97-23909. Tennessee Gas Pipeline Company; Notice of Application  

  • [Federal Register Volume 62, Number 175 (Wednesday, September 10, 1997)]
    [Notices]
    [Pages 47659-47660]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-23909]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-716-000]
    
    
    Tennessee Gas Pipeline Company; Notice of Application
    
    September 4, 1997.
        Take notice that on August 27, 1997, Tennessee Gas Pipeline Company 
    (Tennessee), P.O. Box 2511, Houston, Texas 77252, filed an abbreviated 
    application in Docket No. CP97-716-000 pursuant to Section 7(b) of the 
    Natural Gas Act, requesting authorization to remove and replace minor 
    interconnect and header facilities in connection with Tennessee's 
    proposed modification of its Lobelville Meter Station located in 
    Lobelville, Perry County, Tennessee. Specifically, Tennessee seeks 
    authorization to remove and replace (1) approximately 40 feet of 8-inch 
    diameter pipe located between Valve 79B-101.1 and upstream meter 
    header; and (2) two 12-inch measurement headers.
    
    [[Page 47660]]
    
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before September 25, 1997, 
    file with the Federal Energy Regulatory Commission, 888 First Street, 
    N.E., Washington, D.C. 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.214 and 385.211 and the Regulations under the 
    Natural Gas Act (18 CFR 157.10. All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make the protestants parties to the 
    proceeding. Any person wishing to become a party to a proceeding or to 
    participate as a party in any hearing therein must file a motion to 
    intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate is required by the public 
    convenience and necessity. If a motion for leave to intervene is timely 
    filed, or if the Commission on its motion believes that a formal 
    hearing is required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Tennessee to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-23909 Filed 9-9-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/10/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-23909
Pages:
47659-47660 (2 pages)
Docket Numbers:
Docket No. CP97-716-000
PDF File:
97-23909.pdf