95-23058. Power Rate Adjustment: Mission Valley Power Utility, Montana  

  • [Federal Register Volume 60, Number 180 (Monday, September 18, 1995)]
    [Notices]
    [Pages 48346-48347]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23058]
    
    
    
    
    [[Page 48345]]
    
    _______________________________________________________________________
    
    Part V
    
    
    
    
    
    Department of the Interior
    
    
    
    
    
    _______________________________________________________________________
    
    
    
    Bureau of Indian Affairs
    
    
    
    _______________________________________________________________________
    
    
    
    Power Rate Adjustment; Mission Valley Power Utility, Montana; Notice
    
    Federal Register / Vol. 60, No. 180 / Monday, September 18, 1995 / 
    Notices
    
    [[Page 48346]]
    
    
    DEPARTMENT OF THE INTERIOR
    
    Bureau of Indian Affairs
    
    
    Power Rate Adjustment: Mission Valley Power Utility, Montana
    
    ACTION: Notice of Proposed Rate Increase.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Bureau of Indian Affairs is proposing to increase the cost 
    of electric power (energy) to customers of Mission Valley Power (MVP), 
    the entity operating the power facility of the Flathead Indian 
    Irrigation Project of the Flathead Reservation. The Bureau of Indian 
    Affairs (BIA) has been informed that the Montana Power Company (MPC), 
    which sells electric power to MVP, has raised its wholesale power rates 
    by approximately 2.0 percent. The MPC increase went into effect on 
    September 5, 1995, and is based on adjustments in the Consumer Price 
    index pursuant to the Federal Energy Regulatory Commission license for 
    MPC's Kerr Dam Hydroelectric Facility. Accordingly, the BIA is 
    proposing to adjust the local retail power rates charged by MVP to 
    reflect the increased cost of purchased power.
    
    DATES: Comments must be submitted on or before October 18, 1995.
    
    ADDRESSES: Written comments on rate changes should be sent to: 
    Assistant Secretary--Indian Affairs, Bureau of Indian Affairs, Attn: 
    Branch of Irrigation and Power, MS#4559-MIB, 1849 ``C'' Street NW., 
    Washington, DC 20240.
    
    FOR FURTHER INFORMATION CONTACT: Area Director, Bureau of Indian 
    Affairs, Portland Area Office, 911 N.E. 11th Avenue, Portland, Oregon 
    97232-4169, telephone (503) 231-6702; or, General Manager, Mission 
    Valley Power, P.O. Box 890, Polson, Montana 59860-0890. Telephone (406) 
    883-5361 or 1-800-823-3758 (in-State Watts).
    
    SUPPLEMENTARY INFORMATION: The authority to issue this document is 
    vested in the Secretary of the Interior by 5 U.S.C. 301; the Act of 
    August 7, 1946, c. 802, Section 3 (60 Stat. 895; 25 U.S.C. 385c); the 
    Act of May 25, 1948 (62 Stat. 269); and the Act of December 23, 1981, 
    section 112 (95 Stat. 1404). The Secretary has delegated this authority 
    to the Assistant Secretary--Indian Affairs pursuant to part 209 
    Departmental Manual, Chapter 8. 1A and Memorandum dated January 25, 
    1994, from Chief of Staff, Department of the Interior, to Assistant 
    Secretaries, and Heads of Bureaus and Offices. The approximate 2.0 
    percent MPC increase causes the BIA to raise its retail rates to 
    recover $28,000 which is the approximate annual financial impact of 
    that increase. This proposed adjustment is the result of an increase in 
    the electric power rates charged by MPC, one of three sources of 
    electric power marketed by MVP. The MPC increase, which went into 
    effect on September 5, 1995, is based on adjustments in the Consumer 
    Price index pursuant to the Federal Energy Regulatory Commission 
    license for MPC's Kerr Dam Hydroelectric Facility. The following table 
    illustrates the financial impact of the new retail rates on each rate 
    class:
    
    ----------------------------------------------------------------------------------------------------------------
            Rate class                                     Present rate                                 New rate    
    ----------------------------------------------------------------------------------------------------------------
    Residential:                                                                                                    
        Basic Charge..........  $11.00/mo. (includes 125kwh)......................................  No Change       
        Energy Charge.........  0.04817/kwh (over 122 kwh)........................................  $0.04828        
    #2 General:                                                                                                     
        Basic Charge..........  11.00/mo. (includes 107 kwh)......................................  No Change       
        Energy Charge.........  0.05604/kwh (over 107 kwh)........................................  0.05615         
    Irrigation:                                                                                                     
        Horsepower Charge.....  11.25/HP..........................................................  11.30/HP        
        Energy Charge.........  0.03638/kwh.......................................................  0.03642         
        Minimum Seasonal        132.00 or $6.00/HP, whichever is greater..........................  No Change       
         Charge.                                                                                                    
    Small and Large                                                                                                 
     Commercial:                                                                                                    
        Basic Charge..........  None..............................................................  No Change       
        Monthly Minimum.......  38.00.............................................................  No Change       
        Demand Rate...........  4.50/KW of billing demand.........................................  4.51/KW         
        Energy Rate...........  0.04305/kwh--First 18,000 kwh.....................................  0.04345         
                                0.03588/kwh--Over 18,000 kwh......................................  0.03592         
    Area Lights:                                                                                                    
      Area light installed on                                                                                       
       existing pole or                                                                                             
       structure:                                                                                                   
        7,000 lumen unit,       7.00..............................................................  7.00            
         M.V.*.                                                                                                     
        20,000 lumen unit,      10.00.............................................................  10.00           
         M.V.*.                                                                                                     
        9,000 lumen unit,       6.50..............................................................  6.50            
         H.P.S..                                                                                                    
        22,000 lumen unit,      8.75..............................................................  8.75            
         H.P.S..                                                                                                    
      Area light installed                                                                                          
       with new pole:                                                                                               
        7,000 lumen unit,       8.75..............................................................  8.75            
         M.V.*.                                                                                                     
        20,000 lumen unit,      11.50.............................................................  11.50           
         M.V.*.                                                                                                     
        9,000 lumen unit,       8.25..............................................................  8.25            
         M.V.*.                                                                                                     
        22,000 lumen unit,      10.50.............................................................  10.50           
         H.P.S*.                                                                                                    
    Street Lighting (metered):                                                                                      
        Basic Charge..........  11.00/mo (includes 107kwh)........................................  11.00           
        Energy Charge.........  0.0560/kwh (over 107 kwh).........................................  0.05615         
    Street Lighting             This rate class applies to municipalities or communities where      No Change       
     (Unmetered).                there are ten or more lighting units billed in a group. This rate                  
                                 schedule is subject to a negotiated contract with MVP.                             
    ----------------------------------------------------------------------------------------------------------------
    *Continuing service only.                                                                                       
    
    
    [[Page 48347]]
    
        Dated: September 12, 1995.
    Ada E. Deer,
    Assistant Secretary, Indian Affairs.
    [FR Doc. 95-23058 Filed 9-15-95; 8:45 am]
    BILLING CODE 4310-02-P
    
    

Document Information

Published:
09/18/1995
Department:
Indian Affairs Bureau
Entry Type:
Notice
Action:
Notice of Proposed Rate Increase.
Document Number:
95-23058
Dates:
Comments must be submitted on or before October 18, 1995.
Pages:
48346-48347 (2 pages)
PDF File:
95-23058.pdf