99-23522. Athens Generating Company, L.P., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 64, Number 175 (Friday, September 10, 1999)]
    [Notices]
    [Pages 49177-49180]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-23522]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG99-219-000, et al.]
    
    
    Athens Generating Company, L.P., et al.; Electric Rate and 
    Corporate Regulation Filings
    
    September 2, 1999.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Athens Generating Company, L.P.
    
    [Docket No. EG99-219-000]
    
        Take notice that on August 27, 1999, Athens Generating Company, 
    L.P. (Athens), a limited partnership with its principal place of 
    business at 7500 Old Georgetown Road, Bethesda, MD 20814, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's regulations.
        Athens proposes to construct, own or lease and operate a nominally 
    rated 1080 MW natural gas-fired, combined cycle power plant in the Town 
    of Athens, Greene County, New York. The proposed power plant is 
    expected to commence commercial operation in the first quarter of 2002. 
    All output from the plant will be sold by Athens exclusively at 
    wholesale.
        Comment date: September 23, 1999, in accordance with Standard 
    Paragraph
    
    [[Page 49178]]
    
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Lake Road Generating Company, L.P.
    
    [Docket No. EG99-220-000]
    
        Take notice that on August 30, 1999, Lake Road Generating Company, 
    L.P. (Lake Road), a Delaware limited partnership with its principal 
    place of business at 7500 Old Georgetown Road, Bethesda, MD 20814, 
    filed with the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's regulations.
        Lake Road was previously determined to be an EWG in Lake Road 
    Generating Company, L.P., 86 FERC para. 62,178 (Letter Order issued 
    March 5, 1999). That order was issued based upon Lake Road's plan, at 
    the time, to construct, own and operate a nominally rated 792 MW 
    natural gas-fired combined cycle power plant in the Town of Killingly, 
    Connecticut (the Facility). It is now planned that the Facility will be 
    owned by an unaffiliated entity, the Lake Road Trust Ltd. (the Trust). 
    Lake Road will lease the Facility from the Trust, and will operate the 
    Facility and sell all capacity and energy from it exclusively at 
    wholesale. The Facility is expected to commence commercial operation in 
    the year 2001.
        Comment date: September 23, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. Lake Road Trust Ltd.
    
    [Docket No. EG99-221-000]
    
        Take notice that on August 31, 1999, Lake Road Trust Ltd., a 
    Delaware business trust with its principal place of business at 1100 
    North Market Street, Wilmington, Delaware, filed with the Federal 
    Energy Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations.
        Lake Road Trust Ltd. proposes to own a nominally rated 792 MW 
    natural gas-fired combined cycle power plant in the Town of Killingly, 
    Connecticut. Lake Road Trust Ltd. will lease the facility to Lake Road 
    Generating Company, L.P. (LRGC). The proposed power plant is expected 
    to commence commercial operation in the year 2001. All capacity and 
    energy from the plant will be sold exclusively at wholesale by LRGC.
        Comment date: September 23, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. Alliance Strategies
    
    [Docket No. ER95-1381-013]
    
        Take notice that on August 30, 1999, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only.
    
    5. Montana Power Company
    
    [Docket No. ER98-2382-003]
    
        Take notice that on August 16, 1999, Montana Power Company tendered 
    for filing a compliance refund report in accordance with the 
    Commission's letter order in Docket No. ER98-2382-003 issued July 2, 
    1999.
        Comment date: September 22, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. SkyGen Energy Marketing LLC
    
    [Docket No. ER99-972-002]
    
        Take notice that on August 26, 1999, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only.
    
    7. CLECO Marketing & Trading LLC
    
    [Docket No. ER99-2300-001]
    
        Take notice that on September 1, 1999, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only.
    
    8. Bangor Hydro-Electric Company
    
    [Docket No. ER99-4248-000]
    
        Take notice that on August 26, 1999, Bangor Hydro-Electric Company 
    filed an executed service agreement for non-firm point-to-point 
    transmission service with Entergy Power Marketing Corp.
        Bangor Hydro requests waiver of the Commission's 60-day notice 
    requirements so that the agreement can become effective on August 23, 
    1999.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Bangor Hydro-Electric Company
    
    [Docket No. ER99-4249-000]
    
        Take notice that on August 26, 1999, Bangor Hydro-Electric Company 
    filed an executed service agreement for firm point-to-point 
    transmission service with Entergy Power Marketing Corp.
        Bangor Hydro requests that the agreement become effective on August 
    23, 1999.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER99-4250-000]
    
        Take notice that on August 26, 1999 Consolidated Edison Company of 
    New York, Inc. (Con Edison) tendered for filing a service agreement to 
    provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to American Electric Power Service Corporation 
    (AEP).
        Con Edison states that a copy of this filing has been served by 
    mail upon AEP.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER99-4251-000]
    
        Take notice that on August 26, 1999, Consolidated Edison Company of 
    New York, Inc. (Con Edison) tendered for filing a service agreement to 
    provide firm transmission service pursuant to its Open Access 
    Transmission Tariff to Con Edison Solutions (CES).
        Con Edison states that a copy of this filing has been served by 
    mail upon CES.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Entergy Services, Inc.
    
    [Docket No. ER99-2910-002 and EL98-74-000]
    
        Take notice that on August 30, 1999, Entergy Services, Inc., on 
    behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy 
    Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, 
    Inc., (collectively, the Entergy Operating Companies) tendered for 
    filing a compliance refund report in accordance with the Commission's 
    letter order in Docket Nos. ER98-2910-000 and EL98-74-000.
        Comment date: September 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER99-4252-000]
    
        Take notice that on August 26, 1999 Consolidated Edison Company of 
    New York, Inc. (Con Edison) tendered for filing a service agreement to 
    provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to Sithe Energies, Inc. (Sithe).
        Con Edison states that a copy of this filing has been served by 
    mail upon Sithe.
    
    [[Page 49179]]
    
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Tucson Electric Power Company
    
    [Docket No. ER99-4253-000]
    
        Take notice that on August 26, 1999, Tucson Electric Power Company 
    (Tucson), tendered for filing an Amendment No. 1 to the Service 
    Agreement between Tucson and Farmington Electric Utility System for 
    power sales under Tucson's Coordination Tariff, FERC Electric Tariff 
    Original Volume No. 1.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Consumers Energy Company
    
    [Docket No. ER99-4254-000]
    
        Take notice that on August 26, Consumers Energy Company (Consumers) 
    tendered for filing executed service agreements for unbundled wholesale 
    power service with Constellation Power Source, Inc. pursuant to 
    Consumers' Market Based Power Sales Tariff accepted for filing in 
    Docket No. ER98-4421-000 and Consumers cost based Power Sales Tariff 
    accepted for filing in Docket No. ER97-964-000.
        The Service agreements have an effective date of July 27, 1999.
        Copies of the filing have been served on the Michigan Public 
    Service Commission and Constellation Power Source, Inc.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. PECO Energy Company
    
    [Docket No. ER99-4255-000]
    
        Take notice that on August 26, 1999, PECO Energy Company (PECO) 
    filed under Section 205 of the Federal Power Act, 16 U.S.C. S 792 et 
    seq., a Transaction Letter dated August 25, 1999 with Horizon Energy 
    Company d/b/a Exelon Energy (EXELON) under PECO's FERC Electric Tariff 
    Original Volume No. 1 (Tariff).
        PECO requests an effective date of September 1, 1999, for the 
    Transaction Letter.
        PECO states that copies of this filing have been supplied to EXELON 
    and to the Pennsylvania Public Utility Commission.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Cinergy Services, Inc.
    
    [Docket No. ER99-4256-000]
    
        Take notice that on August 26, 1999, Cinergy Services, Inc. 
    (Services) tendered for filing on behalf of its operating companies, 
    PSI Energy, Inc. (PSI) a Second Amendment Agreement, dated August 1, 
    1999, to the Power Coordination Agreement, as amended, dated March 1, 
    1996, between Wabash Valley Power Association (Wabash Valley), PSI and 
    Services.
        PSI and Wabash Valley have agreed to replace Service Schedule D--
    Peaking Capacity and Energy.
        Copies of the filing were served on Wabash Valley Power 
    Association, Inc. and the Indiana Utility Regulatory Commission.
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Montaup Electric Company
    
    [Docket No. ER99-4257-000]
    
        Take notice that on August 26, 1999 Montaup Electric Company 
    (Montaup) tendered for filing a notice of cancellation of its System 
    Sale and Exchange Tariff, FERC Electric Tariff, Original Volume No. IV, 
    together with a notice of termination of associated service agreements, 
    to be made effective as of October 31, 1999. Montaup states that 
    notwithstanding such cancellation and termination, it will not 
    terminate, prior to its term, any transaction in effect on October 
    31st. In such cases, the tariff and service agreement will remain in 
    effect until the transaction terminates at the conclusion of such term.
        Notice of the cancellation and termination have been served upon 
    the following:
    
    Aquila Energy Marketing Corporation, ER98-0569-000
    Baltimore Gas & Electric Co., ER97-0800-000
    Bangor Hydro-Electric Company, ER96-1306-000
    Boston Edison Company, ER97-2662-000
    Braintree Electric Light Department, ER96-0437-000
    Catex Vitol Electric, L.L.C., ER95-1165-000
    Central Maine Power Company, ER95-1527-000
    Cinergy Capital & Trading, Inc., ER98-3350-000
    Cinergy Services, Inc., ER97-2662-000
    Citizens Power LLC, ER95-1165-000
    City of Burlington Electric Department, ER95-1165-000
    CMEX Energy, Inc., ER95-1527-000
    CNG Energy Services Corporation, ER96-0437-000
    Coastal Electric Services Company, ER96-0104-000
    Commonweathl Electric Company, ER95-1165-000
    Constellation Power Source, Inc., ER98-0569-000
    Coral Power, L.L.C., ER97-0800-000
    CPS Capital, Ltd., ER97-4623-000
    CT Municipal Electric Energy Cooperative, ER95-1165-000
    Duke Solutions, Inc., ER96-2817-000
    Duke Louis Dreyfus LLC, ER98-0569-000
    Eastern Power Distribution, Inc., ER97-0800-000
    Edison Source, ER97-4623-000
    Electric Clearinghouse, Inc., ER96-0104-000
    Enron Power Marketing Inc., ER95-1165-000
    Equitable Power Services Company, ER97-0800-000
    Federal Energy Sales, Inc., ER97-0800-000
    Fitchburg Gas and Electric Light Company, ER98-1782-000
    FPL Energy Power Marketing, Inc., ER99-0633-000
    Green Mountain Power Corporation, ER96-2306-000
    Griffin Energy Marketing, L.L.C., ER99-0633-000
    Intercoast Power Marketing Company, ER95-1165-000
    KCS Power Marketing, Inc., ER96-0104-000
    Koch Energy Trading, Inc., ER96-0437-000
    LG&E Energy Marketing, Inc., ER96-2306-000
    Long Island Lighting Co., ER95-1165-000
    Louis Dreygus Electric Power, Inc., ER95-1165-000
    Maine Public Service Company, ER95-1165-000
    Mass Municipal Wholesale Electric Company, ER96-1306-000
    Middleborough Gas and Electric Department, ER96-0437-000
    Morgan Stanley Capital Group, Inc., ER97-2662-000
    New Energy Ventures, Inc., ER97-4623-000
    New England Power Company ER97-1306-000
    New York State Electric & Gas Corporation, ER96-1306-000
    Niagra Mohawk Energy, ER97-2662-000
    Niagra Mohawk Power Corporation, ER95-1165-000
    North American Energy Conservation Inc., ER96-0104-000
    Northeast Energy Services, Inc., ER97-4623-000
    Northeast Utilities Service Company, ER96-2306-000
    NP Energy Inc., ER98-1782-000
    NRG Power Marketing Inc., ER99-0633-000
    PacificCorp Power Marketing, Inc., ER98-1782-000
    PanEnergy Trading and Market Services, L.L.C., ER97-0800-000
    Peco Energy Company, ER96-0104-000
    PG&E Energy Trading, Power, L.P., ER96-2306-000
    Phibro, Inc., ER96-0104-000
    Rainbow Energy Marketing Corp., ER95-1165-000
    Scana Energy Marketing L.P., ER98-3350-000
    Sonat Power Marketing L.P., ER97-4623-000
    Southern Company Energy Marketing L.P., ER97-0800-000
    Taunton Municipal Lighting Plant, ER95-1165-000
    The Power Company of America, L.P., ER97-2662-000
    Tractebel Energy Marketing, Inc., ER97-4623-000
    TransCanada Energy Ltd., ER97-0800-000
    
    [[Page 49180]]
    
    United Illuminating Company, ER96-0104-000
    Unitil Power Corp., ER98-1782-000
    Vermont Marble Power Division, ER95-1165-000
    Western Power Services, Inc., ER97-2662-000
    Williams Energy Services Company, ER97-4623-000
    
        Comment date: September 15, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard to protest such filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in 
    accordance with Rules 211 and 214 of the Commission's rule of practice 
    and procedure (18 CFR 385.211 and 385.214). All such motions or 
    protests should be filed on or before the comment date. Protests will 
    be considered by the Commission in determining the appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of these filings are on file with the Commission and 
    are available for public inspection. This filing may also be viewed on 
    the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
    2222 for assistance).
    David P. Boergers,
    Secretary.
    [FR Doc. 99-23522 Filed 9-9-99; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
09/10/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-23522
Dates:
September 23, 1999, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
49177-49180 (4 pages)
Docket Numbers:
Docket No. EG99-219-000, et al.
PDF File:
99-23522.pdf