94-22800. LSP-Whitewater Limited Partnership; Application for Commission Certification of Qualifying Status of a Cogeneration Facility  

  • [Federal Register Volume 59, Number 178 (Thursday, September 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-22800]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 15, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. QF94-155-000]
    
     
    
    LSP-Whitewater Limited Partnership; Application for Commission 
    Certification of Qualifying Status of a Cogeneration Facility
    
    September 9, 1994.
        On September 6, 1994 LSP-Whitewater Limited Partnership of 101 East 
    Main Street, Bozeman, Montana 59715, submitted for filing an 
    application for certification of a facility as a qualifying 
    cogeneration facility pursuant to Sec. 292.207(b) of the Commission's 
    Regulations. No determination has been made that the submittal 
    constitutes a complete filing.
        According to the applicant, the cogeneration facility will be 
    located in the City of Whitewater, in Jefferson County, Wisconsin. The 
    facility will consist of a combustion turbine generator, a heat 
    recovery boiler and an extraction/condensing steam turbine generator. 
    Steam recovered from the facility will be used by the University of 
    Wisconsin-Whitewater Campus for campus heating and cooling and sending 
    hot water to a new greenhouse to be constructed adjacent to the 
    facility. The maximum net power production capacity of the facility 
    will be 248.5 MW. The primary energy source will be natural gas. 
    Construction of the facility is expected to commence on January 1, 
    1995.
        Any person desiring to be heard or objecting to the granting of 
    qualifying status should file a motion to intervene or protest with the 
    Federal Energy Regulatory Commission, 825 North Capitol Street, N.E., 
    Washington, DC 20426, in accordance with rules 211 and 214 of the 
    Commission's Rules of Practice and Procedure. All such motions or 
    protests must be filed within 30 days after the date of publication of 
    this notice in the Federal Register and must be served on the 
    applicant. Protests will be considered by the Commission in determining 
    the appropriate action to be taken but will not serve to make 
    protestants parties to the proceeding. Any person wishing to become a 
    party must file a petition to intervene. Copies of this filing are on 
    file with the Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-22800 Filed 9-14-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/15/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-22800
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: September 15, 1994, Docket No. QF94-155-000