2010-22516. Central Vermont Public Service Corporation; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Start Printed Page 55317
September 2, 2010.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No.: 11475-013.
c. Date Filed: June 17, 2010.
d. Applicant: Central Vermont Public Service Corporation.
e. Name of Project: Carver Falls Hydroelectric Project.
f. Location: On the Poultney River, in Washington County, New York and Rutland County, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael Scarzello, Generation Asset Manager, Central Vermont Public Service Corporation, 77 Grove St., Rutland, VT 05701, (802) 747-5207.
i. FERC Contact: Christopher Chaney, (202) 502-6778, christopher.chaney@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests: October 4, 2010.
All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. Description of Application: The applicant seeks approval to replace the existing Unit #1 turbine, with a hydraulic capacity of 162 cfs and a nameplate capacity of 1,100 kW, with a new turbine unit having a hydraulic capacity of 177 cfs and a nameplate capacity of 1,451 kW. The replacement of the Unit #1 turbine will increase the total project generation from 1,900 kW to 2,251 kW, and increase total project hydraulic capacity from 254 cfs to 269 cfs.
l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
Any filings must bear in all capital letters the title “COMMENTS,” “PROTEST,” or “MOTION TO INTERVENE,” as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
o. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. 2010-22516 Filed 9-9-10; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 09/10/2010
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2010-22516
- Pages:
- 55317-55317 (1 pages)
- Docket Numbers:
- Project No. 11475-013
- EOCitation:
- of 2010-09-02
- PDF File:
- 2010-22516.pdf