98-24684. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 178 (Tuesday, September 15, 1998)]
    [Notices]
    [Page 49343]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-24684]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-764-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    September 10, 1998.
        Take notice that on September 4, 1998, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP98-764-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.211) for authorization to operate under the provisions of Section 
    7(c) of the Natural Gas Act (NGA) an existing interconnection in Texas 
    County, Oklahoma, that has been constructed pursuant to Section 311 of 
    the Natural Gas Policy Act of 1978 (NGPA), all as more fully set forth 
    in the request that is on file with the Commission and open to public 
    inspection.
        Pursuant to Section 311 of the NGPA, ANR constructed an 
    interconnection to the facilities of Hitch Enterprises, Inc., 
    facilities consisted of a 2-inch turbine meter, a 2-inch insulating 
    flange, a 4-inch tap valve, and an electronic measurement system. The 
    cost of the facilities was approximately $64,000, which was fully 
    reimbursed by Hitch. ANR delivers natural gas at this interconnection 
    under rate Schedule ITS of its FERC Gas Tariff, Second Revised Volume 
    No. 1.
        ANR states that the construction of the proposed interconnection 
    facilities will have no effect on its peak day and annual deliveries, 
    that its existing tariff does not prohibit additional interconnections, 
    that deliveries will be accomplished without detriment or disadvantage 
    to its other customers and that the total volumes delivered will not 
    exceed total volumes authorized prior to this request.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-24684 Filed 9-14-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/15/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-24684
Pages:
49343-49343 (1 pages)
Docket Numbers:
Docket No. CP98-764-000
PDF File:
98-24684.pdf