98-24519. Summit Hydropower, Inc.; Notice of Surrender of Preliminary Permit  

  • [Federal Register Volume 63, Number 177 (Monday, September 14, 1998)]
    [Notices]
    [Page 49117]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-24519]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Project No. 11577-001]
    
    
    Summit Hydropower, Inc.; Notice of Surrender of Preliminary 
    Permit
    
    September 8, 1998.
        Take notice that Summit Hydropower, Inc., permittee for the 
    proposed Windsor Locks Hyrdro Project, has requested that its 
    preliminary permit be terminated. The permit was issued on August 20, 
    1996, and would have expired on July 31, 1999. The project would have 
    been located on the Connecticut River, near Suffield, Enfield, and 
    Windsor Locks, Connecticut. The permittee states that the proposed 
    project is not economically feasible.
        The permittee filed the request on August 7, 1998, and the 
    preliminary permit for Project No. 11577 shall remain in effect through 
    the thirtieth day after issuance of this notice unless that day is 
    Saturday, Sunday, or holiday as described in 18 CFR 385.2007, in which 
    case the permit shall remain in effect through the first business day 
    following that day. New applications involving this project site, to 
    the extent provided under 18 CFR Part 4, may be filed on the next 
    business day.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-24519 Filed 9-11-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/14/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-24519
Pages:
49117-49117 (1 pages)
Docket Numbers:
Project No. 11577-001
PDF File:
98-24519.pdf