03-23183. Drawbridge Operation Regulation; Mississippi River, Iowa and Illinois  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary final rule.

    SUMMARY:

    The Coast Guard is changing the regulation governing the Rock Island Railroad & Highway Drawbridge, across the Upper Mississippi River at Mile 482.9, at Rock Island, Illinois. The drawbridge need not open for river traffic and may remain in the closed-to-navigation position from 7:30 a.m. to 11:30 a.m. on September 28, 2003. This rule would allow the annually scheduled running of a foot race as part of a local community event.

    DATES:

    This rule is effective 7:30 a.m. to 11:30 a.m., September 28, 2003.

    ADDRESSES:

    Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket [CGD08-03-011] and are available for inspection or copying at room 2.107f in the Robert A. Young Federal Building at Eighth Coast Guard District, between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Roger K. Wiebusch, Bridge Administrator, (314) 539-3900, extension 2378.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory Information

    On July 29, 2003, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulation; Mississippi River, Iowa and Illinois in the Federal Register (68 FR 44506). We received no comment letters on the proposed rule. No public hearing was requested, and none was held.

    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. Hundreds of foot race participants will cross the bridge during the effective period of this rule. As a matter of public safety, it is essential that the bridge remain in the closed to navigation position during the effective period. Start Printed Page 53514

    Background and Purpose

    The Department of the Army Rock Island Arsenal requested a temporary change to the operation of the Rock Island Railroad & Highway Drawbridge across the Upper Mississippi River, Mile 482.9 at Rock Island, Illinois to allow the drawbridge to remain in the closed to navigation position for a four hour period while a foot race is run across the drawbridge. Navigation on the waterway consists primarily of commercial tows and recreational watercraft that will be minimally impacted by the limited closure period of four hours. Presently, the draw opens on signal for passage of river traffic. The Rock Island Arsenal requested the drawbridge be permitted to remain closed-to-navigation from 7:30 a.m. until 11:30 a.m. on Sunday, September 28, 2003.

    Discussion of Comments and Changes

    The Coast Guard received no comment letters. No changes will be made to this final rule.

    Regulatory Evaluation

    This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).

    The Coast Guard expects that this temporary change to operation of the Rock Island Railroad & Highway Drawbridge to have minimal economic impact on commercial traffic operating on the Upper Mississippi River. This temporary change has been written in such a manner as to allow for minimal interruption of the drawbridge's regular operation.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this rule would not have a significant economic impact on a substantial number of small entities. This rule will be in effect for only 4 hours early on a Sunday morning, and the Coast Guard expects the impact of this action to be minimal.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking. Small businesses may send comments on the actions of Federal employees who enforce or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to common on actions by employees of the Coast Guard, call 1-800-REG-FAIR (1-800-734-3247).

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.

    Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. It has not been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Environment

    We have considered the environmental impact of this rule and concluded that under figure 2-1, paragraph (32)(e), of Commandant Instruction M16475.1D, this rule is categorically excluded from further environmental documentation. Paragraph 32(e) excludes the promulgation of operating regulations or procedures for drawbridges from the environmental documentation requirements of the National Environmental Policy Act (NEPA). Since this regulation would alter the normal operating conditions of the drawbridge, it falls within this exclusion. A “Categorical Exclusion Determination” is available in the Start Printed Page 53515docket for inspection or copying where indicated under ADDRESSES.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects

    Regulations

    Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; Department of Homeland Security Delegation No. 0170.1; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

    End Authority Start Amendment Part

    2. Effective 7:30 a.m. to 11:30 a.m. on September 28, 2003, § 117.T395 is added to read as follows:

    End Amendment Part
    Upper Mississippi River.

    Rock Island Railroad and Highway Drawbridge, Mile 482.9, Upper Mississippi River.

    From 7:30 a.m. to 11:30 a.m. on September 28, 2003 the drawspan need not open for river traffic and may be maintained in the closed-to-navigation position.

    Start Signature

    Dated: September 2, 2003.

    R.F. Duncan,

    Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 03-23183 Filed 9-10-03; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
9/28/2003
Published:
09/11/2003
Department:
Coast Guard
Entry Type:
Rule
Action:
Temporary final rule.
Document Number:
03-23183
Dates:
This rule is effective 7:30 a.m. to 11:30 a.m., September 28, 2003.
Pages:
53513-53515 (3 pages)
Docket Numbers:
CGD08-03-011
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
03-23183.pdf
CFR: (1)
33 CFR 117.T395