[Federal Register Volume 63, Number 178 (Tuesday, September 15, 1998)]
[Notices]
[Page 49343]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-24684]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-764-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
September 10, 1998.
Take notice that on September 4, 1998, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No.
CP98-764-000 a request pursuant to Sections 157.205 and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.211) for authorization to operate under the provisions of Section
7(c) of the Natural Gas Act (NGA) an existing interconnection in Texas
County, Oklahoma, that has been constructed pursuant to Section 311 of
the Natural Gas Policy Act of 1978 (NGPA), all as more fully set forth
in the request that is on file with the Commission and open to public
inspection.
Pursuant to Section 311 of the NGPA, ANR constructed an
interconnection to the facilities of Hitch Enterprises, Inc.,
facilities consisted of a 2-inch turbine meter, a 2-inch insulating
flange, a 4-inch tap valve, and an electronic measurement system. The
cost of the facilities was approximately $64,000, which was fully
reimbursed by Hitch. ANR delivers natural gas at this interconnection
under rate Schedule ITS of its FERC Gas Tariff, Second Revised Volume
No. 1.
ANR states that the construction of the proposed interconnection
facilities will have no effect on its peak day and annual deliveries,
that its existing tariff does not prohibit additional interconnections,
that deliveries will be accomplished without detriment or disadvantage
to its other customers and that the total volumes delivered will not
exceed total volumes authorized prior to this request.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 98-24684 Filed 9-14-98; 8:45 am]
BILLING CODE 6717-01-M