-
AGENCY:
Federal Aviation Administration (FAA), DOT.
ACTION:
Notice of proposed rulemaking (NPRM).
SUMMARY:
The FAA proposes to adopt a new airworthiness directive (AD) for all Bombardier, Inc., Model BD-100-1A10 airplanes. This proposed AD was prompted by a determination that new or more restrictive maintenance tasks are necessary. This proposed AD would require revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive maintenance tasks. The FAA is proposing this AD to address the unsafe condition on these products.
DATES:
The FAA must receive comments on this proposed AD by September 23, 2024.
ADDRESSES:
You may send comments, using the procedures found in 14 CFR 11.43 and 11.45, by any of the following methods:
- Federal eRulemaking Portal: Go to regulations.gov. Follow the instructions for submitting comments.
- Fax: 202-493-2251.
- Mail: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590.
- Hand Delivery: Deliver to Mail address above between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
AD Docket: You may examine the AD docket at regulations.gov under Docket No. FAA-2024-2007; or in person at Docket Operations between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this NPRM, the mandatory continuing airworthiness information (MCAI), any comments received, and other information. The street address for Docket Operations is listed above.
Material Incorporated by Reference:
- For Bombardier, Inc. material identified in this proposed AD, contact Bombardier Business Aircraft Customer Response Center, 400 Côte Vertu Road West, Dorval, Québec H4S 1Y9, Canada; telephone 514-855-2999; emailac.yul@aero.bombardier.com; website bombardier.com.
- You may view this material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th Street, Des Moines, WA. For information on the availability of this material at the FAA, call 206-231-3195.
FOR FURTHER INFORMATION CONTACT:
Steven Dzierzynski, Aviation Safety Engineer, FAA, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone: 516-228-7300; email: 9-avs-nyaco-cos@faa.gov.
SUPPLEMENTARY INFORMATION:
Comments Invited
The FAA invites you to send any written relevant data, views, or arguments about this proposal. Send your comments to an address listed under ADDRESSES . Include “Docket No. FAA-2024-2007; Project Identifier MCAI-2023-01270-T” at the beginning of your comments. The most helpful comments reference a specific portion of the proposal, explain the reason for any recommended change, and include supporting data. The FAA will consider all comments received by the closing date and may amend the proposal because of those comments.
Except for Confidential Business Information (CBI) as described in the following paragraph, and other information as described in 14 CFR 11.35, the FAA will post all comments received, without change, to regulations.gov, including any personal information you provide. The agency will also post a report summarizing each substantive verbal contact received about this NPRM.
Confidential Business Information
CBI is commercial or financial information that is both customarily and actually treated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. If your comments responsive to this NPRM contain commercial or financial information that is customarily treated as private, that you actually treat as private, and that is relevant or responsive to this NPRM, it is important that you clearly designate the submitted comments as CBI. Please mark each page of your submission containing CBI as “PROPIN.” The FAA will treat such marked submissions as confidential under the FOIA, and they will not be placed in the public docket of this NPRM. Submissions containing CBI should be sent to Steven Dzierzynski, Aviation Safety Engineer, FAA, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone: 516-228-7300; email: 9-avs-nyaco-cos@faa.gov. Any commentary that the FAA receives which is not specifically designated as CBI will be placed in the public docket for this rulemaking.
Background
Transport Canada, which is the aviation authority for Canada, has issued Transport Canada AD CF-2023-78, dated December 19, 2023 (Transport Canada AD CF-2023-78) (also referred to as the MCAI), to correct an unsafe condition for all Bombardier, Inc., Model BD-100-1A10 airplanes. The MCAI states that airplanes could experience misleading electrical system status indications (push button annunciators (PBA) and engine indicating and crew alerting system (EICAS)) as a result of contamination of electrical contacts in the left-hand (LH) direct current power center (DCPC) internal communication data bus. The MCAI states that new or more restrictive maintenance tasks have been developed to rectify lower time LH DCPC units not addressed by previously issued AD's.
The FAA is proposing this AD to address erratic indications, which could cause the flightcrew to turn off fully operational electrical power sources, leading to partial or complete loss of electrical power. The unsafe condition, if not addressed, could result in loss of flight displays and reduced controllability of the airplane. You may examine the MCAI in the AD docket at regulations.gov under Docket No. FAA-2024-2007.
Material Incorporated by Reference Under 1 CFR Part 51
The FAA reviewed the following documents:
- Task 24-61-01-101, “Restoration of the left DC Power Center (DCPC) (Pre SB100-24-30),” Section 5-10-20, “Time Limits—Supplementary Limitations,” of Part 2, “Airworthiness Limitations”, of the Bombardier Challenger 300 BD-100 Time Limits/Maintenance Checks, Revision 24, dated August 9, 2023.
- Task 24-61-01-101, “Restoration of the Left DC Power Center (DCPC) (Pre SB350-24-005),” Section 5-10-20, “Time Limits—Supplementary Limitations,” of Part 2, “Airworthiness Limitations,” of the Bombardier Challenger 350 BD-100 Time Limits/Maintenance Checks, Revision 14, dated August 9, 2023.
This material specifies new or more restrictive airworthiness limitations for safe life limits.
This material is reasonably available because the interested parties have access to it through their normal course of business or by the means identified in ADDRESSES section.
FAA's Determination
This product has been approved by the aviation authority of another country and is approved for operation in the United States. Pursuant to the FAA's bilateral agreement with this State of Design Authority, the FAA has been notified of the unsafe condition described in the MCAI and material referenced above. The FAA is issuing this NPRM after determining that the unsafe condition described previously is likely to exist or develop on other products of the same type design.
Proposed Requirements of This NPRM
This proposed AD would require revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive maintenance tasks.
This proposed AD would require revisions to certain operator maintenance documents to include new actions ( e.g., inspections). Compliance with these actions is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by this proposed AD, the operator may not be able to accomplish the actions described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (i)(1) of this proposed AD.
Costs of Compliance
The FAA estimates that this AD, if adopted as proposed, would affect 356 airplanes of U.S. registry. The FAA estimates the following costs to comply with this proposed AD:
The FAA has determined that revising the maintenance or inspection program takes an average of 90 work-hours per operator, although the agency recognizes that this number may vary from operator to operator. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. Therefore, the agency estimates the average total cost per operator to be $7,650 (90 work-hours x $85 per work-hour).
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: General requirements. Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.
Regulatory Findings
The FAA determined that this proposed AD would not have federalism implications under Executive Order 13132. This proposed AD would not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this proposed regulation:
(1) Is not a “significant regulatory action” under Executive Order 12866,
(2) Would not affect intrastate aviation in Alaska, and
(3) Would not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
- Air transportation
- Aircraft
- Aviation safety
- Incorporation by reference
- Safety
The Proposed Amendment
Accordingly, under the authority delegated to me by the Administrator, the FAA proposes to amend 14 CFR part 39 as follows:
PART 39—AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
[Amended]2. The FAA amends § 39.13 by adding the following new airworthiness directive:
Bombardier, Inc.: Docket No. FAA-2024-2007; Project Identifier MCAI-2023-01270-T.
(a) Comments Due Date
The FAA must receive comments on this airworthiness directive (AD) by September 23, 2024.
(b) Affected ADs
None.
(c) Applicability
This AD applies to all Bombardier, Inc., Model BD-100-1A10 airplanes, certificated in any category.
(d) Subject
Air Transport Association (ATA) of America Code 24, Electrical Power.
(e) Unsafe Condition
This AD was prompted by a determination that new or more restrictive maintenance tasks are necessary. The FAA is issuing this AD to address to address erratic indications, which could cause the flightcrew to turn off fully operational electrical power sources, leading to partial or complete loss of electrical power. The unsafe condition, if not addressed, could result in loss of flight displays and reduced controllability of the airplane.
(f) Compliance
Comply with this AD within the compliance times specified, unless already done.
(g) Maintenance or Inspection Program Revision
Within 60 days after the effective date of this AD, revise the existing maintenance or inspection program, as applicable, to incorporate the information specified in the tasks specified in figure 1 to paragraph (g) of this AD, of Part 2, “Airworthiness Limitations,” of the applicable Time Limits/Maintenance Checks (TLMC) manual. The initial compliance time for doing the tasks is at the interval specified in the applicable TLMC manual specified in figure 1 to paragraph (g) of this AD, or within 60 days after the effective date of this AD, whichever occurs later.
Figure 1 to paragraph (g)—Time Limits—Supplementary Limitations Tasks
Note 1 to paragraph (g): The asterisk (or “one star”) with the last three digits of the task numbers listed in figure 1 to paragraph (g) of this AD indicates that the task is an airworthiness limitation task.
(h) No Alternative Actions, Intervals
After the existing maintenance or inspection program has been revised as required by paragraph (g) of this AD, no alternative actions ( e.g., inspections) or intervals may be used unless the actions and intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (i)(1) of this AD.
(i) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, International Validation Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or responsible Flight Standards Office, as appropriate. If sending information directly to the manager of the International Validation Branch, mail it to the address identified in paragraph (j) of this AD. Information may be emailed to: 9-AVS-NYACO-COS@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the responsible Flight Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, International Validation Branch, FAA; or Transport Canada; or Bombardier, Inc.'s Transport Canada Design Approval Organization (DAO). If approved by the DAO, the approval must include the DAO-authorized signature.
(j) Additional Information
For more information about this AD, contact Steven Dzierzynski, Aviation Safety Engineer, FAA, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone: 516-228-7300; email: 9-avs-nyaco-cos@faa.gov.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the material listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this material as applicable to do the actions required by this AD, unless this AD specifies otherwise.
(i) Task 24-61-01-101, “Restoration of the left DC Power Center (DCPC) (Pre SB100-24-30),” Section 5-10-20, “Time Limits—Supplementary Limitations,” of Part 2, “Airworthiness Limitations”, of the Bombardier Challenger 300 BD-100 Time Limits/Maintenance Checks, Revision 24, dated August 9, 2023.
(ii) Task 24-61-01-101, “Restoration of the Left DC Power Center (DCPC) (Pre SB350-24-005),” Section 5-10-20, “Time Limits—Supplementary Limitations,” of Part 2, “Airworthiness Limitations,” of the Bombardier Challenger 350 BD-100 Time Limits/Maintenance Checks, Revision 14, dated August 9, 2023.
(3) For Bombardier Inc. material identified in this AD, contact Bombardier Business Aircraft Customer Response Center, 400 Côte Vertu Road West, Dorval, Québec H4S 1Y9, Canada; telephone 514 855-2999; email ac.yul@aero.bombardier.com; website bombardier.com.
(4) You may view this material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th Street, Des Moines, WA. For information on the availability of this material at the FAA, call 206-231-3195.
(5) You may view this material at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov.
Issued on July 31, 2024.
Victor Wicklund,
Deputy Director, Compliance & Airworthiness Division, Aircraft Certification Service.
[FR Doc. 2024-17362 Filed 8-8-24; 8:45 am]
BILLING CODE 4910-13-P
Document Information
- Published:
- 08/09/2024
- Department:
- Federal Aviation Administration
- Entry Type:
- Proposed Rule
- Action:
- Notice of proposed rulemaking (NPRM).
- Document Number:
- 2024-17362
- Dates:
- The FAA must receive comments on this proposed AD by September 23, 2024.
- Pages:
- 65267-65270 (4 pages)
- Docket Numbers:
- Docket No. FAA-2024-2007, Project Identifier MCAI-2023-01270-T
- RINs:
- 2120-AA64: Airworthiness Directives
- RIN Links:
- https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
- Topics:
- Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
- PDF File:
- 2024-17362.pdf
- CFR: (1)
- 14 CFR 39