E6-12985. Drawbridge Operation Regulations; Long Island, New York Inland Waterway From East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Loop Parkway Bridge across Long Creek at mile 0.7, at Jones Beach, New York. Under this temporary deviation, the Loop Parkway Bridge need not open for the passage of vessel traffic from 8:30 a.m. through 11:30 a.m. and 1:30 p.m. through 4:30 p.m., daily, from September 6, 2006 through October 26, 2006. A single bridge opening for all inbound commercial fishing vessels shall be provided, if a request to open the bridge is given, during the 1:30 p.m. to 4:30 p.m. bridge closure period. This deviation is necessary to facilitate scheduled bridge maintenance.

    DATES:

    This deviation is effective from September 6, 2006 through October 26, 2006.

    ADDRESSES:

    Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, One South Street, New York, New York 10004, between 7 a.m. and 4 p.m., Monday through Friday, except Federal holidays. The telephone number is (212) 668-7165. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668-7195.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Loop Parkway Bridge, across Long Creek at mile 0.7, at Jones Beach, New York, has a vertical clearance in the closed position of 21 feet at mean high water and 25 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.799(f).

    The owner of the bridge, New York State Department of Transportation, requested a temporary deviation to facilitate bridge painting operations. The bridge will not be able to open while the bridge painting operation is underway.

    Under this temporary deviation, the Loop Parkway Bridge across Long Creek at mile 0.7, need not open for the passage of vessel traffic from 8:30 a.m. through 11:30 a.m. and from 1:30 p.m. through 4:30 p.m., daily, from September 6, 2006 through October 26, 2006. All inbound commercial fishing vessels shall be provided a single bridge opening during the 1:30 p.m. through 4:30 p.m. bridge closure period each day provided a bridge opening request is Start Printed Page 45387given by calling the number posted at the bridge.

    In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible.

    Should the bridge maintenance authorized by this temporary deviation be completed before the end of the effective period published in this notice, the Coast Guard will rescind the remainder of this temporary deviation, and the bridge shall be returned to its normal operating schedule. Notice of the above action shall be provided to the public in the Local Notice to Mariners and the Federal Register, where practicable.

    This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: July 26, 2006.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. E6-12985 Filed 8-8-06; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
9/6/2006
Published:
08/09/2006
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
E6-12985
Dates:
This deviation is effective from September 6, 2006 through October 26, 2006.
Pages:
45386-45387 (2 pages)
Docket Numbers:
CGD01-06-099
PDF File:
e6-12985.pdf
CFR: (1)
33 CFR 117