94-22787. Approval and Promulgation of Implementation Plans Revision to New Source Review, Construction and Operating Permit Requirements, Mississippi  

  • [Federal Register Volume 59, Number 178 (Thursday, September 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-22787]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 15, 1994]
    
    
    -----------------------------------------------------------------------
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    40 CFR Part 52
    
    [MS-16-1-5988b; FRL-5070-5]
    
     
    
    Approval and Promulgation of Implementation Plans Revision to New 
    Source Review, Construction and Operating Permit Requirements, 
    Mississippi
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The EPA proposes to approve the State implementation plan 
    (SIP) revision submitted by the State of Mississippi for the purpose of 
    incorporating the State's changes to regulations for construction of 
    new sources. In the final rules section of this Federal Register, the 
    EPA is approving the State's SIP revision as a direct final rule 
    without prior proposal because the EPA views this as a noncontroversial 
    revision amendment and anticipates no adverse comments. A detailed 
    rational for the approval is set forth in the direct final rule. If no 
    adverse comments are received in response to that direct final rule, no 
    further activity is contemplated in relation to this proposed rule. If 
    EPA receives adverse comments, the direct final rule will be withdrawn 
    and all public comments received will be addressed in a subsequent 
    final rule based on this proposed rule. The EPA will not institute a 
    second comment period on this document. Any parties interested in 
    commenting on this document should do so at this time.
    DATES: To be considered, comments must be received by October 17, 1994.
    
    ADDRESSES: Comments may be mailed to Kimberly Bingham at the EPA Region 
    IV address listed below. Copies of the material submitted by the State 
    of Mississippi may be examined during normal business hours at the 
    following locations:
    
        Air and Radiation Docket and Information Center (Air Docket 6102), 
    US Environmental Protection Agency, 401 M Street, SW., Washington DC 
    20460.
        Environmental Protection Agency, Region IV Air Programs Branch, 345 
    Courtland Street, NE., Atlanta, Georgia 30365.
        Mississippi Department of Environmental Quality, Office of 
    Pollution Control, Air Quality Division, 2380 Highway 80 WestJackson, 
    Mississippi 39289-0385.
    
    FOR FURTHER INFORMATION CONTACT: Kimberly Bingham, Regulatory Planning 
    and Development Section, Air Programs Branch, Stationary Source 
    Planning Unit, Region IV, US Environmental Protection Agency, 345 
    Courtland Street, NE., Atlanta, Georgia 30365, (404) 347-3555 ext. 
    4195.
    
    SUPPLEMENTARY INFORMATION: For additional information see the direct 
    final rule which is published in the rules section of this Federal 
    Register.
    
        Dated: September 1, 1994.
    Joe R. Franzmathes,
    Acting Regional Administrator.
    [FR Doc. 94-22787 Filed 9-14-94; 8:45 am]
    BILLING CODE 6560-50-F
    
    
    

Document Information

Published:
09/15/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Action:
Proposed rule.
Document Number:
94-22787
Dates:
To be considered, comments must be received by October 17, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: September 15, 1994, MS-16-1-5988b, FRL-5070-5
CFR: (1)
40 CFR 52