73 FR 52852 E8-21058. Office Electricity Delivery and Energy Reliability; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act  

  • Summary

    On May 19, 2008, CPV Maryland, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. Section 201(d) of FUA requires DOE to publish a notice of receipt of self-certifications in the Federal Register.

    Table of Contents

    ADDRESSES: Back to Top

    Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

    FOR FURTHER INFORMATION CONTACT: Back to Top

    Ellen Russell at (202) 586-9624.

    SUPPLEMENTARY INFORMATION: Back to Top

    Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source.

    Pursuant to FUA section 201(d), in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. The Secretary is required to publish a notice in the Federal Register reciting that the certification has been filed.

    The following owner of a proposed new base load electric powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:

    Owner: CPV Maryland, LLC.

    Capacity: 640 megawatts (MW).

    Plant Location: Waldorf, Maryland.

    In-Service Date: Between Summer 2011 and Summer 2012.

    Issued in Washington, DC on September 3, 2008.

    Anthony J. Como,

    Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.

    [FR Doc. E8-21058 Filed 9-10-08; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
09/11/2008
EntryType:
Notice
Action:
Notice of filing.
Document Number:
E8-21058
Document Citation:
73 FR 52852
Dates:
Between Summer 2011 and Summer 2012.
Pages:
52852-52852 (1 pages)