98-24519. Summit Hydropower, Inc.; Notice of Surrender of Preliminary Permit
[Federal Register Volume 63, Number 177 (Monday, September 14, 1998)]
[Notices]
[Page 49117]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-24519]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11577-001]
Summit Hydropower, Inc.; Notice of Surrender of Preliminary
Permit
September 8, 1998.
Take notice that Summit Hydropower, Inc., permittee for the
proposed Windsor Locks Hyrdro Project, has requested that its
preliminary permit be terminated. The permit was issued on August 20,
1996, and would have expired on July 31, 1999. The project would have
been located on the Connecticut River, near Suffield, Enfield, and
Windsor Locks, Connecticut. The permittee states that the proposed
project is not economically feasible.
The permittee filed the request on August 7, 1998, and the
preliminary permit for Project No. 11577 shall remain in effect through
the thirtieth day after issuance of this notice unless that day is
Saturday, Sunday, or holiday as described in 18 CFR 385.2007, in which
case the permit shall remain in effect through the first business day
following that day. New applications involving this project site, to
the extent provided under 18 CFR Part 4, may be filed on the next
business day.
David P. Boergers,
Secretary.
[FR Doc. 98-24519 Filed 9-11-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/14/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-24519
- Pages:
- 49117-49117 (1 pages)
- Docket Numbers:
- Project No. 11577-001
- PDF File:
-
98-24519.pdf