98-24682. Destin Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 178 (Tuesday, September 15, 1998)]
    [Notices]
    [Page 49344]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-24682]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-757-000]
    
    
    Destin Pipeline Company, L.L.C.; Notice of Request Under Blanket 
    Authorization
    
    September 10, 1998.
        Take notice that on September 2, 1998, Destin Pipeline Company, 
    L.L.C. (Applicant), Post Office Box 2563, Birmingham, Alabama, 35202-
    2563, filed in Docket No. CP98-757-000 a request pursuant to Sections 
    157.205 and 157.211 of the Commission's Regulations under the Natural 
    Gas Act (18 CFR 157.205 and 157.211) for approval to construct, own, 
    and operate certain facilities located in Jackson County, Mississippi, 
    for the delivery of natural gas to Chevron Products Company (Chevron 
    Products) under Applicant's blanket certificate issued in Docket No. 
    CP96-657-000 and CP96-657-001, pursuant to Section 7(C) of the Natural 
    Gas Act (NGA), all as more fully set forth in the request which is on 
    file with the Commission and open to public inspection.
        Applicant proposes to construct and operate a meter station 
    consisting of three ten-inch orifice meters and appurtenant facilities, 
    including 3.38 miles of sixteen-inch pipeline extending from a point at 
    or near Mile Post 79.8 on Applicant's thirty-six-inch mainline to an 
    interconnection with the proposed meter station, electronic custody 
    transfer equipment, pressure control regulation equipment, and other 
    rappurtenant facilities. Applicant sates that it will own and operate 
    the proposed facilities as part of its pipeline system. It is further 
    stated that the total estimated cost of the facilities proposed herein 
    is $3.5 Million, which cost will be 100 percent borne by Applicant. 
    Applicant asserts that it will provide transportation service of 10,000 
    Mcf per Day to Chevron Products under Applicant's Rate Schedule FT-1 
    and that additional volumes of natural gas may be transported to the 
    proposed new delivery point from time to time on behalf of Chevron 
    Products on an interruptible basis pursuant to Applicant's Rate 
    Schedule IT. Applicant further asserts that the performance of the 
    transportation services for Chevron Products will have no adverse 
    impact on Applicant's peak day capabilities and annual deliveries.
        Any person or the Commission's Staff may, within 45 days of the 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214), a motion to intervene and pursuant to Section 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activities shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn 30 days after the time allowed for filing a protest, the 
    instant request shall be treated as an application for authorization 
    pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-24682 Filed 9-14-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/15/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-24682
Pages:
49344-49344 (1 pages)
Docket Numbers:
Docket No. CP98-757-000
PDF File:
98-24682.pdf