportation service only, 
    but not below any incremental fuel usage incurred (which represents the 
    variable fuel cost of the transactions), without having such discounts 
    made at FGT's expense. FGT believes that this flexibility is necessary 
    if FGT is to generate additional throughput from its Western Division 
    facilities, to the benefit of the entire system while, at a minimum, 
    fully recovering all variable costs associated with transaction.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capital Street, NE., Washington, DC 
    20426, in accordance with Sections 385.214 and 385.211 of the 
    Commission's Rules and Regulations. All such motions or protests should 
    be filed on or before August 10, 1994. Protests will be considered by 
    the Commission in determining the appropriate actions to be taken, but 
    will not serve to make protestants parties to the proceedings. Any 
    person wishing to become a party must file a motion to intervene. 
    Copies of this filing are on file with the Commission and are available 
    for public inspections.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 94-19325 Filed 8-8-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/09/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-19325
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: August 9, 1994, Docket No. RP94-332-000