95-22807. Tennessee Gas Pipeline Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 178 (Thursday, September 14, 1995)]
[Notices]
[Page 47745]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-22807]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-726-000]
Tennessee Gas Pipeline Co.; Notice of Request Under Blanket
Authorization
September 8, 1995.
Take notice that on September 1, 1995, Tennessee Gas Pipeline
Company (Tennessee), P.O. Box 2511, Houston, Texas 77252, file in
Docket No. CP95-726-000 a request pursuant to Secs. 157.205 and 157.212
of the Commission's Regulations under the Natural Gas Act (18 CFR
157.205, 157.212) for authorization to operate three (3) existing
delivery point facilities, that were initially constructed under
Section 311(a) of the Natural Gas Policy Act of 1978 (NGPA), under
Tennessee's blanket certificate issued in Docket No. CP82-413-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
Tennessee states that it has recently constructed three delivery
points under Section 311(a) of the NGPA for use in the transportation
of natural gas under Subpart B of Part 284 of the Commission's
Regulations. Tennessee further states that granting of the requested
authorization will enable Tennessee to fully utilize these facilities
for all transportation services, pursuant to Section 311 of the NGPA
and Section 7 of the Natural Gas Act and will increase the
transportation options of customers on Tennessee's system.
It is stated that delivery volumes through the existing delivery
points would not impact Tennessee's peak day and annual deliveries;
that the proposed activity is not prohibited by its existing tariff;
and that Tennessee has sufficient capacity to accommodate the changes
proposed herein without detriment or disadvantage to Tennessee's other
customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-22807 Filed 9-13-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/14/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-22807
- Pages:
- 47745-47745 (1 pages)
- Docket Numbers:
- Docket No. CP95-726-000
- PDF File:
-
95-22807.pdf