94-22790. Approval and Promulgation of Air Quality Implementation Plans; Texas; Site Specific Particulate Control Plan for ASARCO, El Paso  

  • [Federal Register Volume 59, Number 178 (Thursday, September 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-22790]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 15, 1994]
    
    
    -----------------------------------------------------------------------
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    40 CFR Part 52
    
    [TX-30-1-6527b; FRL-5069-7]
    
     
    
    Approval and Promulgation of Air Quality Implementation Plans; 
    Texas; Site Specific Particulate Control Plan for ASARCO, El Paso
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The EPA in this action proposes to approve a revision to the 
    Texas State Implementation Plan (SIP) addressing a request for a waiver 
    from certain industrial roadway paving for the ASARCO copper smelter in 
    El Paso, Texas. Specifically, in lieu of paving, this action proposes 
    to approve an alternate particulate control plan for certain industrial 
    unpaved roads at the El Paso ASARCO copper smelter. In the final rules 
    section of this Federal Register, the EPA is approving the State's SIP 
    revision as a direct final rule without prior proposal because the 
    Agency views this as a noncontroversial revision amendment and 
    anticipates no adverse comments. A detailed rationale for the approval 
    is set forth in the direct final rule. If no adverse comments are 
    received in response to this proposed rule, no further activity is 
    contemplated in relation to this rule. If the EPA receives adverse 
    comments, the direct final rule will be withdrawn, and all public 
    comments received will be addressed in a subsequent final rule based on 
    this proposed rule. The EPA will not institute a second comment period 
    on this action. Any parties interested in commenting on this action 
    should do so at this time.
    DATES: Comments on this proposed rule must be received in writing by 
    October 17, 1994.
    
    ADDRESSES: Written comments on this action should be addressed to Mr. 
    Thomas H. Diggs, Chief, Planning Section, at the EPA Regional Office 
    listed below. Copies of the documents relevant to this action are 
    available for public inspection during normal business hours at the 
    following locations. The interested persons wanting to examine these 
    documents should make an appointment with the appropriate office at 
    least twenty-four hours before the visiting day.
        U.S. Environmental Protection Agency, Region 6, Air Programs Branch 
    (6T-A), 1445 Ross Avenue, suite 700, Dallas, Texas 75202.Texas Natural 
    Resource Conservation Commission, P.O. Box 13087,Austin, Texas 78711-
    3087.
    
    FOR FURTHER INFORMATION CONTACT: Mr. Mark Sather, Planning Section (6T-
    AP), Air Programs Branch, USEPA Region 6, 1445 Ross Avenue, Dallas, 
    Texas 75202-2733, telephone (214) 655-7258.
    
    SUPPLEMENTARY INFORMATION:
        See the information provided in the direct final action of the same 
    title which is located in the final rules section of this Federal 
    Register.
    
        Dated: August 26, 1994.
    W.B. Hathaway,
    Acting Regional Administrator (6A).
    [FR Doc. 94-22790 Filed 9-14-94; 8:45 am]
    BILLING CODE 6560-50-F
    
    
    

Document Information

Published:
09/15/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Action:
Proposed rule.
Document Number:
94-22790
Dates:
Comments on this proposed rule must be received in writing by October 17, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: September 15, 1994, TX-30-1-6527b, FRL-5069-7
CFR: (1)
40 CFR 52