2011-23214. Duke Energy Carolinas, LLC; Southern Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board  

  • Start Preamble

    Pursuant to delegation by the Commission dated December 29, 1972, published in the Federal Register, 37 FR 28,710 (1972), and the Commission's regulations, see, e.g., 10 CFR 2.104, 2.105, 2.300, 2.309, 2.313, 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over this proceeding, which involves the following captioned cases:

    Duke Energy Carolinas, LLC, (William States Lee III Nuclear Station, Units 1 and 2), Docket Nos. 52-018-COL & 52-019-COL;

    Southern Nuclear Operating Company, (Vogtle Electric Generating Plant, Start Printed Page 56243Units 3 and 4), Docket Nos. 52-025-COL & 52-026-COL.

    This proceeding was triggered by August 11, 2011 motions filed by the Blue Ridge Environmental Defense League (BREDL) seeking to reopen the record and/or admit a new contention in the two above-captioned cases based on the Fukushima Task Force Report. The contested proceedings in both cases had been terminated at the Atomic Safety and Licensing Board Panel (ASLBP) level, and jurisdiction over BREDL's filings initially lay with the Commission. By Order dated August 18, 2011, the Commission, acting through the Office of the Secretary, referred the pleadings to the ASLBP for appropriate action consistent with 10 CFR 2.309 and 2.326.

    The Board is comprised of the following administrative judges:

    Alan S. Rosenthal, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;

    Dr. Gary S. Arnold, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;

    Dr. William H. Reed, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    All correspondence, documents, and other materials shall be filed in accordance with the NRC E-Filing rule, which the NRC promulgated in August 2007 (72 FR 49,139).

    Start Signature

    Dated: Issued at Rockville, Maryland, this 6th day of September 2011.

    E. Roy Hawkens,

    Chief Administrative Judge, Atomic Safety and Licensing Board Panel.

    End Signature End Preamble

    [FR Doc. 2011-23214 Filed 9-9-11; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Comments Received:
0 Comments
Published:
09/12/2011
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
2011-23214
Pages:
56242-56243 (2 pages)
Docket Numbers:
Docket Nos. 52-018-COL, 52-019-COL, 52-025-COL, 52-026-COL, ASLBP No. 11-913-01-COL-BD01
PDF File:
2011-23214.pdf
Supporting Documents:
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Main Control Room Emergency Habitability System Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; PXS/ADS Line Resistance Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Pipe Rupture Hazard and Flooding Analysis
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Addition of a Residual Heat Removal Suction Relief Valve for Low-Temperature Overpressure Protection; Exemption and Combined License Amendment; Issuance
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Clarification of Raceway and Raceway System Designations; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Central Chilled Water System Optimization Changes; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria; Determination of Successful Completion of Inspections, Tests, and Analyses