97-24069. ANR Pipeline Company; Notice of Application
[Federal Register Volume 62, Number 176 (Thursday, September 11, 1997)]
[Notices]
[Pages 47799-47800]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-24069]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-719-000]
ANR Pipeline Company; Notice of Application
September 5, 1997.
Take notice that on August 29, 1997, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No.
CP97-719-000, an application pursuant to Section 7(b) of the Natural
Gas Act for permission and approval to abandon a natural gas storage
and transportation service for Proliance Energy LLC (Proliance),
formerly Central Indiana Gas Company and Indiana Gas Company, all as
more fully set forth in the application on file with the Commission and
open to public inspection.
ANR asserts that by mutual agreement ANR and Proliance have agreed
to replace the service authorized under ANR's Rate Schedule X-22 with a
mix
[[Page 47800]]
of services provided for under ANR's FERC Gas Tariff, Second Revised
Volume No. 2. ANR states that no facilities are proposed to be
abandoned.
Any person desiring to be heard or to make protest with reference
to said application should on or before September 26, 1997, file with
the Federal Energy Regulatory Commission, Washington, D.C. 20426, a
motion to intervene or a protest in accordance with the requirements of
the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 18
CFR 385.211) and the Regulations under the Natural Gas Act (18 CFR
157.10). All protests filed with the Commission will be considered by
it in determining the appropriate action to be taken but will not serve
to make the protestants parties to the proceeding. Any person wishing
to become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure provided for, unless otherwise advised, it will
be unnecessary for ANR to appear or be represented at the hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 97-24069 Filed 9-10-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/11/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-24069
- Pages:
- 47799-47800 (2 pages)
- Docket Numbers:
- Docket No. CP97-719-000
- PDF File:
-
97-24069.pdf