94-22712. Southern Natural Gas Company; Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 59, Number 177 (Wednesday, September 14, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-22712]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 14, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP94-386-000]
    
     
    
    Southern Natural Gas Company; Proposed Changes in FERC Gas Tariff
    
    September 8, 1994.
        Take notice that on September 1, 1994, Southern Natural Gas Company 
    (Southern) tendered for filing as part of its FERC Gas Tariff, Seventh 
    Revised Volume No. 1, the following tariff sheets to be effective on 
    the dates specified:
    
    ------------------------------------------------------------------------
                       Tariff sheets                       Effective date   
    ------------------------------------------------------------------------
    First Revised Sheet No. 98........................  Oct. 1, 1994.       
    First Revised Sheet No. 126.......................  Oct. 2, 1994.       
    Second Revised Sheet No. 216......................  Oct. 1, 1994.       
    First Revised Sheet No. 275.......................  Nov. 1, 1994.       
    Second Revised Sheet Nos. 404-408.................  Aug. 1, 1994.       
    Second Revised Sheet Nos. 410-411.................  Aug. 1, 1994.       
    ------------------------------------------------------------------------
    
        Southern states that the purpose of this filing is to make the 
    following revisions to its transportation tariff: (1) Clarify that 
    requests for firm transportation service must be requested to commence 
    within 60 days after the date of the request unless facilities or 
    authorization is required; (2) implement a ``no-bump'' rule for 
    scheduling nominations at alternate firm (A-1) receipt points; (3) 
    provide a one-day turnaround for capacity release transactions which 
    are prearranged and are bid at the maximum rate for the full volume, 
    capacity and term; and (4) update Southern's Index of Purchasers. 
    Southern has requested all waivers necessary to make these sheets 
    effective as set forth above.
        Southern states that copies of the filing will be served upon its 
    shippers and interested state commissions.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 385.214). All such 
    motions and protests should be filed on or before September 15, 1994. 
    Protests will not be considered by the Commission in determining the 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-22712 Filed 9-13-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/14/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-22712
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: September 14, 1994, Docket No. RP94-386-000