96-23194. Arizona Public Service Company; Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing  

  • [Federal Register Volume 61, Number 177 (Wednesday, September 11, 1996)]
    [Notices]
    [Pages 47962-47963]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-23194]
    
    
    
    [[Page 47962]]
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Nos. STN 50-528, STN 50-529, and STN 50-530]
    
    
    Arizona Public Service Company; Notice of Consideration of 
    Issuance of Amendments to Facility Operating Licenses, Proposed No 
    Significant Hazards Consideration Determination, and Opportunity for a 
    Hearing
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of amendments to Facility Operating License Nos. 
    NPF-41, NPF-51, and NPF-74 issued to Arizona Public Service Company 
    (the licensee) for operation of the Palo Verde Nuclear Generating 
    Station, Units 1, 2, and 3, located in Maricopa County, Arizona.
        The proposed amendment would modify the technical specifications 
    (TS) to increase the minimum required amount of anhydrous trisodium 
    phosphate (TSP) in the containment baskets. TSP is used to ensure that, 
    following a postulated design basis loss of coolant accident (LOCA), 
    the containment sump pH is maintained greater than or equal to 7.
        Before issuance of the proposed license amendment, the Commission 
    will have made findings required by the Atomic Energy Act of 1954, as 
    amended (the Act) and the Commission's regulations.
        The Commission has made a proposed determination that the amendment 
    request involves no significant hazards consideration. Under the 
    Commission's regulations in 10 CFR 50.92, this means that operation of 
    the facility in accordance with the proposed amendment would not (1) 
    Involve a significant increase in the probability or consequences of an 
    accident previously evaluated; or (2) create the possibility of a new 
    or different kind of accident from any accident previously evaluated; 
    or (3) involve a significant reduction in a margin of safety. As 
    required by 10 CFR 50.91(a), the licensee has provided its analysis of 
    the issue of no significant hazards consideration. The NRC staff's 
    analysis is presented below.
        1. The proposed change does not involve a significant increase in 
    the probability or consequences of an accident previously evaluated.
        The proposed amendment does not involve any change to the method of 
    operation of any plant equipment or modify any plant equipment. The 
    proposed amendment only affects a passive component that mitigates the 
    consequences of a design basis LOCA, and does not affect the event 
    initiation scenarios for accidents previously evaluated. Furthermore, 
    the proposed amendment ensures that the correct volumes and mass of 
    anhydrous TSP are used such that the post-LOCA emergency core cooling 
    system (ECCS) solution is maintained at a pH above 7, which is the 
    current basis for use of TSP. This basis maintains the existing 
    analysis of consequences, which is that maintaining the ECCS solution 
    above a pH of 7 ensures that the radiological consequences are 
    minimized by preventing significant amounts of iodine released from 
    fuel failures, and subsequently dissolved in the recirculating water, 
    from converting to a volatile form and evolving into the containment 
    atmosphere. Therefore, the proposed amendments do not involve a 
    significant increase in the probability or consequences of an accident.
        2. The proposed change does not create the possibility of a new or 
    different kind of accident from any accident previously evaluated.
        The proposed amendment does not modify the plants' configuration, 
    involve any change to plant equipment, or change the method of plant 
    operation. The proposed amendment does not affect any equipments that 
    are currently assumed as accident initiators. The proposed amendment 
    only increases the amount of TSP, which is a passive component used to 
    mitigate the consequences of an accident, thus no new failure modes are 
    introduced by the proposed amendment. Therefore, the proposed amendment 
    does not create the possibility of a new or different kind of accident 
    from any accident previously evaluated.
        3. The proposed change does not involve a significant reduction in 
    a margin of safety.
        The current margin of safety is defined by assuring that the ECCS 
    circulating water is maintained above a pH of 7 following a LOCA. The 
    proposed change continues to ensure this condition, therefore, the 
    proposed amendment does not involve a significant reduction in a margin 
    of safety.
        Based on this review, it appears that the three standards of 10 CFR 
    50.92(c) are satisfied. Therefore, the NRC staff proposes to determine 
    that the amendment request involves no significant hazards 
    consideration.
        The Commission is seeking public comments on this proposed 
    determination. Any comments received within 30 days after the date of 
    publication of this notice will be considered in making any final 
    determination.
        Normally, the Commission will not issue the amendment until the 
    expiration of the 30-day notice period. However, should circumstances 
    change during the notice period such that failure to act in a timely 
    way would result, for example, in derating or shutdown of the facility, 
    the Commission may issue the license amendment before the expiration of 
    the 30-day notice period, provided that its final determination is that 
    the amendment involves no significant hazards consideration. The final 
    determination will consider all public and State comments received. 
    Should the Commission take this action, it will publish in the Federal 
    Register a notice of issuance and provide for opportunity for a hearing 
    after issuance. The Commission expects that the need to take this 
    action will occur very infrequently.
        Written comments may be submitted by mail to the Chief, Rules 
    Review and Directives Branch, Division of Freedom of Information and 
    Publications Services, Office of Administration, U.S. Nuclear 
    Regulatory Commission, Washington, DC 20555-0001, and should cite the 
    publication date and page number of this Federal Register notice. 
    Written comments may also be delivered to Room 6D22, Two White Flint 
    North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 
    4:15 p.m. Federal workdays. Copies of written comments received may be 
    examined at the NRC Public Document Room, the Gelman Building, 2120 L 
    Street, NW., Washington, DC.
        The filing of requests for hearing and petitions for leave to 
    intervene is discussed below.
        By ____________, the licensee may file a request for a hearing with 
    respect to issuance of the amendment to the subject facility operating 
    license and any person whose interest may be affected by this 
    proceeding and who wishes to participate as a party in the proceeding 
    must file a written request for a hearing and a petition for leave to 
    intervene. Requests for a hearing and a petition for leave to intervene 
    shall be filed in accordance with the Commission's ``Rules of Practice 
    for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested 
    persons should consult a current copy of 10 CFR 2.714 which is 
    available at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and at the local public 
    document room located at the Phoenix Public Library, 1221 N. Central 
    Avenue, Phoenix, Arizona 85004. If a request for a hearing or petition 
    for leave to intervene is filed by the above date, the Commission or an 
    Atomic Safety and Licensing Board, designated by the
    
    [[Page 47963]]
    
    Commission or by the Chairman of the Atomic Safety and Licensing Board 
    Panel, will rule on the request and/or petition; and the Secretary or 
    the designated Atomic Safety and Licensing Board will issue a notice of 
    hearing or an appropriate order.
        As required by 10 CFR 2.714, a petition for leave to intervene 
    shall set forth with particularity the interest of the petitioner in 
    the proceeding, and how that interest may be affected by the results of 
    the proceeding. The petition should specifically explain the reasons 
    why intervention should be permitted with particular reference to the 
    following factors: (1) The nature of the petitioner's right under the 
    Act to be made party to the proceeding; (2) the nature and extent of 
    the petitioner's property, financial, or other interest in the 
    proceeding; and (3) the possible effect of any order which may be 
    entered in the proceeding on the petitioner's interest. The petition 
    should also identify the specific aspect(s) of the subject matter of 
    the proceeding as to which petitioner wishes to intervene. Any person 
    who has filed a petition for leave to intervene or who has been 
    admitted as a party may amend the petition without requesting leave of 
    the Board up to 15 days prior to the first prehearing conference 
    scheduled in the proceeding, but such an amended petition must satisfy 
    the specificity requirements described above.
        Not later than 15 days prior to the first prehearing conference 
    scheduled in the proceeding, a petitioner shall file a supplement to 
    the petition to intervene which must include a list of the contentions 
    which are sought to be litigated in the matter. Each contention must 
    consist of a specific statement of the issue of law or fact to be 
    raised or controverted. In addition, the petitioner shall provide a 
    brief explanation of the bases of the contention and a concise 
    statement of the alleged facts or expert opinion which support the 
    contention and on which the petitioner intends to rely in proving the 
    contention at the hearing. The petitioner must also provide references 
    to those specific sources and documents of which the petitioner is 
    aware and on which the petitioner intends to rely to establish those 
    facts or expert opinion. Petitioner must provide sufficient information 
    to show that a genuine dispute exists with the applicant on a material 
    issue of law or fact. Contentions shall be limited to matters within 
    the scope of the amendment under consideration. The contention must be 
    one which, if proven, would entitle the petitioner to relief. A 
    petitioner who fails to file such a supplement which satisfies these 
    requirements with respect to at least one contention will not be 
    permitted to participate as a party.
        Those permitted to intervene become parties to the proceeding, 
    subject to any limitations in the order granting leave to intervene, 
    and have the opportunity to participate fully in the conduct of the 
    hearing, including the opportunity to present evidence and cross-
    examine witnesses.
        If a hearing is requested, the Commission will make a final 
    determination on the issue of no significant hazards consideration. The 
    final determination will serve to decide when the hearing is held.
        If the final determination is that the amendment request involves 
    no significant hazards consideration, the Commission may issue the 
    amendment and make it immediately effective, notwithstanding the 
    request for a hearing. Any hearing held would take place after issuance 
    of the amendment.
        If the final determination is that the amendment request involves a 
    significant hazards consideration, any hearing held would take place 
    before the issuance of any amendment.
        A request for a hearing or a petition for leave to intervene must 
    be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555-0001, Attention: Docketing and 
    Services Branch, or may be delivered to the Commission's Public 
    Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, 
    by the above date. Where petitions are filed during the last 10 days of 
    the notice period, it is requested that the petitioner promptly so 
    inform the Commission by a toll-free telephone call to Western Union at 
    1-(800) 248-5100 (in Missouri 1-(800) 342-6700). The Western Union 
    operator should be given Datagram Identification Number N1023 and the 
    following message addressed to William H. Bateman, Director, Project 
    Directorate IV-2: petitioner's name and telephone number, date petition 
    was mailed, plant name, and publication date and page number of this 
    Federal Register notice. A copy of the petition should also be sent to 
    the Office of the General Counsel, U.S. Nuclear Regulatory Commission, 
    Washington, DC 20555-0001, and to Nancy C. Loftin, Esq., Corporate 
    Secretary and Counsel, Arizona Public Service Company, P.O. Box 53999, 
    Mail Station 9068, Phoenix, Arizona 85072-3999, attorney for the 
    licensee.
        Nontimely filings of petitions for leave to intervene, amended 
    petitions, supplemental petitions and/or requests for hearing will not 
    be entertained absent a determination by the Commission, the presiding 
    officer or the presiding Atomic Safety and Licensing Board that the 
    petition and/or request should be granted based upon a balancing of the 
    factors specified in 10 CFR 2.714(a)(1) (i)-(v) and 2.714(d).
        For further details with respect to this action, see the 
    application for amendment dated June 28, 1996, which is available for 
    public inspection at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and at the local public 
    document room located at the Phoenix Public Library, 1221 N. Central 
    Avenue, Phoenix, Arizona 85004.
    
        Dated at Rockville, Maryland, this 6th day of September 1996.
    
        For the Nuclear Regulatory Commission
    James W. Clifford,
    Senior Project Manager, Project Directorate IV-2, Division of Reactor 
    Projects III/IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 96-23194 Filed 9-10-96; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
09/11/1996
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
96-23194
Pages:
47962-47963 (2 pages)
Docket Numbers:
Docket Nos. STN 50-528, STN 50-529, and STN 50-530
PDF File:
96-23194.pdf