[Federal Register Volume 64, Number 175 (Friday, September 10, 1999)]
[Notices]
[Page 49184]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-23617]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6246-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared August 2, 1999 Through August
6, 1999 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 9, 1999 (64 FR
17362).
Draft EISs
ERP No. D-AFS-J65302-UT
Rating EC2, South Manti Timber Salvage, To address Ecological and
Economic Values affected by Spruce Beetle Activity in the South Manti
Project, Manti-La National Forest, Ferron-Price and Sanpete Ranger
Districts, Sanpete and Sevier Counties, UT.
Summary: EPA expressed environmental concerns regarding potential
increased sediment loads to several water quality limited streams, and
the analysis of potential wetland impacts. EPA recommends that the
Forest Service identify and commit to mitigation that would reduce
sediment yield to the 303(d) listed streams equal to or greater than
the predicted sediment yield from project activities.
ERP No. D-BLM-J02036-WY
Rating EC2, Continental Divide/Wamsutter II Natural Gas Project,
Implementation of Natural Gas Exploration and Development, Sweetwater
and Carbon Counties, WY.
Summary: EPA expressed environmental concerns about potentially
significant adverse impacts to air quality, surface water quality,
wildlife, and desert habitat. EPA recommended the development and
implementation of an Adaptive Environmental Management Plan (AEMP) to
verify, monitor, and modify proposed mitigation measures to off-set
potential adverse impacts.
ERP No. D-BLM-J02037-WY
Rating EC2, South Baggs Natural Gas Development Area, Proposal to
Drill and Develop 50 Natural Gas Wells, Application for Permit to Drill
and COE Section 404 Permit, Carbon County, WY.
Summary: EPA expressed environmental concerns about potentially
significant adverse impacts to air quality, water quality, soils,
wildlife and wetlands. EPA recommended the development and
implementation of an Adaptive Environmental Management Plan (AEMP) to
verify, monitor, and modify proposed mitigation measures to off-set
potential adverse impacts.
ERP No. D-BLM-J65304-WY
Rating EC2, Wyodak Coal Bed Methane Project, Implementation of Road
Construction, Drilling Operation, Electrical Distribution Line, Powder
River Basin, Campbell and Converse Counties, WY.
Summary: EPA expressed environmental concerns related to water
quantity and monitoring procedures. EPA requested that additional
information on these issues be included in the next document.
ERP No. D-COE-F39036-IL
Rating EO2, Hunter Lake New Supplemental Water Supply Reservoir,
Construction, City of Springfield Application for Permit, Sangamon
County, IL.
Summary: EPA expressed objection regarding the Purpose and Need/
alternatives analysis, potential impact to water quality and wetlands,
and the lack of completed mitigation plans.
ERP No. D-FHW-D40299-WV
Rating EC2, Coalfields Expressway Transportation Improvements,
Funding, NPDES and COE Section 404 Permits, McDowell, Wyoming and
Raleigh Counties, WV.
Summary: EPA expressed environmental concerns that the level of
detail provided for a highway corridor is not sufficient for selecting
an alignment or footprint within that corridor. The Final EIS should
explain whether there will be an opportunity to review and comment on
alignments within the selected corridor.
ERP No. D-NOA-A91066-00
Rating EC2, Tilefish Fishery Management Plan (FMP), (Lopholatilus
chamaeleonticeps), To Prevent Overfishing and to Rebuild the Resource
of Tilefish, Located along the Atlantic Ocean.
Summary: EPA had environmental concerns about the proposed
regulations and the sufficiency of the information in the document.
Those concerns focused mainly on the alternatives section of the
document.
Final EISs
ERP No. F-EDA-D80026-PA
Lackawanna County New Business Park, Development and Operation,
Funding Support from Economic Development Administration (EDA) under
Title I, Site Lies Within Moosic Mountain Range, Straddling Jessup and
Olyphant Boroughs, Lackawanna County, PA.
Summary: EPA continues to have concerns with the selection of the
preferred alternative and its impacts on a rare terrestial habitat and
species of special status.
ERP No. F-NCP-D61050-MD
National Harbor Project, Construction and Operation along the
Potomac River on a 534 acre site adjacent to the Capital Beltway and
Oxon Hill Manor, COE Section 10 and 404 Permits, Prince George's
County, MD.
Summary: EPA has concerns regarding impacts to aquatic resources,
air pollution and environmental justice issues. EPA is trying to
resolve some of the outstanding issues with the applicant.
ERP No. F-NOA-A91064-00
Atlantic Bluefish Fishery Management, Fishery Management Plan,
Implementation, Nova Scotia to Florida, Northwestern Atlantic Ocean.
Summary: EPA expressed a lack of objection to the proposed action.
ERP No. F-USN-K11078-00
Marianas Islands Military Training, Implementation, Marianas
Training Plan, Guam, Commonwealth of the Northern Mariana Islands,
Asia, Hawaii and Alaska.
Summary: EPA expressed environmental concerns on the effects on
coral spawning from military training; the possibility of accidental
introduction of Brown Tree Snake to Farallon de Medinilla (FDM); and to
requested additional compensatory mitigations for biological resource
impacts on FDM.
Dated: September 7, 1999.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 99-23617 Filed 9-9-99; 8:45 am]
BILLING CODE 6560-50-U