98-25016. Florida Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 181 (Friday, September 18, 1998)]
    [Notices]
    [Page 49905]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-25016]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-765-000]
    
    
    Florida Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    September 14, 1998.
        Take notice that on September 4, 1998, Florida Gas Transmission 
    Company, (FGT) 1400 Smith Street, Houston, Texas 77002, filed in Docket 
    No. CP98-765-000 a request pursuant to Sections 157.205 and 157.212 of 
    the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.212). FGT filed for authorization to certificate an existing 
    delivery point in Galveston, Texas, under FGT's blanket certificate 
    issued in Docket No. CP82-553, pursuant to Section 7 of the Natural Gas 
    Act, all as more fully set forth in the request that is on file with 
    the Commission and open to public inspection.
        FGT constructed the ``Tejas Dickenson'' delivery point under 
    Section 284.3 of the Regulations to provide Section 311 transportation 
    for Tejas Ship Channel, LLC (TEJAS). The ``Tejas Dickenson'' delivery 
    point, located at FGT's 22-inch mainline and Tejas' 12-inch pipeline in 
    Galveston, consists of a 6-inch tap valve and electronic flow 
    measurement instrumentation. TEJAS owns the meter and connecting 6-inch 
    pipeline and appurtenant facilities necessary for FGT to deliver gas to 
    TEJAS.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-25016 Filed 9-17-98; 8:45 am]
    BILLING CODE 6717-01-N
    
    
    

Document Information

Published:
09/18/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-25016
Pages:
49905-49905 (1 pages)
Docket Numbers:
Docket No. CP98-765-000
PDF File:
98-25016.pdf