Home »
1994 Issues »
59 FR (09/15/1994) » 94-22800. LSP-Whitewater Limited Partnership; Application for Commission Certification of Qualifying Status of a Cogeneration Facility
94-22800. LSP-Whitewater Limited Partnership; Application for Commission Certification of Qualifying Status of a Cogeneration Facility
[Federal Register Volume 59, Number 178 (Thursday, September 15, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-22800]
[[Page Unknown]]
[Federal Register: September 15, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. QF94-155-000]
LSP-Whitewater Limited Partnership; Application for Commission
Certification of Qualifying Status of a Cogeneration Facility
September 9, 1994.
On September 6, 1994 LSP-Whitewater Limited Partnership of 101 East
Main Street, Bozeman, Montana 59715, submitted for filing an
application for certification of a facility as a qualifying
cogeneration facility pursuant to Sec. 292.207(b) of the Commission's
Regulations. No determination has been made that the submittal
constitutes a complete filing.
According to the applicant, the cogeneration facility will be
located in the City of Whitewater, in Jefferson County, Wisconsin. The
facility will consist of a combustion turbine generator, a heat
recovery boiler and an extraction/condensing steam turbine generator.
Steam recovered from the facility will be used by the University of
Wisconsin-Whitewater Campus for campus heating and cooling and sending
hot water to a new greenhouse to be constructed adjacent to the
facility. The maximum net power production capacity of the facility
will be 248.5 MW. The primary energy source will be natural gas.
Construction of the facility is expected to commence on January 1,
1995.
Any person desiring to be heard or objecting to the granting of
qualifying status should file a motion to intervene or protest with the
Federal Energy Regulatory Commission, 825 North Capitol Street, N.E.,
Washington, DC 20426, in accordance with rules 211 and 214 of the
Commission's Rules of Practice and Procedure. All such motions or
protests must be filed within 30 days after the date of publication of
this notice in the Federal Register and must be served on the
applicant. Protests will be considered by the Commission in determining
the appropriate action to be taken but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a petition to intervene. Copies of this filing are on
file with the Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-22800 Filed 9-14-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/15/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-22800
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: September 15, 1994, Docket No. QF94-155-000