01-22842. Application To Export Electric Energy; Exelon Generation Company, LLC  

  • Start Preamble

    AGENCY:

    Office of Fossil Energy, DOE.

    ACTION:

    Notice of application.

    SUMMARY:

    Exelon Generation Company, LLC (Exelon) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.

    DATES:

    Comments, protests or requests to intervene must be submitted on or before October 12, 2001.

    ADDRESSES:

    Comments, protests or requests to intervene should be addressed as follows: Office of Coal & Power Import/Export (FE-27), Office of Fossil Energy, U.S. Department of Energy, 1000 Independence Avenue, SW, Washington, DC 20585-0350 (FAX 202-287-5736).

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rosalind Carter (Program Office) 202-586-7983 or Michael Skinker (Program Attorney) 202-586-2793.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. 824a(e)).

    On August 20, 2001, the Office of Fossil Energy (FE) of the Department of Energy (DOE) received an application from Exelon to transmit electric energy from the United States to Canada. Exelon, a Pennsylvania corporation with its principal place of business in Kennett Square, Pennsylvania, is a power marketer and wholly-owned subsidiary of Exelon Corporation, an electric utility holding company. Exelon owns generation facilities but does not have a franchised service area. The power to be exported will be generated by Exelon or will be purchased from electric utilities, power marketers, and federal power marketing agencies in the United States.

    Exelon proposes to arrange for the delivery of electric energy to Canada over the existing international transmission facilities owned by Basin Electric Power Cooperative, Bonneville Power Administration, Citizen Utilities, Eastern Maine Electric Cooperative, International Transmission Company, Joint Owners of the Highgate Project, Long Sault, Inc., Maine Electric Power Company, Maine Public Service Company, Minnesota Power Inc., Minnkota Power Cooperative, New York Power Authority, Niagara Mohawk Power Corporation, Northern States Power, and Vermont Electric Transmission Company. The construction, operation, maintenance, and connection of each of the international transmission facilities to be utilized by Exelon, as more fully described in the application, has previously been authorized by a Presidential permit issued pursuant to Executive Order 10485, as amended.

    Procedural Matters

    Any person desiring to become a party to this proceeding or to be heard by filing comments or protests to this application should file a petition to intervene, comment or protest at the address provided above in accordance with §§ 385.211 or 385.214 of the FERC's Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above.

    Comments on the Exelon application to export electric energy to Canada should be clearly marked with Docket EA-249. Additional copies are to be filed directly with Majorie R. Philips, Attorney, Exelon Generation Company, LLC, 300 Exelon Way, Kennett Square, PA 19348.

    A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by the DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system.

    Copies of this application will be made available, upon request, for public inspection and copying at the address provided above or by accessing the Fossil Energy Home Page at http://www.fe.de.gov. Upon reaching the Fossil Energy Home page, select “Electricity Start Printed Page 47460Regulation,” and then “Pending Procedures” from the options menus.

    Start Signature

    Issued in Washington, DC, on September 6, 2001.

    Anthony J. Como,

    Deputy Director, Electric Power Regulation, Office of Coal & Power Import/Export, Office of Coal & Power Systems, Office of Fossil Energy.

    End Signature End Supplemental Information

    [FR Doc. 01-22842 Filed 9-11-01; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
09/14/2001
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of application.
Document Number:
01-22842
Dates:
Comments, protests or requests to intervene must be submitted on or before October 12, 2001.
Pages:
47459-47460 (2 pages)
Docket Numbers:
Docket No. EA-249
PDF File:
01-22842.pdf