    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared August 14, 1995 Through 
    August 18, 1995 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 14, 1995 (60 
    FR 19047).
    
    Draft EISs
    
        ERP No. D-AFS-L65237-ID Rating EU2, Thunderbolt Wildfire Recovery 
    Project, Implementation, Boise and Payette National Forests, Valley 
    County, ID.
    
    Summary
    
        EPA found the proposed salvage project to be environmentally 
    unsatisfactory. EPA's primary concerns include impaired water quality, 
    significantly increased sediment loading, degradation to salmon 
    spawning and rearing habitat, and major deviation from the forest plan.
        ERP No. D-COE-J35010-UT Rating EC2, Kennecott Tailings 
    Modernization Project, Tailings Impoundment Expansion, COE Section 404 
    Permit Issuance, Salt Lake County, UT.
    
    Summary
    
        EPA expressed environmental concerns regarding water quality 
    impacts and requested information that will assist in expediting a 
    CERCLA decision.
        ERP No. D-FAA-C51018-NY Rating EC2, Syracuse Hancock International 
    Airport, Land Acquisition and Construction of Runway 10 L-28R, Funding 
    and Airport Layout Plan Approval, Onondaga County, NY.
    
    Summary
    
        EPA expressed environmental concerns about the need for the 
    proposed project, as well as the proposed project's potential impacts 
    to wetlands, surface water quality, and noise. Accordingly, additional 
    information should be provided in the final EIS to address these 
    issues.
        ERP No. D-FAA-L51016-WA Rating EO2, Seattle - Tacoma (Sea-Tac) 
    International Airport Master Plan Update for Development Actions, 
    Funding, Airport Layout Plan Approval and COE Section 404 Permit, King 
    County, WA.
    
    Summary
    
        EPA expressed environmental objections with a number of concerns 
    regarding the purpose and need for the project and air quality 
    analysis.
        ERP No. D-FHW-C40135-NY Rating EC2, I-287 Cross Westchester 
    Expressway (CWE) Transportation Improvements, New York State Thruway 
    Route 303 to Route 120, Funding, Right-of Way Acquisition, COE Section 
    10 and 404 Permits, Rockland and Westchester Counties, NY.
    
    Summary
    
        EPA expressed environmental concerns about the proposed project's 
    potential impacts to wetlands and surface water quality. Additionally, 
    EPA requested information addressing potential cumulative impacts, and 
    supplemental information regarding the air quality analysis performed 
    for the proposed project.
        ERP No. D-FHW-L40196-WA Rating EC2, WA-20 Transportation 
    Improvements between Fredonia (WA-536) and Burlington (Interstate 5), 
    Funding, Right-of-Way Acquisition and COE Section 404 Permit, Skagit 
    County, WA.
    
    Summary
    
        EPA expressed environmental concerns based on the predicted noise 
    and wetland effects. Additional information is needed on mitigation for 
    both.
        ERP No. D-GSA-K80037-CA Rating EC2, San Diego-United States 
    Courthouse, Site Selection and Construction within a portion of the 
    Central Business District (CBD), City of San Diego, San Diego County, 
    CA.
    Summary
    
        EPA expressed environmental concerns regarding the project's air 
    conformity determination, the absence of solid waste recycling 
    features, and a need to more fully document the project's consistency 
    with GSA's environmental justice strategy.
    
    Final EISs
    
        ERP No. F-AFS-K65153-00 Klamath National Forest Land and Resource 
    Management Plan, Implementation, Siskiyou Co., CA and Jackson Co., OR.
    
    Summary
    
        Review of the Final EIS was not deemed necessary. No formal comment 
    letter was sent to the preparing agency.
        ERP No. F-BLM-L65225-OR Upper Klamath Basin Resource Management 
    Plan, Implementation, Klamath Falls Resource Area, Lakeview District, 
    Klamath County, OR.
    
    Summary
    
        Review of the Final EIS has been completed and the project found to 
    be environmentally satisfactory.
        ERP No. F-COE-K32047-CA Humboldt Harbor and Bay (Deepening) 
    Channels, Feasibility Study for Navigation Improvements, Humboldt 
    County, CA. 
    
    [[Page 45717]]
    
    
    Summary
    
        Review of the Final EIS was not deemed necessary. No formal comment 
    letter was sent to the preparing agency.
        ERP No. F-COE-L36102-OR Willamette River Temperature Control Study, 
    Selective Withdrawal Structure(s) (SWS) Construction, McKenzie River 
    Subbasin, OR.
    
    Summary
    
        EPA reiterates its concerns regarding the impact to water quality, 
    and fish habitat and spawning success during the construction phases. 
    EPA supports the proposal to develop a construction monitoring and 
    evaluation plan.
        ERP No. F-FRC-D29000-VA Gaston and Roanoke Rapids Project (FERC-No. 
    2009 003), Nonpoint Use of Project Lands and Water for the City of 
    Virginia Beach Water Supply Project, License Issuance, Brunswick 
    County, VA.
    
    Summary
    
        EPA expressed environmental concern regarding implementation of a 
    reuse wastewater system and not incorporating the result of a basin-
    wide reservoir operations modeling analysis.
        ERP No. F-NAS-A12040-00 Cassini Spacecraft Exploration Mission to 
    Explore the Planet Saturn, Implementation.
    
    Summary
    
        The final EIS addresses EPA's concerns raised in the draft EIS.
        ERP No. FS-TVA-E06016-TN Adoption--Watts Bar Nuclear Plant, Unit 1 
    Operations, Operating License Issuance, Rhea County, TN.
    
    Summary
    
        EPA had environmental concerns that this document did not 
    adequately address two issues raised at the draft EIS stage: need for 
    power and pollution prevention, and recommended that future NEPA 
    documents be more inclusive of these issues.
    
        Dated: August 28, 1995.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division Office of Federal 
    Activities.
    [FR Doc. 95-21805 Filed 8-31-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
09/01/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-21805
Pages:
45716-45717 (2 pages)
Docket Numbers:
ER-FRL-5228-4
PDF File:
95-21805.pdf