[Federal Register Volume 59, Number 177 (Wednesday, September 14, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-22702]
[[Page Unknown]]
[Federal Register: September 14, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. GT94-67-000]
Texas Eastern Transmission Corp.; Notice of Proposed Changes In
FERC Gas Tariff
September 8, 1994.
Take notice that Texas Eastern Transmission Corporation (``Texas
Eastern'') on September 1, 1994 submitted for filing as part of its
FERC Gas Tariff, Sixth Revised Volume No. 1, six copies each of the
tariff sheets listed on Appendix A of the filing.
Texas Eastern states that pursuant to Sec. 9.1 of the General Terms
and Conditions of Texas Eastern's FERC GAS Tariff, Sixth Revised Volume
No. 1, the tariff sheets listed on Appendix A set forth the Operational
Segment Capacity Entitlements and firm receipt point entitlements at
Kosciusko, Mississippi. Texas Eastern states that the 1994 Entitlements
were calculated using the same methodology as utilized to calculate the
initial Entitlements which were approved by the Commission in Texas
Eastern's Order No. 636 restructuring proceedings in Docket No. RS92-
11, et al.
Texas Eastern states that in order to reflect the modifications, it
is submitting Eighth Revised Sheet Nos. 550, 551, 557, 558, 564, 565,
571, 572, 600 and 601 and Ninth Revised Sheet Nos. 549, 556, 563, 570
and 599 to reflect necessary modifications to Secs. 9.2, 9.3, 9.4, 9.5
and 14.4 of the General Terms and Conditions of its FERC Gas Tariff,
Sixth Revised Volume No. 1.
In addition to the changes discussed above, Texas Eastern states
that it is submitting Eighth Revised Sheet Nos. 548, 551, 555, 558,
562, 565, 569, 572, 577, 580, 583 and 601 to reflect the modifications
to Secs. 9.2, 9.3, 9.4, 9.5, 9.9 and 14.4 necessary to reflect the
termination by its own terms of an executed service agreement with
Texas Gas Transmission Corporation (Texas Gas) under Texas Eastern's
Rate Schedule FT-1. Texas Eastern states that it is representing this
capacity, available November 1, 1994, as ``Available Firm'' on the
tariff sheets.
The proposed effective date of the tariff sheets is November 1,
1994, as stated in Section 9.1 of Texas Eastern's FERC Gas Tariff,
Sixth Revised Volume No. 1 and in accordance with the termination of
the Rate Schedule FT-1 Service Agreement with Texas Gas. Texas Eastern
states that copies of the filing were served on firm customers of Texas
Eastern and interested state commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure. All such motions or protests should be filed
on or before September 15, 1994. Protests will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Any person
wishing to become a party must file a motion to intervene. Copies of
this filing are on file with the Commission and are available for
public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-22702 Filed 9-13-94; 8:45 am]
BILLING CODE 6717-01-M