97-24451. Texas Gas Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 179 (Tuesday, September 16, 1997)]
    [Notices]
    [Page 48641]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-24451]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-727-000]
    
    
    Texas Gas Transmission Corporation; Notice of Request Under 
    Blanket Authorization
    
    September 10, 1997.
        Take notice that on September 5, 1997, Texas Gas Transmission 
    Corporation (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 
    42301, filed in Docket No. CP97-727-000 a request pursuant to 
    Secs. 157.205 and 157.211 of the Commission's Regulations under the 
    Natural Gas act (18 CFR 157.205, 157.211) for approval to operate an 
    existing previously installed pursuant to the authority of Section 311 
    of the Natural Gas Policy Act of 1978 (Section 311) and Section 
    284.3(c) of the Commission's Regulations in May 1985, under Texas Gas' 
    blanket certificate issued in Docket No. CP88-686-000, pursuant to 
    Section 7(c) of the Natural Gas Act (NGA), all as more fully set forth 
    in the request which is on file with the Commission and open to public 
    inspection.
        Texas Gas proposes to operate the LGS-Bayou Pigeon Delivery Meter 
    located in Iberia Parish, Louisiana, under blanket authorization for 
    Texas Petroleum Investment Company (Texas Petroleum). It is asserted 
    that Texas Petroleum is now the owner of the production facilities at 
    this location and has requested that Texas Gas file for authority to 
    make deliveries of natural gas under blanket authorization at this 
    point. Texas Gas further asserts that Texas Petroleum has requested up 
    to 50 MMBtu per day of interruptible transportation to be used as gas 
    lift gas for Texas Petroleum's operations.
        Any person or the Commission's Staff may, within 45 days of the 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214), a motion to intervene and pursuant to Sec. 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205), a protest to 
    the request. If no protest is filed within the time allowed therefore, 
    the proposed activities shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn 30 days after the time allowed for filing a protest, 
    the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-24451 Filed 9-15-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
09/16/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-24451
Pages:
48641-48641 (1 pages)
Docket Numbers:
Docket No. CP97-727-000
PDF File:
97-24451.pdf