98-24671. Columbia Gas Transmission Corporation; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 178 (Tuesday, September 15, 1998)]
[Notices]
[Page 49344]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-24671]
[[Page 49344]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-758-000]
Columbia Gas Transmission Corporation; Notice of Request Under
Blanket Authorization
September 9, 1998.
Take notice that on September 2, 1998, Columbia Gas Transmission
Corporation (Columbia Gas), 12801 Fair Lakes Parkway, Fairfax, Virginia
22030-1046, filed in Docket No. CP98-758-000 a request pursuant to
Sections 157.205 and 157.216 of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205 and 157.216) for authorization to
abandon approximately 0.01 mile of 2-inch transmission Line 10038 and
appurtenances, and one point of delivery to Columbia Gas of
Pennsylvania, Inc. (CPA), all located in Washington County,
Pennsylvania. Columbia Gas makes such request under its blanket
certificate issued in Docket No. CP83-776-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request on file
with the Commission on open to public inspection.
Columbia Gas states that it was authorized to own and operate the
facilities proposed to the abandoned in this proceeding in Docket No.
CP71-132-000. It is indicated that the subject facilities have not been
used to provide service to CPA for more than ten years. By letter dated
August 10, 1998, CPA advised Columbia Gas it no longer has use for
Columbia Gas' Bethlehem Mines, Moore Shaft Measuring Station No.
601046, located in Marianna, Pennsylvania. Columbia Gas is therefore,
proposing to abandon the subject facilities herein.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of the intervention and pursuant to Section 157.205
of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefor, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 98-24671 Filed 9-14-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/15/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-24671
- Pages:
- 49344-49344 (1 pages)
- Docket Numbers:
- Docket No. CP98-758-000
- PDF File:
-
98-24671.pdf