95-23231. Pacific Northwest-Pacific Southwest Intertie Project Transmission Service, Phoenix Area  

  • [Federal Register Volume 60, Number 181 (Tuesday, September 19, 1995)]
    [Notices]
    [Pages 48513-48514]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-23231]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Western Area Power Administration
    
    
    Pacific Northwest-Pacific Southwest Intertie Project Transmission 
    Service, Phoenix Area
    
    AGENCY: Western Area Power Administration, DOE.
    
    ACTION: Notice of sale of additional capacity on the Pacific Northwest-
    Pacific Southwest Intertie Project.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Western Area Power Administration (Western) is requesting 
    comments on the proposed sale of firm transmission service available as 
    a result of the completion of construction of the Mead-Phoenix and 
    Mead-Adelanto Transmission Projects which are a part of the Pacific 
    Northwest-Pacific Southwest Intertie Project (AC Intertie).
    
    DATE: Comments from all interested parties will be accepted until 
    October 19, 1995.
    
    FOR FURTHER INFORMATION CONTACT: Mr. J. Tyler Carlson, Area Manager, 
    Phoenix Area Office, Western Area Power Administration, P.O. Box 6457, 
    Phoenix, AZ 85005-6457, Telephone: (602) 352-2521, Facsimile: (602) 
    352-2630.
    
    SUPPLEMENTARY INFORMATION:
    
    Background
    
        The Mead-Phoenix Project (MPP) is an electrical transmission system 
    that consists of 256 miles of 500-kV alternating current, convertible 
    to direct current, transmission line constructed from the Perkins 
    Switchyard, located next to Westwing Substation, northwest of Phoenix, 
    Arizona; through Mead Substation, located south of Boulder City, 
    Nevada; and on to Marketplace Switching Station. Mead-Adelanto Project 
    (MAP) is an electrical transmission system that consists of 202 miles 
    of 500-kV AC transmission line from Marketplace Substation to Adelanto 
    Switching Station in southern California. The 500-kV Marketplace 
    Switching Station will be constructed adjacent to and interconnected 
    with the existing McCullough Switching Station in southern Nevada. As 
    part of the MPP, a 1300 megavolt-ampere (MVA), 500/230-kV transformer 
    will be added to the Mead Substation. Western will have approximately 
    525 MW of capacity entitlement on this transformer.
    
    Marketing Issues
    
        Western is requesting comments on the proposed sale of additional 
    capacity in the AC Intertie created by the completion and availability 
    of MPP and MAP. The quantity of marketable capacity will be limited by 
    Western's entitlement to the available capacity. The additional 
    capacity on the AC Intertie is anticipated to be available as of 
    January 1, 1996. Western's contracted firm transmission service will 
    begin after the MPP and MAP are released for commercial service.
    
    Marketing Criteria
    
        Western will be marketing the capacity from MPP and MAP by line 
    segments in each direction. The following priority method will be used 
    in selecting allotees for this additional capacity and will be based on 
    requests for usage of each line segment as follows:
    
    1. Perkins to Mead, Mead to Marketplace or Marketplace to Adelanto
        (a) Both directions, same amount
        (b) Both directions, different amounts
        (c) one direction only
    2. Perkins to Marketplace or Mead to Adelanto
        (a) Both directions, same amount
        (b) Both directions, different amounts
        (c) one direction only
    3. Perkins to Adelanto
        (a) Both directions, same amount
        (b) Both directions, different amounts
        (c) one direction only.
    
    
    [[Page 48514]]
    
        Where the priority of requests will be in the following order: 
    1(a), 1(b), 1(c); 2(a), 2(b), 2(c); 3(a), 3(b), 3(c).
        Where if any one path is oversubscribed, the allocations will be 
    prorated.
    
    Marketable Resource
    
    ------------------------------------------------------------------------
          Point of receipt              Point of delivery         Capacity  
    ------------------------------------------------------------------------
    Perkins Switchyard..........  Mead Substation.............  412 MW.     
    Mead Substation.............  Perkins Switchyard..........  412 MW.     
    Mead Substation.............  Marketplace Switching         580 MW.     
                                   Station.                                 
    Marketplace Switching         Mead Substation.............  580 MW.     
     Station.                                                               
    Marketplace Switching         Adelanto Switching Station..  100 MW.     
     Station.                                                               
    Adelanto Switching Station..  Marketplace Switching         100 MW.     
                                   Station.                                 
    ------------------------------------------------------------------------
    
    Selection Process
    
        Based on the comments received on this proposal, Western will 
    furnish the terms, conditions, and procedures governing the selection 
    of allotees in the next Federal Register notice to be published by mid-
    October 1995. The mid-October Federal Register notice will also provide 
    a mechanism for applications of requests for transmission capacity.
        Applicant deadline and Western's schedule will also be published in 
    the mid-October Federal Register notice.
    
    Other Issues
    
        The proposed rate for the additional capacity resulting from the 
    completion of MPP and MAP will be set forth in a public rate process 
    currently under way in the Phoenix Area Office. The proposed rate will 
    be based on Western's expectation that the Marketable Capacity used in 
    the proposed rate calculation for the 500-kV transmission lines will be 
    668 MW. A rate for firm transmission service will be determined in the 
    public rate process.
    
    Determination Under Executive Order 12866
    
        DOE has determined that this is not a significant regulatory action 
    because it does not meet the criteria of Executive Order 12866 (58 FR 
    51735). Western has an exemption from centralized regulatory review 
    under Executive Order 12866; accordingly, no clearance of this notice 
    by the Office of Management and Budget is required.
    
    Environmental Evaluation
    
        Western will comply with the National Environmental Policy Act 
    (NEPA) of 1969, 42 U.S.C. 4321 et seq.; Council On Environmental 
    Quality (40 CFR Parts 1500-1508) and DOE NEPA regulations (10 CFR Parts 
    1500-1508) and DOE NEPA regulations (10 CFR Part 1021). Western has 
    determined that this action is categorically excluded from the 
    preparation of an environmental assessment or an environmental impact 
    statement.
    
        Issued in Golden, Colorado, September 7, 1995.
    J. M. Shafer,
    Administrator
    [FR Doc. 95-23231 Filed 9-18-95; 8:45 am]
    BILLING CODE 6450-01-P
    
    

Document Information

Published:
09/19/1995
Department:
Western Area Power Administration
Entry Type:
Notice
Action:
Notice of sale of additional capacity on the Pacific Northwest- Pacific Southwest Intertie Project.
Document Number:
95-23231
Dates:
Comments from all interested parties will be accepted until October 19, 1995.
Pages:
48513-48514 (2 pages)
PDF File:
95-23231.pdf