[Federal Register Volume 64, Number 178 (Wednesday, September 15, 1999)]
[Notices]
[Pages 50114-50115]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-24054]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Public Stakeholder Meeting Concerning the Revision of the Safety
Inspection Program for Nuclear Fuel Cycle Facilities
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: The NRC published a meeting notice in the Federal Register on
September 9, 1999 (64 FR 49031). The location of that meeting has been
changed to the NRC's Commissioner's Hearing Room (see ADDRESSES
section). The meeting is necessary to provide the public, those
regulated by the NRC, and other stakeholders, with information about
and an opportunity to provide views on how NRC plans to revise its
safety inspection program for nuclear fuel cycle facilities. Similar to
the revisions of the inspection and oversight program for commercial
nuclear power plants, NRC has initiated an effort to
[[Page 50115]]
improve its programs for nuclear fuel cycle facilities. This is
described in SECY-99-188 titled, Evaluation and Proposed Revision of
the Nuclear Fuel Cycle Facility Safety Inspection Program. SECY-99-188
is available in the Public Document Room and on the NRC Web Page at
http://www.nrc.gov/NRC/COMMISSION/SECYS/index.html.
PURPOSE: To explain the planned revision of the fuel cycle safety
inspection program and obtain stakeholder's views. The baseline safety
inspection program applies to nuclear fuel cycle facilities regulated
under 10 CFR parts 40, 70 and 76. The facilities currently include
gaseous diffusion plants, highly enriched uranium fuel fabrication
facilities, low-enriched uranium fuel fabrication facilities, and a
uranium hexafluoride (UF6) production facility. These
facilities possess large quantities of materials that are potentially
hazardous (i.e., radioactive, toxic, and/or flammable) to the workers,
public, or environment. In revising the inspection program, the goals
are to have an inspection program that: (1) Provides earlier and more
objective indications of acceptable and changing safety performance,
(2) increases stakeholder confidence in the NRC, and (3) increases
regulatory effectiveness and efficiency. In this regard, the NRC
desires the revised inspection program to be more risk-informed and
performance-based and more focused on significant risks. Where
practicable, the program will use more objective safety performance
indicators (PIs) with accompanying performance thresholds.
DATES: This meeting is scheduled for Thursday, September 16, 1999, from
9 am to 4 pm and is open to the public.
ADDRESSES: NRC's Commissioner's Hearing Room, 1st Floor, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland. Visitor parking
around the NRC building is limited; however, the meeting site is
located adjacent to the White Flint Station on the Metro Red Line.
FOR FURTHER INFORMATION CONTACT: Walter Schwink, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555, telephone (301) 415-7253, e-mail wss@nrc.gov.
Dated at Rockville, Maryland this 2nd day of September, 1999.
For the Nuclear Regulatory Commission.
Philip Ting,
Chief, Operations Branch, Division of Fuel Cycle Safety and Safeguards.
[FR Doc. 99-24054 Filed 9-14-99; 8:45 am]
BILLING CODE 7590-01-P