[Federal Register Volume 64, Number 180 (Friday, September 17, 1999)]
[Notices]
[Pages 50502-50506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-24212]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL99-46-001, et al.]
Capacity Benefit Margin, et al.; Electric Rate and Corporate
Regulation Filings
September 10, 1999.
Take notice that the following filings have been made with the
Commission:
1. Capacity Benefit Margin
[Docket No. EL99-46-001]
Take notice that on August 12, 1999, North American Electric
Reliability filed a response to the Commission's Order on Capacity
Benefit Margin that was issued on July 28, 1999 in Docket No. EL99-46-
000.
Comment date: October 1, 1999, in accordance with Standard
Paragraph E at the end of this notice.
2. Vitol Gas & Electric LLC
[Docket No. ER94-155-026]
Take notice that on September 9, 1999, the above-mentioned power
marketer filed a quarterly report with the Commission in the above-
mentioned proceeding for information only. This filing is available for
public inspection and copying in the Public Reference Room or on the
web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
3. Stand Energy Corporation, Environmental Resources Trust, Inc.
and Mid-Power Service Corporation
[Docket No. ER95-362-018, ER98-3233-004 and ER97-4257-010]
Take notice that on September 7, 1999, the above-mentioned power
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only. These filings are available
for public inspection and copying in the Public Reference Room or on
the web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
4. Wilson Power & Gas Smart, Inc.
[Docket No. ER95-751-019]
Take notice that on September 2, 1999, the above-mentioned power
marketer filed a quarterly report with the Commission in the above-
mentioned proceeding for information only. This filing is available for
public inspection and copying in the Public Reference Room or on the
web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
5. GDK
[Docket No. ER96-1735-012]
Take notice that on September 1, 1999, the above-mentioned power
marketer filed a quarterly report with the Commission in the above-
mentioned proceeding for information only. This filing is available for
public inspection and copying in the Public Reference Room or on the
web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
6. United American Energy Corporation
[Docket Nos. ER96-3092-013 and ER99-4360-000]
Take notice that on September 1, 1999, United American Energy Corp.
(UAE), tendered for filing a Notification of Change in Status. UAE
seeks to notify the Commission that it has become affiliated with Duke
Energy Corporation (Duke Energy). Due to its new affiliation with Duke
Energy, UAE is submitting for filing with the Commission an amended
Rate Schedule No. 1 as well as a Code of Conduct (Supplement No. 1 to
Rate Schedule No. 1).
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
7. Allegheny Power Service Corporation, Cleveland Electric
Illuminating Company, Toledo Edison Company, Ohio Edison Company,
Pennsylvania Power Company, Southern Company Services, Inc.,
Virginia Electric & Power Company and Ontario Hydro
[Docket No. ER97-697-003]
Take notice that on September 2, 1999, Allegheny Power Service
Corporation, Cleveland Electric Illuminating Company, Toledo Edison
Company, Ohio Edison Company, Pennsylvania Power Company, Southern
Company Services, Inc., Virginia Electric & Power Company, and Ontario
Hydro tendered for filing a Final Report on the GAPP Experiment which
was initiated on April 2, 1997.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, and the West Virginia Public Service Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
8. PSEG Energy Technologies Incorporated
[Docket No. ER97-2176-010]
Take notice that on September 8, 1999, the above-mentioned power
marketer filed a quarterly report with the Commission in the above-
mentioned proceeding for information only. This filing is available for
public inspection and copying in the Public Reference Room or on the
web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
9. Northeast Electricity Inc.
[Docket No. ER98-3048-002]
Take notice that on August 23, 1999, the above-mentioned power
marketer filed a quarterly report with the Commission in the above-
mentioned proceeding for information only. This filing is available for
public inspection and copying in the Public Reference Room or on the
web at www.ferc.fed.us/online/rims.htm for viewing and downloading
(call 202-208-2222 for assistance).
[[Page 50503]]
10. Virginia Electric and Power Company
[Docket No. ER99-1886-000]
Take notice that on September 2, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing pursuant to Section 205
of the Federal Power Act, 16 U.S.C. Section 824d, an amendment to its
February 22, 1999 and April 20, 1999 filings in the above referenced
docket number. Virginia Power's filings pertain to a Service Agreement
under the Company's Open Access Transmission Tariff with The Wholesale
Power Group for Long Term Firm Point-to-Point Transmission Service.
Copies of this filing were served upon The Wholesale Power Group,
the Virginia State Corporation Commission and the North Carolina
Utilities Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
11. New England Power Pool
[Docket No. ER99-4330-000]
Take notice that on September 1, 1999, the New England Power Pool
Participants Committee submitted the Forty-Fourth Agreement Amending
New England Power Pool Agreement, which modifies the formula in the
Restated NEPOOL Agreement that determines Installed Capability
Responsibility in Section 12.2(a)(1) of the Restated NEPOOL Agreement
to more accurately account for the reliability value for NEPOOL
Interruptible and Dispatchable Loads.
The NEPOOL Participants Committee states that copies of these
materials were sent to the New England state governors and regulatory
commissions and the Participants in the New England Power Pool.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
12. Southwestern Public Service Company
[Docket No. ER99-4331-000]
Take notice that on September 1, 1999, New Century Services, Inc.,
on behalf of Southwestern Public Service Company (Southwestern),
tendered for filing an executed umbrella service agreement under
Southwestern's market-based sales tariff with Public Service Company of
New Mexico (PNM). This umbrella service agreement provides for
Southwestern's sale and PNM's purchase of capacity and energy at
market-based rates pursuant to Southwestern's market-based sales
tariff.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
13. Niagara Mohawk Power Corporation
[Docket No. ER99-4332-000]
Take notice that on September 1, 1999, Niagara Mohawk Power
Corporation (NMPC), tendered for filing with the Federal Energy
Regulatory Commission an executed form Service Agreement between NMPC
and NRG Power Marketing, Inc. (Purchaser). The Service Agreement
specifies that the Purchaser has signed and agreed to the terms and
conditions of NMPC's Power Sales Tariff designated as NMPC's FERC
Electric Tariff, Original Volume No. 2. This Tariff, approved by FERC
on April 15, 1994, and having an effective date of March 13, 1993,
allows NMPC and the Purchaser to enter into separately scheduled
transactions under which NMPC will sell to the Purchaser capacity and/
or energy as the parties may mutually agree. In its filing letter, NMPC
also included a Certificate of Concurrence from the Purchaser.
NMPC is: (a) requesting an effective date of September 1, 1999 for
the agreement, and (b) requesting waiver of the Commission's notice
requirements for good cause shown.
NMPC has served copies of the filing upon the New York State Public
Service Commission and the companies included in a Service List
enclosed with the filing.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
14. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4333-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Public Service Electric & Gas Company (PSE&G).
Con Edison states that a copy of this filing has been served by
mail upon PSE&G.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
15. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4334-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Public Service Electric & Gas Company (PSE&G).
Con Edison states that a copy of this filing has been served by
mail upon PSE&G.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
16. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4335-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Public Service Electric & Gas Company (PSE&G).
Con Edison states that a copy of this filing has been served by
mail upon PSE&G.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
17. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4336-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Public Service Electric & Gas Company (PSE&G).
Con Edison states that a copy of this filing has been served by
mail upon PSE&G.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
18. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4337-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Public Service Electric & Gas Company (PSE&G).
Con Edison states that a copy of this filing has been served by
mail upon PSE&G.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 50504]]
19. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4338-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Constellation Power Source (CPS).
Con Edison states that a copy of this filing has been served by
mail upon CPS.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
20. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4340-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Con Edison Solutions (CES).
Con Edison states that a copy of this filing has been served by
mail upon CES.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
21. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4341-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Con Edison Solutions (CES).
Con Edison states that a copy of this filing has been served by
mail upon CES.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
22. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4342-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Con Edison Solutions (Solutions).
Con Edison states that a copy of this filing has been served by
mail upon Solutions.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
23. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4343-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Con Edison Solutions (Solutions).
Con Edison states that a copy of this filing has been served by
mail upon Solutions.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
24. Consolidated Edison Company of New York, Inc.
[Docket No. ER99-4344-000]
Take notice that on September 1, 1999, Consolidated Edison Company
of New York, Inc. (Con Edison), tendered for filing a service agreement
to provide firm transmission service pursuant to its Open Access
Transmission Tariff to Aquila Power Corporation (APC).
Con Edison states that a copy of this filing has been served by
mail upon APC.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
25. Consumers Energy Company
[Docket No. ER99-4345-000]
Take notice that on September 1, 1999, Consumers Energy Company
(Consumers), tendered for filing an executed service agreement for
unbundled wholesale power service with American Electric Power Service
Corporation pursuant to Consumers' Market Based Power Sales Tariff
accepted for filing in Docket No. ER98-4421-000 .
The service agreement has an effective date of July 27, 1999.
Copies of the filing have been served on the Michigan Public
Service Commission and American Electric Power Service Corporation.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
26. Virginia Electric and Power Company
[Docket No. ER99-4346-000]
Take notice that on September 1, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing its proposed modification
to Section 14.7 of the Open Access Transmission Tariff, that modifies
the charge to a transmission customer that fails to curtail a non-firm
point-to-point transmission transaction within ten minutes of
notification by the Company. Virginia Power seeks to recover any costs
that are incurred to meet NERC contingency reserve requirements.
Virginia Power requests waiver of the Commission's notice
requirements to permit an effective date of September 10, 1999. If
waiver is not granted, Virginia Power requests that the filing become
effective sixty days from the date of this letter.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
27. Virginia Electric and Power Company
[Docket No. ER99-4347-000]
Take notice that on September 1, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing a Notice of Cancellation
of the following Service Agreements:
1. Service Agreement between Virginia Electric and Power Company
and Cleveland Electric Illuminating Company (Cleveland Electric) for
Non-Firm Point-to-Point Transmission Service;
2. Service Agreement between Virginia Electric and Power Company
and Toledo Edison Company (Toledo Edison) for Non-Firm Point-to-Point
Transmission Service.
The above referenced Service Agreements were dated December 16,
1996 and were filed under the Company's Open Access Transmission Tariff
to Eligible Purchasers dated July 9, 1996. These agreements were
accepted by the FERC under Docket No. ER97-1461-000 in a letter order
dated March 6, 1997. In light of the formation of FirstEnergy Corp.
(FirstEnergy), an exempt holding company which owns all of the common
stock of The Cleveland Electric Illuminating Company and The Toledo
Edison Company, FirstEnergy directed Virginia Power to cancel the above
referenced Service Agreements.
Virginia Power requests an effective date of November 2, 1999, for
the cancellation of the above referenced Service Agreements.
Copies of this filing were served upon FirstEnergy, the Virginia
State Corporation Commission and the North Carolina Utilities
Commission.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
28. Virginia Electric and Power Company
[Docket No. ER99-4348-000]
Take notice that on September 1, 1999, Virginia Electric and Power
[[Page 50505]]
Company (Virginia Power), tendered for filing an assignment letter
indicating that FirstEnergy Corp. (FirstEnergy), will replace Ohio
Edison Company as transmission customer in the Non-Firm Point-to-Point
Transmission Service Agreement dated February 28, 1997 and originally
filed under the Company's Open Access Transmission Tariff to Eligible
Purchasers dated July 9, 1996. The original Service Agreement was
approved by the FERC in Docket No. ER97-2511-000 in a Letter Order
dated May 15, 1997.
Virginia Power requests an effective date of January 1, 1998, for
the assignment.
Copies of this filing were served upon FirstEnergy, the Virginia
State Corporation Commission and the North Carolina Utilities
Commission.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
29. Avista Corp.
[Docket No. ER99-4349-000]
Take notice that on September 1, 1999, Avista Corporation (AVA),
tendered for filing with the Federal Energy Regulatory Commission
executed Service Agreements for Long Term Firm and Point-To-Point
Transmission Service under AVA's Open Access Transmission Tariff--FERC
Electric Tariff, Volume No. 8 with Avista Corporation (Power
Marketing).
AVA requests the Service Agreements be given the respective
effective date of August 1, 1999 and September 1, 1999 respectively.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
30. Vermont Electric Power Company, Inc.
[Docket No. ER99-4350-000]
Take notice that on September 1, 1999, Vermont Electric Power
Company, Inc. (VELCO), tendered for filing a non-firm point-to-point
service agreement with Entergy Power Marketing Corporation as a
customer under the terms of VELCO's Local Open Access Transmission
Tariff. VELCO also filed a revised List of Customers With Active
Service Agreements.
VELCO asks that this agreement and the revised List of Customers
become effective as of the date of filing. Accordingly, VELCO requests
a waiver of the Commission's notice requirements.
Copies of this filing were served on the customer, the Vermont
Department of Public Service, and the Vermont Public Service Board.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
31. Vermont Electric Power Company, Inc.
[Docket No. ER99-4351-000]
Take notice that on September 1, 1999, Vermont Electric Power
Company, Inc. (VELCO), tendered for filing a firm point-to-point
service agreement with Entergy Power Marketing Corporation as a
customer under the terms of VELCO's Local Open Access Transmission
Tariff. VELCO also filed a revised List of Customers With Active
Service Agreements.
VELCO asks that this agreement and the revised List of Customers
become effective as of the date of filing. Accordingly, VELCO requests
a waiver of the Commission's notice requirements.
Copies of this filing were served on the customer, the Vermont
Department of Public Service, and the Vermont Public Service Board.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
32. PP&L, Inc.
[Docket No. ER99-4354-000]
Take notice that on September 2, 1999, PP&L, Inc. (PP&L), tendered
for filing a Service Agreement dated August 19, 1999, with Consolidated
Edison Company of New York, Inc. (ConEd) under PP&L's Market-Based Rate
and Resale of Transmission Rights Tariff, FERC Electric Tariff, Revised
Volume No. 5. The Service Agreement adds ConEd as an eligible customer
under the Tariff.
PP&L requests an effective date of September 2, 1999, for the
Service Agreement.
PP&L states that copies of this filing have been supplied to ConEd
and to the Pennsylvania Public Utility Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
33. Middletown Power LLC, Montville Power LLC, Norwalk Power LLC,
Devon Power LLC, and Connecticut Jet Power LLC
[Docket Nos. ER99-4355-000, ER99-4356-000, ER99-4357-000, ER99-4358-000
and ER99-4359-000]
Take notice that on September 1, 1999, Middletown Power LLC,
Montville Power LLC, Norwalk Power LLC, Devon Power LLC, and
Connecticut Jet Power LLC (Sellers), limited liability companies
organized under the laws of the State of Delaware, petitioned the
Commission for an order: (1) accepting Sellers' proposed Rate Schedules
FERC No. 1 (Market-Based Rate Schedule); (2) granting waiver of certain
requirements under Subparts B and C of Part 35 of the regulations, and
(3) granting the blanket approvals normally accorded sellers permitted
to sell at market-based rates. Sellers are indirect subsidiaries of
Northern States Power Company.
Comment date: September 21, 1999, in accordance with Standard
Paragraph E at the end of this notice.
34. Boston Edison Company
[Docket No. ER99-4361-000]
Take notice that on September 2, 1999, Boston Edison Company
(Boston Edison), tendered for filing a service agreement between Boston
Edison as the transmission provider and Entergy Nuclear Generation
Company as the transmission customer. The service agreement provides
for Network Integration Transmission Service under Boston Edison's
Open-Access Transmission Tariff, FERC Volume No. 8.
Boston Edison requests an effective date of November 1, 1999.
Boston Edison states that copies of the filing have been served
upon the affected customer and the Massachusetts Department of
Telecommunications and Energy.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
35. Central Vermont Public Service Corporation
[Docket No. ER99-4362-000]
Take notice that on September 2, 1999, Central Vermont Public
Service Corporation (Central Vermont), tendered for filing a Service
Agreement with Sonat Power Marketing L.P., under its FERC Second
Revised Electric Tariff Volume No. 8.
Central Vermont requests waiver of the Commission's Regulations to
permit the service agreement to become effective on September 1, 1999.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
36. Cinergy Services, Inc.
[Docket No. ER99-4363-000]
Take notice that on September 2, 1999, Cinergy Services, Inc., on
behalf of its Operating Company affiliates, The Cincinnati Gas &
Electric Company and PSI Energy, Inc. (collectively Cinergy Operating
Companies (COC)), tendered for filing an executed service agreement
between COC and Northern Indiana
[[Page 50506]]
Public Service Company (NIPSCO) replacing the unexecuted service
agreement filed on November 28, 1997 under Docket No. ER98-847-000 per
COC FERC Electric Market-Based Power Sales Tariff, Original Volume No.
6-CB.
Cinergy is requesting an effective date of October 29, 1997 and the
same Rate Designation as per the original filing.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
37. Cinergy Services, Inc.
[Docket No. ER99-4364-000]
Take notice that on September 2, 1999, Cinergy Services, Inc., on
behalf of its Operating Company affiliates, The Cincinnati Gas &
Electric Company and PSI Energy, Inc. (collectively Cinergy Operating
Companies (COC)), tendered for filing an executed service agreement
between COC and Northern Indiana Public Service Company (NIPSC)
replacing the unexecuted service agreement filed on November 28, 1997
under Docket No. ER98-847-000 per COC FERC Electric Market-Based Power
Sales Tariff, Original Volume No. 7-MB.
Cinergy is requesting an effective date of October 29, 1997 and the
same Rate Designation as per the original filing.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
38. Duke Energy Corporation
[Docket No. ER99-4365-000]
Take notice that on September 2, 1999, Duke Energy Corporation
(Duke), tendered for filing a Service Agreement with the North Carolina
Municipal Power Agency Number 1, for Non-Firm Transmission Service
under Duke's Open Access Transmission Tariff.
Duke requests that the proposed Service Agreement be permitted to
become effective on August 30, 1999.
Duke states that this filing is in accordance with Part 35 of the
Commission's Regulations and a copy has been served on the North
Carolina Utilities Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
39. Commonwealth Edison Company
[Docket No. ER99-4366-000]
Take notice that on September 2, 1999, Commonwealth Edison Company
(ComEd), tendered for filing an Interconnection Agreement with LSP-
Kendall Energy, LLC (LSP-Kendall).
ComEd requests an effective date of September 3, 1999 and
accordingly seeks waiver of the Commission's notice requirements.
Copies of the filing were served on LSP-Kendall and the Illinois
Commerce Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
40. Virginia Electric and Power Company
[Docket No. ER99-4367-000]
Take notice that on September 2, 1999, Virginia Electric and Power
Company, doing business as North Carolina Power, tendered for filing a
letter agreement supplementing Rate Schedules 102, 114 and 115 of North
Carolina Power for service to the Town of Hertford, North Carolina
(Town), a member municipality of the North Carolina Municipal Power
Agency Number 3 of the North Carolina Eastern Municipal Power Agency
(Power Agency). The letter agreement establishes the terms and
conditions for the temporary and then permanent modification of a
substation in conjunction with the Town's upgrade of its own electric
system and the elimination of the rental fee for the existing
instrument transformers leased by the Power Agency for the Town.
Copies of the filing were served upon the Power Agency, the North
Carolina Utilities Commission and the Virginia State Corporation
Commission.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
41. Niagara Mohawk Power Corporation
[Docket No. ER99-4368-000]
Take notice that on September 2, 1999, Niagara Mohawk Power
Corporation tendered for filing an Interconnection Agreement between
Niagara Mohawk Power Corporation and Northbrook New York LLC dated as
of August 20, 1999.
Niagara Mohawk Power Corporation requests an effective date of the
Closing Date of the sale of the Northbrook generating facility. To the
extent necessary, Niagara Mohawk Power Corporation requests waiver of
the Commission requirement that a rate schedule be filed not less than
60 days or more than 120 days from its effective date.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
42. ProLiance Energy, LLC
[Docket No. ER99-4380-000]
Take notice that on September 2, 1999, ProLiance Energy, LLC
(ProLiance), tendered for filing proposed changes in its FERC Electric
Service Tariff Rate Schedule No. 1 and a Notification of a Change in
Status. The changes consist of restrictions on the sale of power and
non-power goods and services between ProLiance and Southern Indiana Gas
& Electric Company (SIGECO), based on a proposed merger between Indiana
Energy, Inc. and SIGCORP, Inc., that would result in ProLiance becoming
an affiliate of SIGECO, a subsidiary of SIGCORP, and the accompanying
Code of Conduct.
Copies of the filing were served upon ProLiance's jurisdictional
customers.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
43. PDI--New England & PDI--Canada
[Docket No. ER99-4381-000]
Take notice that on September 2, 1999, PDI--New England & PDI--
Canada filed its quarterly report for the quarter ending June 30, 1999.
Comment date: September 22, 1999, in accordance with Standard
Paragraph E at the end of this notice.
44. PacifiCorp
[Docket No. ER99-4390-000]
Take notice that on September 7, 1999, PacifiCorp filed its
quarterly report for the quarter ending June 30, 1999.
Comment date: September 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of these filings are on file with the Commission and
are available for public inspection. This filing may also be viewed on
the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-24212 Filed 9-16-99; 8:45 am]
BILLING CODE 6717-01-P