[Federal Register Volume 63, Number 170 (Wednesday, September 2, 1998)]
[Notices]
[Pages 46786-46787]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-23594]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER92-65-001, et al.]
Northeast Utilities Company, et al.; Electric Rate and Corporate
Regulation Filings
August 24, 1998.
Take notice that the following filings have been made with the
Commission:
1. Northeast Utilities Service Co.
[Docket No. ER88-463-001, ER90-373-000, ER90-390-000, EL90-39-000]
Take notice that on August 19, 1998, Northeast Utilities Service
Company, in compliance with the order of the Federal Energy Regulatory
Commission in Northeast Utilities Service Company, et al., 83 FERC
61,184 (1998), submitted revised pages to the transmission service
agreements filed in the above-referenced dockets. Copies of the
compliance filing were served on the customers taking service under the
agreements.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
2. Northeast Utilities Service Company
[Docket No. ER92-65-001]
Taken notice that on August 19, 1998, Northeast Utilities Service
Company, in compliance with the order of the Federal Energy Regulatory
Commission in Northeast Utilities Service Company, et al., 83 FERC
61,184 (1998), submitted revised pages to the transmission service
agreement filed in the above-referenced docket. Copies of the
compliance filing were served on the customer taking service under the
agreement.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
3. Northeast Utilities Service Company
[Docket No. ER92-66-001]
Take notice that on August 19, 1998, Northeast Utilities Service
Company, in compliance with the order of the Federal Energy Regulatory
Commission in Northeast Utilities Service Company, et al., 83 FERC
61,184 (1998), submitted revised pages to the transmission service
agreement filed in the above-referenced docket. Copies of the
compliance filing were served on the customer taking service under the
agreement.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
4. Northeast Utilities Service Company
[Docket No. ER93-219-004]
Take notice that on August 19, 1998, Northeast Utilities Service
Company, in compliance with the order of the Federal Energy Regulatory
Commission in Northeast Utilities Service Company, et al., 83 FERC
61,184 (1998), submitted revised pages to the transmission service
agreement filed in the above-referenced docket. Copies of the
compliance filing were served on the
[[Page 46787]]
customer taking service under the agreement.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
5. PJM Interconnection, L.L.C.
Docket No. ER97-3189-011]
Take notice that on August 19, 1998, PJM Interconnection, L.L.C.
(PJM), tendered for filing revised tariff sheets in compliance with the
Commission's order in PJM Interconnection, L.L.C., 84 FERC 61,051
(1998).
PJM requests an effective date for the tariff revisions submitted
with the compliance filing of April 1, 1998, consistent with the
effective date of the revised PJM Tariff.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
6. California Independent System Operator Corporation
[Docket No. ER98-1310-001]
Take notice that on August 19, 1998, the California Independent
System Operator Corporation (ISO), tendered for filing Amendment No. 2,
to the Participating Generator Agreement between the ISO and El Sequndo
Power, LLC (El Segundo), for acceptance by the Commission. The ISO
states that Amendment No. 2, modifies the Participating Generator
Agreement by extending the date by which El Segundo must obtain
certification by the ISO in accordance with Section 4.3.2 of the
agreement.
The ISO requests waiver of the 60-day prior notice requirements, so
that Amendment No. 2, may become effective as of July 1, 1998.
The ISO states that this filing has been served on all parties
listed on the Restricted Service List in the above-referenced docket.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
7. California Independent System Operator Corporation
[Docket No. ER98-1933-001]
Take notice that on August 19, 1998, the California Independent
System Operator Corporation (ISO), tendered for filing Amendment No. 1,
to the Participating Generator Agreement between the ISO and Long Beach
Generation LLC (Long Beach) for acceptance by the Participating
Generator Agreement by extending the date by which Section 4.3.2 of the
agreement.
The ISO states that this filing has been served on all parties
listed on the Restricted Service List in the above-referenced docket.
Comment date: September 8, 1998, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of these filings are on file with the Commission and
are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-23594 Filed 9-1-98; 8:45 am]