94-21550. ANR Pipeline Company, et al.; Natural Gas Certificate Filings  

  • [Federal Register Volume 59, Number 169 (Thursday, September 1, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-21550]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 1, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP94-713-000., et al.]
    
     
    
    ANR Pipeline Company, et al.; Natural Gas Certificate Filings
    
    August 24, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. ANR Pipeline Company
    
    [Docket No. CP94-713-000]
    
        Take notice that on August 12, 1994, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP94-713-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.211) for authorization to construct and operate an interconnection 
    between ANR and Wisconsin Public Service Corporation (Public Service) 
    for delivery of natural gas to Public Service in Portage County, 
    Wisconsin, under ANR's blanket certificate issued in Docket No. CP82-
    480-000 pursuant to Section 7 of the Natural Gas Act, all as more fully 
    set forth in the request that is on file with the Commission and open 
    to public inspection.
        ANR states that the proposed interconnection, known as the Rosholt 
    Interconnection, will consist of 2 and 4-inch turbine meters located 
    within the existing right-of-way of the intersection of ANR's 
    Marshfield Main line and South Stevens Point Lateral line in Portage 
    County, Wisconsin, at an approximate cost of $121,000. This proposed 
    interconnection will allow Public Service to provide new gas service to 
    the Village of Rosholt, Wisconsin.
        ANR proposes to provide Public Service with deliveries at the 
    proposed interconnection through a combination of services under Rate 
    Schedule ETS (Enhanced Transportation Service), Rate Schedule FSS (Firm 
    Storage Service), and Rate Schedule NNS (No Notice Service) of ANR's 
    FERC Gas Tariff, Second Revised Volume No. 1. The maximum daily 
    quantity of gas delivered under the proposed services is approximately 
    1,240 Mcf/d. ANR holds a Part 284 blanket transportation certificate in 
    Docket No. CP88-532 and the volumes to be delivered will be within the 
    certificated entitlements of the customer. ANR states that the 
    construction of the Rosholt Interconnection will have no adverse impact 
    on peak day or annual entitlements for any existing customers.
        Comment date: October 11, 1994, in accordance with Standard 
    Paragraph G at the end of this notice.
    
    2. East Tennessee Natural Gas Company
    
    [Docket No. CP94-723-000]
    
        Take notice that on August 18, 1994, East Tennessee Natural Gas 
    Company (East Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in 
    Docket No. CP94-723-000 a request pursuant to Sections 157.205 and 
    157.212 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205, 157.212) for authorization to modify an existing receipt 
    meter for use as a delivery point located in Morgan County, Tennessee 
    under East Tennessee's blanket certificate issued in Docket No. CP82-
    412-000 pursuant to Section 7 of the Natural Gas Act, all as more fully 
    set forth in the request that is on file with the Commission and open 
    to public inspection.
        East Tennessee proposes to reverse an existing meter tube and check 
    valve that is currently designed for use as a receipt point so the 
    point can be used as a delivery point. East Tennessee states that this 
    has been requested by its customer GASCO Distribution System of 
    Kentucky, Inc. (GASCO) and that it does not propose to increase or 
    decrease the total daily and/or annual quantities it is authorized to 
    deliver to GASCO.
        Comment date: October 11, 1994, in accordance with Standard 
    Paragraph G at the end of this notice.
    
    3. Florida Gas Transmission Company
    
    [Docket No. CP94-727-000]
    
        Take notice that on August 19, 1994, Florida Gas Transmission 
    Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
    1188, filed in Docket No. CP94-727-000 a request pursuant to Sections 
    157.205 and 157.212 of the Commission's Regulations under the Natural 
    Gas Act (18 CFR 157.205, 157.212) for authorization to upgrade an 
    existing meter station which serves as a delivery point located in Polk 
    County, Florida under FGT's blanket certificate issued in Docket No. 
    CP82-553-000 pursuant to Section 7 of the Natural Gas Act, all as more 
    fully set forth in the request that is on file with the Commission and 
    open to public inspection.
        FGT proposes to upgrade the Lake Wales Meter Station that is used 
    to measure gas delivered to Chesapeake Utilities Corporation by 
    replacing the regulators, the orifice meter, associated headers, and 
    related ancillary equipment with a single 4-inch turbine meter and 
    related appurtenant facilities. FGT states that the proposed upgrade 
    would not impact FGT's peak day or annual deliveries.
        Comment date: October 11, 1994, in accordance with Standard 
    Paragraph G at the end of this notice.
    
    Standard Paragraphs
    
        G. Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-21550 Filed 8-31-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
09/01/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-21550
Dates:
October 11, 1994, in accordance with Standard Paragraph G at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers: