2018-20188. Hazardous Materials: Emergency Waiver No. 6  

  • Start Preamble Start Printed Page 47239

    AGENCY:

    Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.

    ACTION:

    Notice of emergency waiver order.

    SUMMARY:

    The Pipeline and Hazardous Materials Safety Administration is issuing an emergency waiver order to persons conducting operations under the direction of Environmental Protection Agency (EPA) Regions 3 or 4 or United States Coast Guard (USCG) Fifth or Seventh Districts within the Hurricane Florence emergency areas of South Carolina, North Carolina, and Virginia. The Waiver is granted to support the EPA and USCG in taking appropriate actions to prepare for, respond to, and recover from a threat to public health, welfare, or the environment caused by actual or potential oil and hazardous materials incidents resulting from Hurricane Florence. This Waiver Order is effective immediately and shall remain in effect for 30 days from the date of issuance.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Adam Horsley, Deputy Assistant Chief Counsel for Hazardous Materials Safety, Pipeline and Hazardous Materials Safety Administration, telephone: (202) 366-4400.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In accordance with the provisions of 49 U.S.C. 5103(c), the Administrator for the Pipeline and Hazardous Materials Safety Administration (PHMSA), hereby declares that an emergency exists that warrants issuance of a Waiver of the Hazardous Materials Regulations (HMR, 49 CFR parts 171-180) to persons conducting operations under the direction of Environmental Protection Agency (EPA) Regions 3 or 4 or United States Coast Guard (USCG) Fifth or Seventh Districts within the Hurricane Florence emergency areas of South Carolina, North Carolina, and Virginia. The Waiver is granted to support the EPA and USCG in taking appropriate actions to prepare for, respond to, and recover from a threat to public health, welfare, or the environment caused by actual or potential oil and hazardous materials incidents resulting from Hurricane Florence.

    On September 10, 2018, the President issued an Emergency Declaration for Hurricane Florence for all 46 South Carolina counties and the Catawba Indian Nation (EM 3400). On September 10, 2018, the President also issued an Emergency Declaration for Hurricane Florence for all 100 North Carolina counties and the Eastern Band of Cherokee Indians (EM 3401). On September 11, 2018, the President issued an Emergency Declaration for Hurricane Florence for the entire Commonwealth of Virginia (EM 3403).

    This Waiver Order covers all areas identified in the three declarations, as amended. Pursuant to 49 U.S.C. 5103(c), PHMSA has authority delegated by the Secretary (49 CFR 1.97(b)(3)) to waive compliance with any part of the HMR provided that the grant of the waiver is: (1) In the public interest; (2) not inconsistent with the safety of transporting hazardous materials; and (3) necessary to facilitate the safe movement of hazardous materials into, from, and within an area of a major disaster or emergency that has been declared under the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.).

    Given the continuing impacts caused by Hurricane Florence, PHMSA's Administrator has determined that regulatory relief is in the public interest and necessary to ensure the safe transportation in commerce of hazardous materials while the EPA and USCG execute their recovery and cleanup efforts in South Carolina, North Carolina, and Virginia. Specifically, PHMSA's Administrator finds that issuing this Waiver Order will allow the EPA and USCG to conduct their Emergency Support Function #10 response activities under the National Response Framework to safely remove, transport, and dispose of hazardous materials. By execution of this Waiver Order, persons conducting operations under the direction of EPA Regions 3 or 4 or USCG Fifth or Seventh Districts within the Hurricane Florence emergency areas of South Carolina, North Carolina, and Virginia are authorized to offer and transport non-radioactive hazardous materials under alternative safety requirements imposed by EPA Regions 3 or 4 or USCG Fifth or Seventh Districts when compliance with the HMR is not practicable. Under this Waiver Order, non-radioactive hazardous materials may be transported to staging areas within 50 miles of the point of origin. Further transportation of the hazardous materials from staging areas must be in full compliance with the HMR.

    This Waiver Order is effective immediately and shall remain in effect for 30 days from the date of issuance.

    Start Signature

    Issued in Washington, DC, on September 12, 2018.

    Howard R. Elliott,

    Administrator, Pipeline and Hazardous Materials Safety Administration.

    End Signature End Supplemental Information

    [FR Doc. 2018-20188 Filed 9-17-18; 8:45 am]

    BILLING CODE 4910-60-P