[Federal Register Volume 63, Number 170 (Wednesday, September 2, 1998)]
[Notices]
[Page 46790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-23589]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11060-000 Idaho]
J.M. Miller Enterprises, Inc.; Notice of Availability of Draft
Environmental Assessment
August 27, 1998.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office
of Hydropower Licensing has reviewed the application for an original,
minor license for the proposed Sahko Hydroelectric Project, and has
prepared a Draft Environmental Assessment (DEA) for the project. The
project would be located on the Kastelu Drain, an irrigation return
ditch also known as Southside 39 Drain, near Filer, Idaho in Twin Falls
County. The DEA contains the Commission staff's analysis of the
potential future environmental impacts of the project and has concluded
that licensing the project, with appropriate environmental protective
measures, would not constitute a major federal action that would
significantly affect the quality of the human environment.
Copies of the DEA are available for review in the Public Reference
Room, Room 2A, of the Commission's offices at 888 First Street, NE.,
Washington, DC 20426.
Any comments should be filed within 30 days from the date of this
notice and should be addressed to David P. Boergers, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. For further information, contact Nan Allen, Environmental
Coordinator, at (202) 219-2938, or E-mail nan.allen@ferc.fed.us.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-23589 Filed 9-1-98; 8:45 am]
BILLING CODE 6717-01-M