94-22835. Intent To Prepare an Environmental Impact Statement for a Proposed Flood Control Project at Wailupe Valley, Honolulu, HI  

  • [Federal Register Volume 59, Number 178 (Thursday, September 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-22835]
    
    
    [[Page Unknown]]
    
    [Federal Register: September 15, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    Department of the Army, Corps of Engineers
    
     
    
    Intent To Prepare an Environmental Impact Statement for a 
    Proposed Flood Control Project at Wailupe Valley, Honolulu, HI
    
    AGENCY: U.S. Army Corps of Engineers, DOD.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The U.S. Army Corps of Engineers, Honolulu District, in 
    partnership with the State of Hawaii, Department of Land and Natural 
    Resources, and the City and County of Honolulu Department of Public 
    Works, is proposing to develop solutions to the flooding problem caused 
    by Wailupe Stream. Wailupe Stream is located on the east side of the 
    island of Oahu in the community of Aina Haina. The completed project is 
    expected to significantly reduce future flood damage.
    
    ADDRESSES: U.S. Army Engineer District, Honolulu, ATTN: CEPOD-ED-PV, 
    Fort Shafter, Hawaii 96858-5440.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. Peter Galloway, (808) 438-8876.
    
    SUPPLEMENTARY INFORMATION:
    
        1. The project may include the following items:
        a. One or more debris dams located upstream of the existing boulder 
    basin in Wailupe Gulch.
        b. One or more debris dams located upstream of the entrance to 
    Kului Gulch.
        c. Channel improvements up to 7,000 feet long.
        These features may be modified, or new features added as a result 
    of the analysis to be performed as part of the feasibility/EIS process.
        2. Alternatives to be considered include ``No Action'' and various 
    alternative alignments and configurations of the debris dams and 
    channel improvements.
        3. At the request of the State of Hawaii Legislature following the 
    New Year's Eve Flood of 1987-1988, the Corps conducted a reconnaissance 
    study beginning in 1990 entitled ``Urban Flood Control Study''. The 
    study found basic problems in the Wailupe Stream draining basin and 
    determined that there was a federal interest in solving the debris flow 
    and flooding problems.
        4. A public scoping meeting to be held in Honolulu is being planned 
    for September or October 1994, but no date has yet been set. The draft 
    EIS is expected to be available in September 1996.
    Kenneth L. Denton,
    Army Federal Register Liaison Officer.
    [FR Doc. 94-22835 Filed 9-14-94; 8:45 am]
    BILLING CODE 3710-08-M
    
    
    

Document Information

Published:
09/15/1994
Department:
Engineers Corps
Entry Type:
Uncategorized Document
Action:
Notice of intent.
Document Number:
94-22835
Pages:
0-0 (1 pages)
Docket Numbers: