98-24705. Drawbridge Operation Regulation; Green River  

  • [Federal Register Volume 63, Number 178 (Tuesday, September 15, 1998)]
    [Rules and Regulations]
    [Pages 49286-49287]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-24705]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD 08-98-041]
    
    
    Drawbridge Operation Regulation; Green River
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Eighth Coast Guard District has issued a 
    temporary deviation from the regulation governing the operation of the 
    Paducah & Louisville Railroad Bridge at Mile 94.8, across the Green 
    River. This deviation amends the federal drawbridge operation 
    regulations to allow the drawbridge to remain closed from September 1, 
    1998 through October 30, 1998 during planned repair periods. The 
    planned repairs include replacement of the bridge's lift motors.
    
    [[Page 49287]]
    
    The repairs will take approximately five days, however the exact dates 
    are unknown at this time due to river conditions and material delivery 
    matters.
    
    DATES: The deviation is effective from September 1, 1998 through 
    October 30, 1998.
    
    ADDRESSES: Documents associated with this action are available for 
    review at the office of Director Western Rivers Operations (ob) Eighth 
    Coast Guard District, 1222 Spruce Street, St. Louis, MO 63103, Room 
    2.107F between 8 a.m. and 4 p.m., Monday through Friday, except Federal 
    holidays.
    
    FOR FURTHER INFORMATION CONTACT:
    Roger K. Wiebusch, Bridge Administrator, Eighth Coast Guard District, 
    314-539-3900, Ext. 378.
    
    SUPPLEMENTARY INFORMATION: The Paducah & Louisville Railroad Bridge is 
    a bascule bridge that provides a vertical clearance of 41.3 feet above 
    normal pool in the closed-to-navigation position. Navigation on the 
    waterway consists of commercial tows and recreational watercraft. This 
    change in drawbridge operation has been coordinated with the commercial 
    waterway industry and fleeting operations in the area. During normal 
    river stages most vessels are able to pass beneath the closed span. In 
    order to replace the lift motors, the moveable bascule leaf must be 
    maintained in the closed to navigation position. Since the river level 
    during September is at or near pool stage the closure is not expected 
    to prevent vessels from passing beneath the closed span. If the river 
    level is above normal pool, the bridge repair will be postponed until 
    normal pool level is reached.
        This deviation is for a planned repair period sometime in September 
    or October 1998. The bridge will open on demand except during the 
    approximately 5 day repair period when work will be in progress. The 
    exact dates for this period could not be determined due to the 
    uncertainty of when materials will be delivered. A minimum of two weeks 
    advance notice will be provided to the Coast Guard prior to start of 
    work so that appropriate notification to mariners can be made. The 
    actual dates for the drawbridge closure will be published in the Local 
    Notice to Mariners and included in the Broadcast Notice to Mainers. 
    Interested parties may contact the Roger K. Wiebusch, DWRO Bridge 
    Branch at 314-539-3900 ext. 3 between 8:00 a.m. and 4:00 p.m., Monday 
    through Friday for dates of closure. The drawbridge operation 
    regulations, when not amended by a deviation, require that the 
    drawbridge open-on-demand.
        A temporary deviation from the normal operation of the bridge was 
    requested in order to perform necessary maintenance work on the bridge. 
    The work consists of replacing the bridge's lift motors. The repairs 
    are essential to the continued safe operation of the drawbridge.
        The District Commander has, therefore, issued a deviation from the 
    regulations in 33 CFR 117.5 authorizing the Paducah & Louisville 
    Railroad Bridge across the Green River to remain in the closed to 
    navigation position during planned repair periods occurring between 
    September 1, 1998 and October 30, 1998.
    
        Dated: August 21, 1998.
    Paul J. Pluta,
    Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
    [FR Doc. 98-24705 Filed 9-14-98; 8:45 am]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
9/1/1998
Published:
09/15/1998
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
98-24705
Dates:
The deviation is effective from September 1, 1998 through October 30, 1998.
Pages:
49286-49287 (2 pages)
Docket Numbers:
CGD 08-98-041
PDF File:
98-24705.pdf
CFR: (1)
33 CFR 117