[Federal Register Volume 63, Number 177 (Monday, September 14, 1998)]
[Notices]
[Page 49112]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-24516]
[[Page 49112]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing With the Commission
September 8, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major License.
b. Project No.: P-2731-020.
c. Date Filed: May 27, 1998.
d. Applicant: Central Vermont Public Service Corporation.
e. Name of Project: Weybridge Hydroelectric Project.
f. Location: On Otter Creek in the towns of Weybridge and New Haven
and in the county of Addison, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact:
Mr. Kent Brown, V.P., Central Vermont Public Service Corporation, 77
Grove Street, Rutland, Vermont 05701, (802) 747-5326.
John C. Greenan, P.E., Central Vermont Public Service Corporation, 77
Grove Street, Rutland, Vermont 05701, (802) 747-5707.
Timothy J. Oakes, Kleinschmidt Associates, 33 West Main Street,
Strasburg, PA 17579, (717) 687-7211.
i. FERC Contact: Jack Duckworth (202) 219-2818.
j. Comment Date: November 10, 1998.
k. Status of Environmental Analysis: This application has been
accepted, but it is not ready for environmental analysis at this time.
l. Description of the Project: (1) a 30-foot-high, 302.6-foot-long
concrete gravity dam consisting of two spillway sections, a 150-foot-
long west spillway section, topped with a 6-foot-high hinged steel
flashboard, and abutted by a 20-foot-wide and 10-foot-high Taintor
gate, and a 116-foot-long east spillway section topped with an
automatically inflated rubber weir; (2) a 1.5-mile-long, 62-acre
impoundment with a normal water surface elevation of 174.3 feet mean
sea level (msl); (3) a powerhouse integral with the dam containing a
single turbine generator with an installed capacity of 3.0 megawatts
(MW); (4) transmission facilities; and (5) appurtenant facilities.
m. Purpose of Project: The power generated by this project is used
to assist the Central Vermont Public Service Corporation in meeting
electrical load requirements of its power grid. Continued operation of
this project would provide an average annual generation of 14,000
megawatt hours (MWH).
n. Available Locations of Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference and Files and Maintenance Branch, located at 888 First
Street, NE, Room 2A-1, Washington, DC 20426. A copy is also available
for inspection and reproduction at Central Vermont Public Service
Corporation, 77 Grove Street, Rutland, Vermont 05701.
Comments, Protests, or Motions to Intervene--Anyone may submit
comments, protests, or motions to intervene in accordance with the
Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In
determining the appropriate action to be taken, the Commission will
consider all protests and comments filed, but only those who file a
motion to intervene in accordance with the Commission's Rules may
become a party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
Filing and Service of Responsive Documents--The application is not
ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST or ``MOTION TO INTERVENE''; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.21001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC 20426. An additional copy must be
sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C. 20426. A copy of any protest or motion to
intervene must be specified in the particular application.
David P. Boergers,
Secretary.
[FR Doc. 98-24516 Filed 9-11-98; 8:45 am]
BILLING CODE 6717-01-M