Home »
1998 Issues »
63 FR (09/14/1998) » 98-24606. Approval and Promulgation of Implementation Plans Alabama: Revisions to Several Chapters of the Alabama Department of Environmental Management (ADEM) Administrative Code for the Air Pollution Control Program
98-24606. Approval and Promulgation of Implementation Plans Alabama: Revisions to Several Chapters of the Alabama Department of Environmental Management (ADEM) Administrative Code for the Air Pollution Control Program
[Federal Register Volume 63, Number 177 (Monday, September 14, 1998)]
[Proposed Rules]
[Pages 49058-49059]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-24606]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[AL-047-1 9825b; FRL 6156-8]
Approval and Promulgation of Implementation Plans Alabama:
Revisions to Several Chapters of the Alabama Department of
Environmental Management (ADEM) Administrative Code for the Air
Pollution Control Program
AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) proposes to approve
the State Implementation Plan (SIP) revision submitted by the State of
Alabama through the Department of Environmental Management. On March 5,
1998, the State of Alabama through the Department of Environmental
Management (ADEM) submitted a SIP submittal to revise the ADEM
Administrative Code for the Air Pollution Control Program. Revisions
were made to Chapters 335-3-1, 335-3-12, 335-3-14, and Appendix F. In
the final rules section of this Federal Register, the EPA is approving
Alabama's SIP revision as a direct final rule without prior proposal
because the Agency views this as a noncontroversial revision and
anticipates no adverse comments. A detailed rationale for the approval
is set forth in the direct final rule. If no adverse comments are
received in response to the direct final rule, no further activity is
contemplated in relation to this proposed rule. If EPA receives adverse
comments, the direct final rule will be withdrawn and all public
comments received will be addressed in a subsequent final rule based on
this proposed rule. The EPA will not institute a second comment period
on this rule. Any parties interested in commenting on this rule should
do so at this time.
DATES: To be considered, comments must be received by October 14, 1998.
ADDRESSES: Written comments should be addressed to Kimberly Bingham, at
the EPA Regional Office listed below. The interested persons wanting to
examine these documents should make an appointment with the appropriate
office at least 24 hours before the visiting day. Copies of the
documents relative to this action are available for public inspection
during normal business hours at the following locations.
Air and Radiation Docket and Information Center (Air Docket 6102), U.S.
Environmental Protection Agency, 401 M Street, SW, Washington, DC 20460
U.S. Environmental Protection Agency, Atlanta Federal Center, Region 4,
Air Planning Branch, 61 Forsyth Street, Atlanta, Georgia 30303-3104.
FOR FURTHER INFORMATION CONTACT: Kimberly Bingham of the EPA Region 4,
Air Planning Branch at (404) 562-9038 and at the above address.
SUPPLEMENTARY INFORMATION: For additional information see the direct
final rule which is published in the rules section of this Federal
Register.
[[Page 49059]]
Dated: August 24, 1998.
A. Stan Meiburg,
Acting Regional Administrator, Region 4.
[FR Doc. 98-24606 Filed 9-11-98; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Published:
- 09/14/1998
- Department:
- Environmental Protection Agency
- Entry Type:
- Proposed Rule
- Action:
- Proposed rule.
- Document Number:
- 98-24606
- Dates:
- To be considered, comments must be received by October 14, 1998.
- Pages:
- 49058-49059 (2 pages)
- Docket Numbers:
- AL-047-1 9825b, FRL 6156-8
- PDF File:
-
98-24606.pdf
- CFR: (1)
- 40 CFR 52