Take notice that on September 1, 1999, Colorado Interstate Gas
Company (CIG), P.O. Box 1087, Colorado Springs, Colorado 80944, filed
in Docket No. CP99-611-000 a request pursuant to Sections 157.205 and
157.208 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205 and 157.208) and CIG's blanket certificate issued in Docket
No. CP83-21-000 pursuant to Section 7 of the Natural Gas Act, for
authorization to increase the Maximum Allowable Operating Pressure
(MAOP) at the Weld County KN and Carpenter-Burns Meter Stations, in
Colorado and all as more fully set forth in the request that is on file
with the Commission and open to public inspection. The application may
be viewed on the web at www.ferc.fed.us. Call (202) 208-2222 for
assistance.
CIG states that the Carpenter-Burns and Weld County KN Meter
Stations are both on CIG's 15A Lateral that extends east from the
Cheyenne Compressor Station approximately 39 miles. CIG further states
the MAOP of the lateral is 847 psig, the MAOP of the Carpenter-Burns
Meter Station downstream of regulators is 400 psig and the MAOP of the
Weld County KN Meter Station downstream of regulators is 718 psig.
Since the delivery obligation at the Carpenter-Burns Meter Station is
400 psig, CIG proposes to increase the MAOP of the meter station to 520
psig so CIG can meet this delivery obligation without violation of the
MAOP
[[Page 50279]]
limitation. To accomplish this, CIG proposes to change the regulators
and gas test the facilities downstream of these regulators. The
Carpenter-Burns Meter Station delivers gas to Cheyenne Light Fuel and
Power Co.
CIG states that the Weld County KN Meter Station is at the end of
the 15A Lateral and delivers gas to KN Interstate Gas Transmission
Company (KN). CIG further states that there are regulators between the
lateral and the meter station that protects the meter station from the
higher MAOP. However, when KN shuts off deliveries from this meter, a
situation occurs where it is possible to exceed the MAOP of the
metering facilities. To fix this situation, CIG is proposing to replace
valving, meter tubes, and some piping, all within the Weld County KN
Meter Station Yard to increase the MAOP of the metering facility to 891
psig. This will eliminate operational problems associated with the MAOP
limitation at this metering station.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If not protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-24112 Filed 9-15-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 09/16/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-24112
- Pages:
- 50278-50279 (2 pages)
- Docket Numbers:
- Docket No. CP99-611-000
- PDF File:
-
99-24112.pdf