-
Start Preamble
On April 14, 2023, Alabama Power Company (Alabama Power) filed a Notice of Intent (NOI) for the proposed 1,600-megawatt Chandler Mountain Pumped Storage Project. The project would have been located on Little Canoe Creek East and Chandler Mountain in Etowah and St. Clair Counties, near the town of Steele, Alabama. On August 17, 2023, Alabama Power filed a notice of withdrawal of the NOI for the above-referenced project.
No motion in opposition to the notice of withdrawal has been filed, and the Commission has taken no action to disallow the withdrawal. Pursuant to Start Printed Page 62566 Rule 216(b) of the Commission's Rules of Practice and Procedure,[1] the withdrawal of the NOI became effective on September 1, 2023, and this prefiling process is hereby terminated.
Start SignatureDated: September 5, 2023.
Kimberly D. Bose,
Secretary.
Footnotes
1. 18 CFR 385.216(b) (2022).
Back to Citation[FR Doc. 2023–19570 Filed 9–11–23; 8:45 am]
BILLING CODE 6717–01–P
Document Information
- Published:
- 09/12/2023
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2023-19570
- Pages:
- 62565-62566 (2 pages)
- Docket Numbers:
- Project No. 15229-001
- PDF File:
- 2023-19570.pdf