95-23129. Notice of Availability for the Round Mountain Mill and Tailings Facility Draft Environmental Impact Statement and Notice of Comment Period and Public Meetings  

  • [Federal Register Volume 60, Number 181 (Tuesday, September 19, 1995)]
    [Notices]
    [Pages 48518-48519]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23129]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Bureau of Land Management
    [NV-060-1990-01]
    
    
    Notice of Availability for the Round Mountain Mill and Tailings 
    Facility Draft Environmental Impact Statement and Notice of Comment 
    Period and Public Meetings
    
    AGENCY: Bureau of Land Management, Department of the Interior.
    
    ACTION: Notice of availability for the Round Mountain Mill and Tailings 
    Facility Draft Environmental Impact Statement (EIS), for the Smoky 
    Valley Common Operation, Nye County, Nevada; and notice of comment 
    period and public meetings.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Pursuant to section 102(2)(C) of the National Environmental 
    Policy Act, 40 CFR 1500-1508, and 43 CFR 3809, notice is given that the 
    Bureau of Land Management (BLM) has prepared, with the assistance of a 
    third-party consultant, a Draft EIS on the proposed Round Mountain Mill 
    and Tailings Facility, and has made copies available for public and 
    agency review.
    
    DATES: Written comments on the Draft EIS must be submitted or 
    postmarked to the BLM no later than November 22, 1995. Oral and/or 
    written comments may also be presented at two public meetings, to be 
    held:
    
    October 17, 1995; 7 p.m.; Donald Simpson Community Center, Hadley, 
    Nevada
    October 18, 1995; 7 p.m.; Airport Plaza Hotel, 1981 Terminal Way, 
    Reno, Nevada
    
    ADDRESSES: Written comments on the Draft EIS should be addressed to: 
    Bureau of Land Management, Battle Mountain District, Post Office Box 
    1420, Battle Mountain, Nevada 89820, Attn.: Christopher J. Stubbs, 
    Round Mountain EIS Project Manager. A limited number of copies of the 
    Draft EIS may be obtained at the same address. In addition, the Draft 
    EIS and supporting documentation are available for review at the 
    following locations: BLM, Battle Mountain District Office, Battle 
    Mountain, Nevada; BLM, Nevada State Office, Reno, Nevada; and the 
    Getchell Library, University of Nevada, Reno, Nevada.
    
    
    [[Page 48519]]
    
    FOR FURTHER INFORMATION CONTACT: Christopher J. Stubbs, Round Mountain 
    EIS Project Manager, Bureau of Land Management, Post Office Box 1420, 
    Battle Mountain, Nevada 89820, (702) 635-4000.
    
    SUPPLEMENTARY INFORMATION: The Smoky Valley Common Operation has 
    submitted a Plan of Operations Amendment for the construction, 
    operation, and reclamation of a mill and tailings facility at the Round 
    Mountain Mine. The mine currently consists of 4,767 acres of surface 
    disturbance: 3,659 acres of land administered by the BLM, 515 acres of 
    land administered by the Toiyabe National Forest, and 593 acres of 
    patented land owned by the Smoky Valley Common Operation. The proposed 
    facilities would comprise an expansion of the existing operation at the 
    Round Mountain Mine to improve the recovery of gold from ore that is 
    being mined from the existing open pit. Ancillary facilities would 
    include a new primary crusher; a power line; fresh water, reclaim 
    water, and tailings pipelines; and a septic system. The proposed 
    facilities would be located on approximately 757 acres of public land 
    administered by the BLM, Battle Mountain District Office, Tonopah 
    Resource Area. Of this acreage, approximately 250 acres occur on public 
    lands outside of the existing permit boundary. Construction is 
    scheduled to begin in early 1996; operation of the mill and tailings 
    facility would begin in 1997 and continue until 2008.
        This Draft EIS analyzes the environmental impacts associated with 
    the proposed mill and tailings facility and ancillary facilities, a 
    range management alternative, an alternative tailings impoundment site, 
    and the no action alternative. In addition, the Draft EIS analyzes 
    potential impacts associated with pit dewatering and pit water quality, 
    and the leach offload piles. Issues analyzed in the Draft EIS include 
    geology and minerals, water resources, soils and watershed, vegetation, 
    wildlife and fisheries, range resources, paleontological resources, 
    cultural resources and Native American concerns, air quality, access 
    and land use, recreation and wilderness, social and economic values, 
    visual resources, noise, and hazardous materials.
        A copy of the Draft EIS has been sent to all individuals, agencies, 
    and groups who have expressed interest in the project or as mandated by 
    regulation or policy. A limited number of copies are available upon 
    request from the BLM at the address listed above.
        Public participation has occurred during the EIS process. A Notice 
    of Intent was filed in the Federal Register in August 1993, and an open 
    scoping period was held for 120 days. Two public scoping meetings to 
    solicit comments and ideas were held in November 1993, and a newsletter 
    was issued to keep the public informed of the progress of the EIS. All 
    comments presented to the BLM throughout the EIS process have been 
    considered.
        To assist the BLM in identifying and considering issues and 
    concerns on the proposed action and alternatives, comments on the Draft 
    EIS should be as specific as possible. It is also helpful if comments 
    refer to specific pages or chapters in the document. Comments may 
    address the adequacy of the Draft EIS and/or the merits of the 
    alternatives formulated and discussed in the document. Reviewers may 
    wish to refer to the Council on Environmental Quality Regulations for 
    Implementing the Procedural Provisions of the National Environmental 
    Policy Act at 40 CFR 1503.3 in addressing these points. After the 
    comment period ends on the Draft EIS, comments will be analyzed and 
    considered by the BLM in preparing the Final EIS.
    
        Dated: September 12, 1995.
    Jeffrey A. Weeks,
    Acting District Manager.
    [FR Doc. 95-23129 Filed 9-18-95; 8:45 am]
    BILLING CODE 4310-HC-P
    
    

Document Information

Published:
09/19/1995
Department:
Land Management Bureau
Entry Type:
Notice
Action:
Notice of availability for the Round Mountain Mill and Tailings Facility Draft Environmental Impact Statement (EIS), for the Smoky Valley Common Operation, Nye County, Nevada; and notice of comment period and public meetings.
Document Number:
95-23129
Dates:
Written comments on the Draft EIS must be submitted or postmarked to the BLM no later than November 22, 1995. Oral and/or written comments may also be presented at two public meetings, to be held:
Pages:
48518-48519 (2 pages)
Docket Numbers:
NV-060-1990-01
PDF File:
95-23129.pdf